Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - FINAL PLAT REVIEW
Plan Number - S04-016
Review Name: RESUBMITTAL - FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/03/2005 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S04-016 PASEO ESTRELLA/REVISED FINAL PLAT DATE: January 3, 2005 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. ***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through the Pima County Subdivision Coordinator. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County's Geographic Information System. Your support is greatly appreciated.*** jg |
01/06/2005 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approv-Cond | January 5, 2005 TO: Colleen Stoetzel Rick Engineering Company THRU: Craig Gross City of Tucson, Development Services Department FROM: Dickie Fernández, E.I.T. Pima County Development Services Department Development Review Division (Wastewater) SUBJECT: Paseo Estrella, Lots 1-104 and Common Areas A1-A2, B1-B4, C1-C4, D and E1-E3 Final Plat – 2nd Submittal S04-016 The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. A revised public Sewer Service Agreement for the proposed number of residential lots has been sent to your office. After three original Sewer Service Agreements have been signed by the Owner of Record, the three originals should be returned to Pima County Wastewater Management in order to satisfy the necessary requirements needed to approve the Mylars of the final plat. Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat. The required revision(s) may be shown on the Mylars. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Department of Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above mentioned comments, please contact me. Sincerely, Dickie Fernández, E.I.T. Telephone: (520) 740-6947 Copy: Project |
01/10/2005 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | Note: 1-25-04 I have discussed this final plat with Colleen Stoetzel of Rick Engineering and I am willing to review the revised final plat over the counter. Loren Makus DATE: January 10, 2005 TO: Craig Gross; CDRC Coordinator SUBJECT: Paseo Estrella Final Plat Engineering Review REVIEWER: Loren Makus ACTIVITY NUMBER: S04-016 SUMMARY: The Final Plat has been reviewed by Development Services Department Engineering Division. We do not recommend approval of the Final Plat at this time. 1. As previously commented: Council has directed us to require separate common area designations for retention/detention basins. The basin area, labeled as Common Areas "C-4" "Recreation Area" on the Final Plat, needs clarification. In the Title Block, the common area descriptions and the basin area need to be differentiated; label the basin area as "RETENTION / DETENTION BASIN". Mayor and Council have directed us to require the following note on tentative plats and plats which have existing easements containing underground utilities such as the natural gas pipeline through this proposed subdivision: "An existing, underground natural gas pipeline is located within a 30' wide utility easement through this subdivision." If you have any questions call me at 791-5550, extension 1161 or email me at loren.makus@tucsonaz.gov. Loren Makus, EIT Senior Engineering Associate Engineering Division Development Services |
01/13/2005 | DAN CASTRO | ZONING | REVIEW | Approved | TO: Plans Coordination Office Development Services Department PROJECT: Paseo Estrella S04-016 Final Plat FROM: Dan Castro Senior Planner FOR: Patricia Gehlen Zoning Manager Zoning Review Section TRANSMITTAL: January 12, 2005 DUE DATE: January 11, 2005 The Zoning Review Section approves the final plat for this subdivision. Should there be any changes requested by other CDRC members, however, the Zoning Review Section approval is void, and we request copies of those changes to insure that those changes do not affect zoning requirements. If you have any questions about this transmittal, please call Dan Castro, (520) 791-5608 ext. 1180. I:\finalplat2004\S04-016fpappr.doc |
01/13/2005 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: PASEO ESTRELLA S04-016 Tucson Electric Power Company (TEP) has reviewed the final plat dated December 22, 2004. TEP is unable to approve the plat at this time. In order for this Company to approve the final plat, the following will be required. * Add Public Utility Easement to the easements between Lots 95 & 96, the easement to lots 93 & 94, and the easement between 44 & 45. * A 10' x 10' easement is required for the transformers located and splitting Lots 75/76 & 79/80. Show all requested easements on the resubmittal of the final plat. Submit two bluelines to the City of Tucson for TEP's final approval. > Liza Castillo > Land Management > Tucson Electric Power Company > lcastillo@tep.com > Office: (520) 917-8745 > Cell Phone: (520) 904-2668 > Fax: (520) 917-8700 > > |
01/13/2005 | CRAIG GROSS | ZONING-DECISION LETTER | REVIEW | Completed | |
01/13/2005 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: PASEO ESTRELLA Lots 1-105 S04-016 The Final Plat received in this office on January 27, 2005 for the subject project will meet this Company's easement requirements. Please forward any resubmittals of the final plat to this office. Electric service will be provided to this subdivision in accordance with the rules and regulations approved by the Arizona Corporation Commission. Please contact me at (520) 917-8745 if you have any questions. Liza Castillo Land Management Tucson Electric Power Company lcastillo@tep.com Office: (520) 917-8745 Cell Phone: (520) 904-2668 Fax: (520) 917-8700 |
12/27/2004 | MARILYN KALTHOFF | START | PLANS SUBMITTED | Completed |