Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT REVIEW
Plan Number - S04-015
Review Name: FINAL PLAT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/05/2005 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 05/10/2005 | JORTIZ3 | ENGINEERING | REVIEW | Approved | SUBJECT: Engineering review of the Presidio Park Central Final Plat Final Plat S04-015 (First Review) T13S, R14E, Section 33 TO: Client Jeff Stine DATE: May 10, 2005 Title AMEC FROM: Jose E. Ortiz Address 3295 W. Ina Rd. Suite 200 Engineering Division Tucson, Arizona 85741 RESUBMITTAL REQUIRED: Final Plat and Assurances Package. SUMMARY: The Final Plat and Assurances Package have been reviewed and Engineering recommends that revisions be made to the Final Plat and Assurances per comments below prior to final approval. Please address the following review comments prior to the next submittal, and provide a detail response letter stating how each comment was address to assist in the follow up review process. FINAL PLAT COMMENTS 1. Reference the Trust No. in the Assurances package onto the Final Plat cover sheet. 2. Beneficiary information appears incorrect. Please verify the information and follow format per Development Standards No. 2-03.6.3.D. 3. Remove "CITY OF TUCSON ENGINEER" signature block from the RECORDING DATA section of the cover sheet. This signature block shall remain under the ASSURANCES section. 4. In the title block reword 'THRU' to 'THROUGH', and confirm the identification/name of the subdivision with the identification used in the Assurances Package. 5. Sheet 2: Drainage easement location needs to note the proposed retention basins. Modify note "PRIVATE DRAINAGE EASEMENT BY THIS PLAT" to read "PRIVATE DRAINAGE EASEMENT BY THIS PLAT (RETENTION BASIN)". 6. Tie down one corner of the subdivision survey boundary to a section corner per Development Standard 2-03.0.6.5.A. 7. Lots 3,4,9, and 10 are corner lots. For consistency with Lots 1 & 12 please indicate access points per Development Standards 2-03.6.4.G. 8. Modify the numbering of the second sheet. It should read "SHEET 2 0F 2" 9. Include a copy of the modified Assurances Package and CC&Rs with the revised Final Plat submittal. The specific maintenance notes specified in the Standards Manual for Drainage Design and Floodplain Management, SMDDFM, 14.3.2 must be included in the CC&Rs. The term "owner" in the maintenance notes is to be replaced with "Homeowners Association". 10. Per previous tentative plat comments a Grading Plan and Permit will be required. Proposed grading in excess of 5,000 yards is designated "engineered grading" and soils engineering report is required with the Grading Plan submittal. IBC Chapter 36, Section 9. The Soils Report must also address the requirements detailed in the Standards Manual for Drainage Design and Floodplain Management, SMDDFM, 14.2.6. ASSURANCES PACKAGE COMMENTS 11. Bind each document to insure documents stay divided from one another. 12. In the AGREEMENT TO CONSTRUCTION the project name and common area description of the subdivision does not match against the Title Block of the Final Plat. In addition, the exhibit "legal description" does not match the Title Block of the Final Plat. 13. In the AMENDMENT TO TRUST same comment as number 12. In addition, the trust number between the Final Plat and AMENDMENT TO TRUST shall match one another, and the activity number needs to be near the top of the front page of the AMENDMENT TO TRUST. CC&R COMMENTS 14. Need to specify who will be responsible for the maintenance of the retention basins located on lots 1 and 12 per the Standard Manual for Drainage Design and Floodplain Management Section 14.3 (Pages 14.03 and 14.04) 15. In the CC&R's section 1.13 COMMON AREAS needs clarification. It states that the retention basins are in the common area, but the Final Plat illustrates that the retention basins are in lots 1 and 12. Which party will be responsible for the private road? Assurances Package can be made available for pick up. If you have any questions or need additional information please feel free to contact me at 791-5550 x1191 or Jose.Ortiz@tucsonaz.gov Jose E. Ortiz Civil Engineer City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 791-5550 x1191 office (520) 879-8010 fax C:/0000 O. Street Address_Site |
