Plan Number: S02-043
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - FINAL PLAT REVIEW

Plan Number - S02-043
Review Name: RESUBMITTAL - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/20/2003 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
06/27/2003 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Approved 3950 E. Irvington Road, Tucson, AZ 85714
Post Office Box 711, Tucson, AZ 85702




Telephone: 520-884-3879
Fax: 520-770-2002
WR#96012 June 24, 2003





Mr. Michael Shipione
Full Circle Engineering
1222 N. Euclid Avenue
Tucson, Arizona 85719

Dear Mr. Shipione:

SUBJECT: Mesquite Cove
Lots 1-71 and Commercial Lots 72 & 73
S02-043

Tucson Electric Power Company (TEP) has reviewed the most-recently received Final Plat which was not dated nor was it stamped by a professional engineer's seal. TEP is unable to approve the Plat at this time.

In order for this Company to approve the Final Plat, the following will be required:

The existing TEP Easement must be depicted on the Plat, OR shown as an existing easement to TEP recorded in Docket 11978, Page 883 in the General Notes and as proposed to be abandoned by the customer at a future date.

The four (4) following easements must be shown on a revised Final Plat and properly dedicated on the front page of said Plat: 1) The correct labeling of the additional 10'x15' Public Pedestrian and Utility Easement (PPUE) coincident with the proposed 10' PPUE (Typical) strip within proposed Lot 38; 2) A 10'x10' TEP exclusive easement on the west side of Commercial Lot 72, coincident with Mesquite Ranch Road; 3) A 10'x10' exclusive TEP easement within Common Area B, east of proposed Lot 1, and coincident with the west right of way line of Houghton Road dedicated by Docket 11806, Page 1658; 4) A 10'x20' exclusive TEP Easement, located within the proposed Commercial Lot 73, west of and coincident with the proposed 10' PPUE, parallel to and coincident with the west right of way line of that certain 25' addition to Houghton Road, dedicated by Condition C9-97-08 Condition 4, as shown on the most-recently received Final Plat. of subject subdivision. For clarification, the above-referenced four (4) easements are in addition to the 10' PPUE already depicted on the Final Plat.


Page 2




Please show all of the additional easements on a resubmittal of the Final Plat and distribute it to the City of Tucson for TEP's final approval. Please contact me at (520) 884-3879 if you have any questions.



For your information, the resubmittal of the Final Plat must have a date on the front page, as well as the display of a professional seal.

Sincerely,



S. Glynda Mastrangelo
Right-of-Way Agent
Land Management


SGM
Enclosure

cc: Craig Gross, City of Tucson
R. Ketchum, Houghton-Irvington LTD Partnership
06/27/2003 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S02-043 MESQUITE COVE / FINAL PLAT
June 24, 2003



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.

NOTE:

Ghost out lots on pg. 2 that are shown on pg. 3.


***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through the Pima County Subdivision Coordinator. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County’s Geographic Information System. Your support is greatly appreciated.***
06/27/2003 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Approved Revised Comments dated July 14, 2003

Mr. Craig Gross
City of Tucson
Subdivision Coordination Office
201 N. Stone Avenue, 1st Floor
Tucson, Arizona 85701

Dear Mr. Gross:

SUBJECT: Mesquite Cove
Lots 1-73
S02-043

The Final Plat for the subject project will meet this Company's easement requirements.
Please forward any resubmittals of the Final Plat to this office.

Electric service will be provided to this subdivision in accordance with the rules and regulations approved by the Arizona Corporation Commission.

Please contact me at (520) 884-3879 if you have any questions.


Sincerely,



S. Glynda Mastrangelo
Right-of-Way Agent
Land Management

sgm
cc: M. Shipione
R. Ketchum, Houghton-Irvington LTD Partnership
07/01/2003 DAVID RIVERA ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Plans Coordination Office
Development Services Department

PROJECT: S02-043
Mesquite Cove, Lots 1-73 and Common Areas "A","B", and "C"
Final Plat

FROM: David Rivera
Senior Planner

FOR: Patricia Gehlen
Principal Planner
Zoning Review Section

TRANSMITTAL: July 8, 2003

DUE DATE: July 3, 2003

COMMENTS:

The Zoning Review Section approves the final plat for this subdivision, subject to the following changes on the executed final plat. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements.

1. An applicant has one (1) year from the date of approval of tentative plat to obtain approval of a final plat that complies with zoning and other development requirements in effect at the time of application. As of this final plat review date the tentative plat has not been approved and a final plat approval date is based on the approval date of the tentative plat. This final plat must be approved and recorded on or before one year of the approval date of the tentative plat. The final plat approval date will be provided as soon as the CDRC manager has provided a tentative plat approval memo.

2. The Final Plat is conditionally approved pending final review and approval of the tentative plat. If changes are required on the tentative plat that must be made to the final plat for consistency a re-submittal of the final plat will be required.

If you have any questions about this transmittal, please call David Rivera at (520) 791-5608.

C\planning\cdrc\finaplat\S02043fpca.doc
07/03/2003 LAITH ALSHAMI ENGINEERING REVIEW Approv-Cond SUBJECT: Mesquite Cove
S02-043, T14S, R15E, SECTION 35

RECEIVED: Final Plat on June 20, 2003

The subject Final Plat has been reviewed. The Final Plat is recommended for a conditional approval pertaining to Engineering and Floodplain subject to satisfying the following comment:

· Article X (Maintenance) of the CC & R's refers to "detention & retention", which are not proposed for this project. Remove the reference to the detention/retention and include instead the proposed channels, flumes and other drainage structures.

Please be advised that the Final Plat Mylar and the assurances will not be processed until the CC & R's are revised. Although a re-submittal is not required for the Final Plat, the CC & R's can either be brought back separately for review at the counter or they can be submitted with the Final Plat Mylar.

If you have any questions, I can be reached at 791-5550 or lalsham1@ci.tucson.az.us