Plan Number: S03-038
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW

Plan Number - S03-038
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/10/2006 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
03/14/2006 FRODRIG2 PIMA COUNTY WASTEWATER Approved March 14, 2006

TO: John Wood, P.E.
Presidio Engineering

THRU: Patricia Gehlen
City of Tucson, Development Services Department

FROM: Dickie Fernández, E.I.T.
Pima County Development Services Department
Development Review Division (Wastewater)

SUBJECT: La Cholla Landing, Lots 1-61 and Common Areas A-C
Final Plat – 2nd Submittal
S03-038

The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


This project is hereby approved as submitted.


If you have any questions regarding the above mentioned comments, please contact me. Sincerely,





Dickie Fernández, E.I.T.
Telephone: (520) 740-6947

Copy: Project
03/14/2006 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S03-038 LA CHOLLA LANDING/REVISED FINAL PLAT
DATE: March 14, 2006



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.



***The Pima County Addressing Section can use digital CAD drawing files when
submitted with your final plat Mylar. These CAD files can be submitted through the Pima
County Subdivision Coordinator. The digital CAD drawing files expedite the addressing
and permitting processes when we are able to insert this digital data into the County’s
Geographic Information System. Your support is greatly appreciated.***









jg
03/23/2006 PETER MCLAUGHLIN ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: Peter McLaughlin
Senior Planner

FOR: David Rivera
Principal Planner

PROJECT:
La Cholla Landing
S03-038
Final Plat

TRANSMITTAL: March 23, 2006
DUE DATE: March 24, 2006

The Zoning Review Section at the Development Services Department approves the final plat for this subdivision, subject to the following changes on the executed final plat. However, should there be any changes requested by other CDRC members, the approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements:

1. Revise all dates in the Recording Data Block, Beneficiary Block, etc. to read "2006" rather that "2005".

If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608.
03/24/2006 FRODRIG2 COT NON-DSD REAL ESTATE Denied S03-038 La Cholla Landing: Resubmittal - CDRC - Final Plat Review. Owner to provide a legal opinion concerning W. Ft. Lowell alignment. Road Map 1/94 established a 60' wide R/W (30' each side of 27-34 Section Line) and this conflicts w/ Lot 1 & C.A. "C".
03/24/2006 ELIZABETH EBERBACH ENGINEERING REVIEW Denied DATE: March 27, 2006
SUBJECT: Engineering review of the La Cholla Landing Final Plat
TO: Patricia Gehlen, CDRC Manager
LOCATION: 3355 N Casa Grande Hwy, T13S R13E Sec27, Ward 1
REVIEWERS: Jason Green and Elizabeth Eberbach, P.E.
ACTIVITY: S03-038

SUMMARY: Engineering Division of Development Services Department has received and reviewed the Final Plat, Assurance Package, and CC&R’s and does not recommend approval of the Final Plat at this time. The following items need to be adressed:


FINAL PLAT COMMENTS:

1. In order to expedite the plat review and approval, provide the boundary survey and closure calculations report in accordance with D.S. 2-03.6.5.C.3.
2. Please provide a Vehicle No Access Easement at the back of Lot 1 and the beginning of Common Area “C” located north of Fort Lowell Road on Sheet 2 of 4.

ASSURANCE PACKAGE COMMENTS:

1. Regarding the Agreement to Construct, add to the assurable item list the fill required to bring the development out of the floodplain per the approved grading plan and the drainage report.
2. A copy of the Title Report needs to be submitted for review.
3. As required in the 1st submittal for this and all future projects, please provide a 8½" by 11" location map sheet for assurance submittals that go to Mayor & Council. Typically, these are similar to an enlarged location map on Final Plats.
4. The Covenants, Conditions, and Restrictions (CC&Rs), Final Plats, or Development Plans shall have a note stating (a) that the owner or owners shall be solely responsible for operation, maintenance, and liability for drainage structures and detention basins; (b) that the owner or owners shall have an Arizona Registered Professional Civil Engineer prepare a certified inspection report for the drainage and detention/retention facilities at least once each year, and that these regular inspection reports will be on file with the owner for review by City staff, upon written request; (c) that City staff may periodically inspect the drainage and detention/retention facilities to verify that scheduled and unscheduled maintenance activities are being performed adequately; and (d) that the owner or owners agree to reimburse the City for any and all costs associated with maintaining the drainage and detention/retention facilities, should the City find the owner or owners deficient in their obligation to adequately operate and maintain their facilities. SMDDFM 14.3.4.2. Please include the page number were this information is located and return the original, signed CC&R’s to this office.
5. The Assurance package will be available for pick up at the CDRC counter. Return all portions of the revised, recompiled assurance package with the resubmittal.


