Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT REVIEW
Plan Number - S04-024
Review Name: FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/29/2004 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
10/01/2004 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Denied | SUBJECT: DESERT POINT ESTATES Lots 1-76 S04-024 Tucson Electric Power Company (TEP) has received the final plat for review dated September 28, 2004. This Company is unable to approve the plat at this time. An electrical design to determine our easement requirements will be provided on the Approved Tentative Plat with working days upon receipt of the plat. At the customer's request, a design can be provided prior to the Approved Tentative Plat, however, once a design is provided, any design changes may be billable to the developer. Please contact me at (520) 917-8745 if you have any questions. Liza Castillo Land Management Tucson Electric Power Company lcastillo@tep.com Office: (520) 917-8745 Cell Phone: (520) 904-2668 Fax: (520) 917-8700 |
10/01/2004 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S04-024 DESERT POINT ESTATES/FINAL PLAT DATE: 9/30/04 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. ***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through the Pima County Subdivision Coordinator. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County’s Geographic Information System. Your support is greatly appreciated.*** |
10/21/2004 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Denied | October 21, 2004 TO: Wocky Redsar Castro Engineering THRU: Craig Gross City of Tucson, Development Services Department FROM: Dickie Fernández, E.I.T. Pima County Development Services Department Development Review Division (Wastewater) SUBJECT: Desert Point Estates, Lots 1-76 and Common Areas A-C Final Plat – 1st Submittal S04-024 The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. SHEET 1. Revise the third paragraph of the Dedication to read WE HEREBY GRANT TO THE PUBLIC AND ALL UTILITY COMPANIES ALL PUBLIC EASEMENTS AS SHOWN HEREON FOR THE PURPOSES OF ACCESS, INSTALLATION AND MAINTENANCE OF PUBLIC SEWERS AND UTILITIES AND OTHER USES AS DESIGNATED BY THIS PLAT. SHEET 2. Delete key note 5 throughout the layout. A public Sewer Service Agreement for the proposed number of residential lots has been sent to your office. After three original Sewer Service Agreements have been signed by the Owner of Record, the three originals should be returned to Pima County Wastewater Management in order to satisfy the necessary requirements needed to approve the Mylars of the final plat. We will require a revised set of drawings and a response letter addressing each comment. Additional comments may be made during the review of these documents. The next submittal of this project will be the 2nd submittal. A check for the review fee of this submittal in the amount of $100.00 made out to PIMA COUNTY TREASURER must accompany the revised set of bluelines and response letter. For any questions regarding the fee schedule, please go to http://www.pimaxpress.com/SubDivision/Documents/Fees.PDF where you may find the appropriate wastewater review fees at the bottom of page 1. If the number of sheets changes, please adjust the review fee accordingly. If you have any questions regarding the above mentioned comments, please contact me. Sincerely, Dickie Fernández, E.I.T. Telephone: (520) 740-6947 Copy: Project |
10/26/2004 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Denied | SUBJECT: Desert Point Estates Final Plat Engineering Review REVIEWER: Elizabeth Eberbach ACTIVITY NUMBER: S04-024 LOCATION: T15S R14E Section 10 SUMMARY: The Final Plat marked "preliminary", and the draft of the CC&R's were received by Engineering on September 29, 2004. Engineering has reviewed the received items. Engineering Division does not recommend approval of the Final Plat at this time. Please address the following comments. FINAL PLAT COMMENTS: 1) City of Tucson Development Standards (DS) Section No.2-03.6.6: The draft of the Covenants, Conditions, and Restrictions appear acceptable; please submit original signed copy. 2) DS Sec.2-03.6.5.C.3: Provide boundary closure calculation sheets for both portions of the project. 3) DS Sec.2-03.6.5.C.1.a: For the basis of bearing, provide reference to a record of survey or a recorded plat. 4) DS Sec.2-03.6.5.A: At least one corner of the subdivision needs to be tied by course and distance to one of the quarter / section corners or an established City or County survey monument. 5) DS Sec.2-03.9.3.B: Remove "preliminary…" notation from sheets; the plat will contain the signature and seal of the land surveyor. 