Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S03-029
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - FINAL PLAT REVIEW

Plan Number - S03-029
Review Name: RESUBMITTAL - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/30/2004 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
08/03/2004 LOREN MAKUS ENGINEERING REVIEW Denied DATE: Aug 3, 2004
TO: Craig Gross; CDRC Coordinator
SUBJECT: Vista Montana Estates Final Plat Engineering Review
REVIEWER: Loren Makus
ACTIVITY NUMBER: S03-029

SUMMARY: The Final Plat has been reviewed by Development Services Department Engineering Division. We do not recommend approval of the Final Plat at this time. The following comments must be addressed before the Final Plat can be approved.

Resubmittal Required: Final Plat, Complete Assurances Package, CC&Rs, Closure Calculations

Final Plat Comments:
1. DS Sec.2-03.6.4.I: Show retention/detention areas in a surveyable and readily retraceable manner. The 100-year ponding limits of the basins shall be labeled with surveyable data. Council has directed us to require separate common area designations for retention/detention basins. The basin areas, labeled as Common Areas "C" "DRAINAGE" on the Final Plat, need clarification. In the Title Block, the common area descriptions and the basin area need to be differentiated; label the basin areas exclusively as "RETENTION / DETENTION BASIN" and label the other areas (such as channels) as "DRAINAGE". Revise the Plat, title blocks and assurances to separately indicate the basins.
2. DS Sec.2-03.6.5 Provide closure calculations for the subdivision. The response letter indicates that the closure calculations will be provided under separate cover. In order to expedite the plat review, submit the calculations with the resubmittal.
3. DS 2-03.6.4.F Show the limits of the floodprone areas in a surveyable and readily retraceable manner.
4. DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the financial assurances are approved. Address the following for other portions of the assurance package:
a. Provide a copy of the Trust Agreement.
b. Provide original AMENDMENT TO TRUST / THIRD PARTY TRUST.
c. Provide original AGREEMENT TO CONSTRUCT SUBDIVISION IMPROVEMENTS / THIRD PARTY TRUST.
d. Provide copy of Warranty Deed.
e. DS Sec.2-03.8.1.D: Provide a copy of an updated Title Report (current within thirty days).
f. For this and future projects, please provide two 8½" by 11" location map sheets for assurance submittals that go to Mayor & Council.
g. If the descriptions of the common areas are changed on the Final Plat title block (due to above comments), the CC&R's descriptions of the subdivision common areas need to match the Final Plat title block descriptions.

If you have any questions or to set up a meeting, call me at 791-5550, extension 1161 or email me at loren.makus@tucsonaz.gov

Loren Makus, EIT
Senior Engineering Associate
Engineering Division
Development Services
08/06/2004 FRODRIG2 PIMA COUNTY WASTEWATER Approved August 06, 2004

TO: John Evans, P.E., JAE Consulting Engineers

THRU:


FROM: ____________________________________
representing the Pima County
Departments of Wastewater Management and Environmental Quality

SUBJECT: Vista Montaña Estates, Lots 1-215
- Submittal
S03-029


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


The three signed and notarized Sewer Service Agreements for this project have been received by this office, and the other comments in our last review letter have been satisfactorily addressed.

The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.


If you wish to discuss the above comments, please contact me at the phone number provided above, under my signature.
08/17/2004 DAVID RIVERA ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Plans Coordination Office
Development Services Department

PROJECT: S03-029
Vista Montaña, Phase One, Lots 1-215 and Common Areas "A", "C", "D", and "E"
Final Plat

FROM: David Rivera
Senior Planner

FOR: Patricia Gehlen
Principal Planner
Zoning Review Section

TRANSMITTAL: August 17, 2004

DUE DATE: August 12, 2004

The Zoning Review Section approves the final plat for this subdivision. Should there be any changes requested by other CDRC members, however, the Zoning Review Section approval is void, and we request copies of those changes to insure that those changes do not affect zoning requirements.

If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.

C:\planning\cdrc\finalplat\S03029fpa.doc
08/20/2004 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power Company (TEP) has reviewed the final plat dated July
30, 2004. TEP is conditionally approving the plat at this time.

Please add the following to the dedication:

"We hereby grant to the public and all
utility companies all easements as shown hereon for the purpose of access,
installation and maintenance of public sewers and utilities and other uses
as designated by this plat."



Liza Castillo
Land Management
Tucson Electric Power Company
lcastillo@tep.com
Office: (520) 917-8745
Cell Phone: (520) 904-2668
Fax: (520) 917-8700
08/20/2004 CRAIG GROSS ZONING-DECISION LETTER REVIEW Completed
08/20/2004 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Vista Montana Estates, Phase One
S03-029

After completion of the electrical design and review of the Final Plat, we noticed that there are sidewalks within the 10' PUE's. We cannot approve the Final Plat showing the sidewalks within the PUE, they must be located outside of the 10' PUE's.

Also required is the additional dedication, I previously advised you of in an e-mail sent last Friday.

Any questions let me know.

Liza Castillo
Land Management
Tucson Electric Power Company
lcastillo@tep.com
Office: (520) 917-8745
Cell Phone: (520) 904-2668
Fax: (520) 917-8700
08/20/2004 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: VISTA MONTANA ESTATES, PHASE ONE
Lots 1-215
S03-029

The Final Plat received in our office today for the subject project will meet this Company's easement requirements.
Please forward any resubmittals of the final plat to this office.

Electric service will be provided to this subdivision in accordance with the rules and regulations approved by the Arizona Corporation Commission.

Please contact me at (520) 917-8745 if you have any questions.




Liza Castillo
Land Management
Tucson Electric Power Company
lcastillo@tep.com
Office: (520) 917-8745
Cell Phone: (520) 904-2668
Fax: (520) 917-8700