Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Stopped
Review Details: REVISN TENT PLAT & CORE RESUB
Plan Number - S04-032
Review Name: REVISN TENT PLAT & CORE RESUB
Review Status: Stopped
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/05/2008 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Stop | |
03/05/2008 | ANY | ZONING-DECISION LETTER | REVIEW | Stopped | |
03/05/2008 | ANY | ZONING | REVIEW | Stopped | |
03/05/2008 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Stopped | |
03/10/2008 | JIM EGAN | COT NON-DSD | FIRE | Approved | |
03/13/2008 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | Submit a revised landscape plan showing the proposed revisions to sidewalks, covered parking, building outlines, revised bike parking locations, etc. as applicable and relocating plantings as necessary. |
03/17/2008 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approved | |
03/18/2008 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 03/18/2008, TO: Patricia Gehlen FROM: Laith Alshami, P.E. CDRC Engineering SUBJECT: Tanque Verde Center S04-032, T13S, R15E, SECTION 32 RECEIVED: Tentative Plat on March 06, 2008 The subject project has been reviewed. After checking with DSD inspector for this project, concerning the proposed modifications, the following was determined: 1. The revised Tentative Plat does not include all the field revisions that have already been made. 2. Some of the field revisions, whether shown on the plat or not, are not acceptable and need to be revised or removed and replaced if they have already been installed. We recommend that the Engineer of Record inspect the project and evaluate the field changes. Any changes that are not acceptable and do not meet engineering standards or applicable codes, shall be pointed out and corrected in the field. Once the engineer of Record determines that the project is acceptable, he/she shall send a compliance letter to DSD Engineering requesting a DSD inspection. Once our inspector accepts the field modifications, a revised tentative plat shall be prepared accordingly and re-submitted to the DSD for review and approval. Please be advised that grading as-built plan can only be submitted after the revised Tentative Plat process is completed. |