6) DS Sec.2-03.7.1.B: If engineering information is provided on the final plat, the seal and signature of the responsible engineer is also required. a) DS Sec.2-03.6.4.E: Show required drainage setbacks from ponding limits in the basins to structures. b) DS Sec.2-03.6.4.F: Show the limits of the 100-year floodprone area for Earp Wash, if applicable, in a surveyable and readily retraceable manner with frequent ties to intersecting lot lines for all flows of 100 cfs or more. 7) DS Sec.2-03.6.4.G: Provide dimensions for SVT's on plan view for clarification of location of sight visibility triangles. 8) DS Sec.2-03.6.4.H: Show no-vehicular access easements where applicable, ie. on lots 36 - 40 on sheet 2 and lots 38 - 48 on sheet 3. 9) DS Sec.2-03.9.3.J: Since this project is not served by Tucson Water but by Ray Water Company, provide a copy of certification letter from the Arizona Department of Water Resources since the project is not served by the City of Tucson Water Department. Add a general note to the Final Plat regarding certification on assured water supply. Provide on the Final Plat appropriate signatures from Ray Water Co. indicating the same. 10) DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the financial assurances are approved. Provide the following portions of the assurance package: a) an original copy of the Agreement to Construct b) an original copy of the Amendment to Trust c) an copy of the original Trust Agreement d) all associated assurance exhibits e) a copy of the current Title Report f) copy of a sample warranty deed 11) For this and future projects, please provide three 8½" by 11" location map sheets for assurance submittals that go to Mayor & Council. Typically, these are similar to an enlarged location map on Final Plats. 12) DS Sec.2.4.K & IBC Chap. 36 Sec.13.1: Please provide status of differential grading. For resubmittal, address the above comments and provide the revised Final Plat, the original CC&R's, closure calculations, and assurance package, with response letter. If you have any further questions, or would like to set up a meeting, you may call me at 791-5550 extension 2204. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |
10/27/2004 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 RICK LYONS ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Ed Abrigo, Mapping Supervisor Pima County Assessor’s Office Mapping Department DATE: October 22, 2004 RE: Assessor’s Review and Comments Regarding Final Plat S04-024 Desert Point Estates T151410 (140-32) * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor’s Office requirements. _______ Plat does not meet Assessor’s Office requirements. COMMENTS: Thank you for your submittal. NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. Susan King |
10/28/2004 | CRAIG GROSS | ZONING-DECISION LETTER | REVIEW | Completed | |
10/28/2004 | CRAIG GROSS | COT NON-DSD | REAL ESTATE | Approved | no comments. |
10/28/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Peter McLaughlin Senior Planner FOR: Patricia Gehlen Principal Planner PROJECT: Desert Point Estates S04-024 Final Plat TRANSMITTAL: October 28, 2004 DUE DATE: October 28, 2004 1. Remove the "Preliminary" stamps from the plat. DS 2-03.11.8.B.1 2. Portions of page 19 of the draft Covenants Conditions & Restrictions did not copy correctly and the page is illegible. Please provide a clean copy of the CC&r's. DS 2-03.6.6 3. Because the project is served by Ray Water Company rather than City of Tucson Water Dept, provide a copy of certification letter from the Arizona Department of Water Resources . Add a general note to the Final Plat stating certification of assured water supply. Provide on the Final Plat appropriate signatures from Ray Water Co. indicating the same. DS 2-03.11.12.A If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. |
10/28/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Peter McLaughlin Senior Planner FOR: Patricia Gehlen Principal Planner PROJECT: Desert Point Estates S04-024 Final Plat TRANSMITTAL: October 28, 2004 DUE DATE: October 28, 2004 1. Remove the "Preliminary" stamps from the plat. DS 2-03.11.8.B.1 2. Portions of page 19 of the draft Covenants Conditions & Restrictions did not copy correctly and the page is illegible. Please provide a clean copy of the CC&r's. DS 2-03.6.6 3. Because the project is served by Ray Water Company rather than City of Tucson Water Dept, provide a copy of certification letter from the Arizona Department of Water Resources . Add a general note to the Final Plat stating certification of assured water supply. Provide on the Final Plat appropriate signatures from Ray Water Co. indicating the same. DS 2-03.11.12.A If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. |