For any questions or to schedule a meeting, call me at 791-5550, extension 1189.


Jason Green, CFM
Senior Engineer Associate
Engineering Division
Development Services
03/24/2006 ELIZABETH EBERBACH ENGINEERING REVIEW Denied DATE: March 27, 2006
SUBJECT: Engineering review of the La Cholla Landing Final Plat
TO: Patricia Gehlen, CDRC Manager
LOCATION: 3355 N Casa Grande Hwy, T13S R13E Sec27, Ward 1
REVIEWERS: Jason Green and Elizabeth Eberbach, P.E.
ACTIVITY: S03-038

SUMMARY: Engineering Division of Development Services Department has received and reviewed the Final Plat, Assurance Package, and CC&R's and does not recommend approval of the Final Plat at this time. The following items need to be adressed:


FINAL PLAT COMMENTS:

1. In order to expedite the plat review and approval, provide the boundary survey and closure calculations report in accordance with D.S. 2-03.6.5.C.3.
2. Please provide a Vehicle No Access Easement at the back of Lot 1 and the beginning of Common Area "C" located north of Fort Lowell Road on Sheet 2 of 4.

ASSURANCE PACKAGE COMMENTS:

1. Regarding the Agreement to Construct, add to the assurable item list the fill required to bring the development out of the floodplain per the approved grading plan and the drainage report.
2. A copy of the Title Report needs to be submitted for review.
3. As required in the 1st submittal for this and all future projects, please provide a 8½" by 11" location map sheet for assurance submittals that go to Mayor & Council. Typically, these are similar to an enlarged location map on Final Plats.
4. The Covenants, Conditions, and Restrictions (CC&Rs), Final Plats, or Development Plans shall have a note stating (a) that the owner or owners shall be solely responsible for operation, maintenance, and liability for drainage structures and detention basins; (b) that the owner or owners shall have an Arizona Registered Professional Civil Engineer prepare a certified inspection report for the drainage and detention/retention facilities at least once each year, and that these regular inspection reports will be on file with the owner for review by City staff, upon written request; (c) that City staff may periodically inspect the drainage and detention/retention facilities to verify that scheduled and unscheduled maintenance activities are being performed adequately; and (d) that the owner or owners agree to reimburse the City for any and all costs associated with maintaining the drainage and detention/retention facilities, should the City find the owner or owners deficient in their obligation to adequately operate and maintain their facilities. SMDDFM 14.3.4.2. Please include the page number were this information is located and return the original, signed CC&R's to this office.
5. The Assurance package will be available for pick up at the CDRC counter. Return all portions of the revised, recompiled assurance package with the resubmittal.


For any questions or to schedule a meeting, call me at 791-5550, extension 1189.


Jason Green, CFM
Senior Engineer Associate
Engineering Division
Development Services
04/17/2006 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Denied TEP is unable to approve the final plat at this time. See the comments
sent to John Wood on 03/20. The west 10' of Lot 29 is required as an
easement for the cable to be installed there.

-----Original Message-----
From: Castillo, Liza
Sent: Monday, March 20, 2006 9:58 AM
To: 'John Wood'
Subject: LA CHOLLA LANDING - S03-038
Importance: High


John -

I have reviewed the final plat for La Cholla Landing submitted to the
City of Tucson March 10, 2006. There is an additional easement required
by TEP for the line at Lot 29 as shown on the preliminary design dated
December 02, 2005. The west 10' of lot 29 should be granted as an
easement to TEP or as a PUE. I apologize for not including this
easement requirement in m previous review. If you send me a copy of the
plat showing this easement, I will then send an approval of the plat to
the City. Any questions about this, let me know. Thank you.

Liza Castillo
Right of Way Agent
Land Management
Tucson Electric Power Co.
(520) 917-8745
lcastillo@tep.com
04/18/2006 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

April 18, 2006

John Wood
Presidio Engineering
2302 East Speedway Blvd., #214
Tucson, AZ 85709

Subject: S03-038 La Cholla Landing Final Plat

Dear John:

Your submittal of March 10, 2006, for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have received and addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED
4 Copies Revised Final Plat (Real Estate, TEP, Engineering, DSD)






Should you have any questions, please call me at 791-5608.

Sincerely,


Patricia Y. Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 795-6747