| 05/13/2005 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S04-015 PRESIDIO PARK CENTRAL / FINAL PLAT DATE: MAY 5, 2005 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. Approved on the condition that changes are made on Final Mylar. 1: Change 4-21 to 41-21 on Location Map. ***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through the Pima County Subdivision Coordinator. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County’s Geographic Information System. Your support is greatly appreciated.*** |
| 05/20/2005 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: PRESIDIO PARK CENTRAL Lots 1-12 S04-015 The Final Plat for the subject project will meet this Company's easement requirements. Please forward any resubmittals of the final plat to this office. Electric service will be provided to this subdivision in accordance with the rules and regulations approved by the Arizona Corporation Commission. Please contact me at (520) 917-8745 if you have any questions. Liza Castillo Right of Way Agent Land Management Tucson Electric Power Co. (520) 917-8745 lcastillo@tep.com <mailto:lcastillo@tep.com> |
| 06/04/2005 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Ed Abrigo, Mapping Supervisor Pima County Assessor’s Office Mapping Department DATE: June 1, 2005 RE: Assessor’s Review and Comments Regarding Final Plat S04-015 Presidio Park Central T131433 (111-05) * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor’s Office requirements. _______ Plat does not meet Assessor’s Office requirements. COMMENTS: Thank you for your submittal. NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. Susan King |
| 06/06/2005 | DAN CASTRO | ZONING | REVIEW | Approved | |
| 06/09/2005 | FRODRIG2 | COT NON-DSD | REAL ESTATE | Approved | No objection |
| 06/20/2005 | CRAIG GROSS | ZONING-DECISION LETTER | REVIEW | Completed | `COMMUNITY DESIGN REVIEW COMMITTEE CITY OF TUCSON - DEVELOPMENT SERVICES June 20, 2005 Jeff Stine AMEC 3295 West Ina Road, Suite 200 Tucson, AZ 85741 Subject: S04-015 Presidio Park Central Final Plat Dear Jeff: The above referenced project has been APPROVED by the Community Design Review Committee. Please make the any necessary corrections and submit the following documents: (2) Title reports current within the last (30) days. (1) Executed Final Plat Double Matte Océ or Photo Mylar. (1) * Check made to "Reproductions, Inc." in the amount of $8.50 per plat page for Mayor & Council distribution. (1) * Check made to "Reproductions, Inc." in the amount of $55.00 per plat page for recorded plat distribution. (1) Check made to "Pima County Recorder" in the amount of $20.00 per plat page plus a $4.00 handling fee, along with CC&R fees if applicable. CCR fees are $9.00 for the first 5 pages and $1.00 for each additional page. (1) Executed and notarized CC&Rs (if applicable). *Please do not combine the checks for "Reproductions, Inc.". They are processed at different times and require separate checks. An account number is also acceptable. Assurances (if applicable) must be reviewed by the City Attorney's Office prior to being presented to the Mayor and Council. Plats, CCR's and assurances must be approved at the same Mayor and Council Meeting. Please expect 3 -4 weeks from the date submitted to the date scheduled for Mayor and Council approval. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 219-0499 |
| 06/20/2005 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approv-Cond | May 16, 2005 TO: Jeff Stine AMEC THRU: Patricia Gehlen City of Tucson, Development Services Department FROM: Dickie Fernández, E.I.T. Pima County Development Services Department Development Review Division (Wastewater) SUBJECT: Presidio Park Central, Lots 1-12 and Common Area A Final Plat – 1st Submittal S04-015 The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. A public Sewer Service Agreement for the proposed number of residential lots has been sent to your office. After three original Sewer Service Agreements have been signed by the Owner of Record, the three originals should be returned to Pima County Wastewater Management in order to satisfy the necessary requirements needed to approve the final plat. Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat. The required revision(s) may be shown on the Mylars. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Department of Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above mentioned comments, please contact me. Sincerely, Dickie Fernández, E.I.T. Telephone: (520) 740-6947 Copy: Project |