Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - FINAL PLAT REVIEW
Plan Number - S03-017
Review Name: RESUBMITTAL - FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/05/2004 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approv-Cond | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S03-017 EARLYBIRD SUBDIVISION/REVISED FINAL PLAT DATE: January 2, 2004 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project ON THE CONDITION THAT COMMENTS ARE CHANGED ON FINAL MYLAR. CHANGE “BK 3 PG 82” TO BK 3 PG 83 ON LOCATION MAP. SPELL OUT ALL STREET SUFFIXES. ***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through the Pima County Subdivision Coordinator. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County’s Geographic Information System. Your support is greatly appreciated.*** jg |
01/06/2004 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Denied | From: "Castillo, Liza" <LCastillo@tep.com> To: Craig Gross <cgross1@ci.tucson.az.us>, Fern Rodriguez <frodrig2@ci.tucson.az.us> Date: 01/06/2004 1:12:39 PM Subject: EARLYBIRD SUBDIVISION, S03-017 SUBJECT: EARLYBIRD SUBDIVISION Lots 1-6 S03-017 Tucson Electric Power Company (TEP) has reviewed the final plat dated December 24, 2003. TEP is unable to approve the plat at this time. In order for this Company to approve the final plat, the following will be required. * In addition to the 6' Public Utility Easement, a 2' x 5' TEP easement is required at the transformer location between Lots 2 and 4. * Remove the word FOR from the 2nd paragraph of the dedication. It should read as follows: "WE HEREBY GRANT TO THE PUBLIC AND ALL UTILITY COMPANIES ALL EASEMENTS AS SHOWN HEREON FOR THE PURPOSES OF ACCESS, INSTALLATION AND MAINTENANCE OF UTILITIES AND OTHER USES AS DESIGNATED BY THIS PLAT." Show all requested requirements on the resubmittal of the final plat. Submit two bluelines to the City of Tucson for TEP's final approval. Liza Castillo Land Management Tucson Electric Power Company lcastillo@tep.com Office: (520) 917-8479 Pager: (520) 218-6565 Fax: (520) 917-8400 |
01/08/2004 | JIM TATE | ENGINEERING | REVIEW | Denied | TO: Craig Gross; CDRC Coordinator DATE: January 8, 2004 SUBJECT: Engineering review of the Early Bird Subdivision Final Plat. The activity number is S03-017. SUMMARY: The Final Plat was received by Engineering on January 2, 2004. Engineering has reviewed the received item and does not recommend approval of the Final Plat. RESUBMITTAL REQUIRED: FP SUBMITTAL REQUIRED: ASSURANCES The next submittal must address the following items: FINAL PLAT 1. The line from the new survey monument in the hammerhead to the northwest corner of lot 6 must have a bearing and distance. 2. The ACKNOWLEDGMENT and RECORDING DATA paragraphs have the date as 2003. Change these to 2004. 3. In the ASSURANCES paragraph remove the Title Company information. Only the Engineering Administrator and Director sign in the Assurances paragraph. The Title Company signs in the Dedication paragraph. 4. The Final Plat will not be approved until the original assurance package is submitted and approved. ASSURANCES 1. Please include the Assurance Package with the next Final Plat submittal. This package must include the original Third Party Trust, the original Amendment to Trust, a copy of the Trust Agreement, a copy of the Deed, and a Title Report. James C. Tate, P.E., CFM Civil Engineer |
01/13/2004 | DAN CASTRO | ZONING | REVIEW | Approved | CDRC TRANSMITTAL TO: Development Services Department FROM: Patricia Gehlen Plans Coordination Office Principal Planner PROJECT: Earlybird Subdivision Lots 1-6 S03-17 Final Plat TRANSMITTAL: January 16, 2004 DUE DATE: January 14, 2004 COMMENTS CODE SECTION/ DEVELOPMENT STANDARD 1.The Zoning Review Section approves the final plat for this subdivision. Should there be any changes requested by other CDRC members, however, the Zoning Review Section approval is void, and we request copies of those changes to insure that those changes do not affect zoning requirements. If you have any questions about this transmittal, please call Patricia Gehlen, (520) 791-5608. I:patricia\cdrc\dancecivano |
12/31/2003 | MARILYN KALTHOFF | START | PLANS SUBMITTED | Completed |