Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S02-041
Parcel: Unknown

Review Status: Completed

Review Details: CDRC - FINAL PLAT REVIEW

Plan Number - S02-041
Review Name: CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/27/2002 FERNE RODRIGUEZ START INITIALIZE THE WORKFLOW Completed
10/01/2002 KAY MARKS PIMA COUNTY ADDRESSING Approved PIMA COUNTY
DEVELOPMENT SERVICES DEPARTMENT
201 N. Stone Ave, 1st Floor
Tucson, Arizona 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370



TO : CITY PLANNING
FROM : KAY MARKS, ADDRESSING OFFICIAL
SUBJECT : S02-041 RILLITO CROSSING/FINAL PLAT
DATE : October 1, 2002


***********************************************************************************************************

The above referenced project has been reviewed by this Division for all matters pertaining to street naming/ addressing, and we hereby approve this project.


NOTE: Approved on the condition that "east" is deleted from "East Kleindale Road" on pg. 2.



***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through the Pima County Subdivision Coordinator. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County’s Geographic Information System. Your Support is greatly appreciated.***
10/04/2002 JOE LINVILLE DEVELOPMENT SERVICES LANDSCAPE Approved Exception for the roadway approved.
10/16/2002 ED ABRIGO PIMA COUNTY ASSESSOR Approved COMMENTS ON FILE
10/16/2002 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Approved 3950 E. Irvington Road, Tucson, AZ 85714
Post Office Box 711, Tucson, AZ 85702


Telephone: 520-884-3879
Fax: 520-770-2002
WR#94843 October 16, 2002


Ms. Colleen Stoetzel
Rick Engineering Company
1745 E. River Road, Suite 101
Tucson, Arizona 85718

Dear Ms. Stoetzel:

SUBJECT: Rillito Crossing
S02-041

Tucson Electric Power Company has reviewed and approved the development plan received into this Office on September 30, 2002. It appears that there are no existing facilities or conflicts within the boundaries of this proposed development.

Please submit a final set of plans including electrical load plans, to determine how TEP will serve this commercial development. If easements are required, they will be secured by separate instrument. Your final plans should be sent to:

Marcus Hayes
Distribution Services – WI-101
Tucson Electric Power Company
P. O. Box 711
Tucson, AZ 85702

Please call me at (520) 884-3879, should you have any questions.

Sincerely,



S. Glynda Rothwell
Right-of-Way Agent
Land Management

sgr
cc: C. Gross, City of Tucson
10/18/2002 FRODRIG2 DEVELOPMENT SERVICES ENGINEERING Denied DATE: October 18, 2002


TO: Craig Cross FROM: Laith Alshami, P.E.
CDRC Engineering

SUBJECT: Rillito Crossing
S02-041, T13S, R14E, SECTION 27

RECEIVED: Final Plat and Master Drainage Report on September 27, 2002

The subject submittal has been reviewed. We offer the following comments:

Drainage Report:

It appears that the proposed designs and analyses were made under the assumption that the subject parcel is no longer in FEMA floodplain. Since the LOMR, which is being processed to modify the Rillito floodplain, has not been approved by FEMA, the analyses in the report are not valid.
It is not clear how the future onsite watersheds were determined without proposing actual improvements. The master report should provide guidelines for future developments rather than determining anticipated improvement design details.
It seems that the submittal of this report is premature at this time. The purpose of the submitted final plat appears to be for providing certain dedications in order to sell off portion of the subject parcel. This plat is not intended to fulfil the requirements of the rezoning conditions.

Final Plat:

Provide the S(YR)-______ subdivision case number as required by D.S. 2-03.6.1.K.
Revise the “Certification of Survey” to match the wording in D.S. 2-03.6.3.A.
Add the “Beneficiary” statement (D.S. 2-03.6.3.C.)
Add the word “DATA” after the word “RECORDING” on the first sheet (D.S. 2-03.6.3.D.)
Show the limits of the100-year floodprone areas in a surveyable and readily retraceable manner with frequent ties to intersecting lot lines for all flows of 100 cfs or more (D.S. 2-03.6.4.F).
Any proposed public access easement or public right of way dedication or proposed easement abandonment by a separate instrument must be processed before the final plat can be approved. Additionally, the recordation information must be submitted with the final plat.
Verify that 7’ public ROW dedication is adequate to meet rezoning condition “4.d”.
Demonstrate compliance with rezoning condition “4”.
Show all applicable erosion setback lines (D.S. 2-03.6.4.E.)
Show no-vehicular access easement where applicable (existing and/or proposed) in accordance with D.S. 2-03.6.4.H.


RESUBMITTAL REQUIRED: Revised Final Plat
Assurances

LFA:lfa

S:\Engineering\S02-041 Rillito Crossing FP comments.doc
10/22/2002 PETER MCLAUGHLIN DEVELOPMENT SERVICES ZONING Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Peter McLaughlin
Senior Planner

FOR: Patricia Gehlen
Principal Planner

PROJECT:
Rillito Crossing
S02-041
Final Plat

TRANSMITTAL: October 22, 2002

DUE DATE: October 24, 2002

The Zoning Review Section at the Development Services Department approves the final plat for this subdivision, subject to the following changes on the executed final plat. However, should there be any changes requested by other CDRC members, the approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements.


1. In the Assurances paragraph, please replace signature line "City of Tucson Planning Director" with "City of Tucson Development Services Director".
DS 2-03.6.3.E

2. Please place the S02-041 case number near the title block in the lower right corner of all sheets of the plat.
DS 2-03.6.1.K

3. Revise the last word in the Assurances sentence to read "proper" rather than "property".
DS 2-03.6.3.E


Should the CDRC recommend approval of the final plat, please have the applicant submit the executed final plat for signature, and a memo stating that the members of the CDRC have approved the final plat. When these items are received, along with forty-four half-sized prints of the final plat, the final plat will be scheduled for consideration at the next available Mayor and Council meeting.

If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608.

PMC H:\Peter\finalplats\S02-041
10/23/2002 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Approved COMPREHENSIVE PLANNING TASK FORCE COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

S02-041 Rillito Crossing 10/18/02

(X) Final Block Plat
() Development Plan
() Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other

CROSS REFERENCE: C9-01-30 Summit Development

NEIGHBORHOOD PLAN: Northside Area Plan

GATEWAY/SCENIC ROUTE: No

COMMENTS DUE BY: 10/24/02

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No Annexation or Rezoning Conditions, Not an RCP - No Comment
() Proposed Block Plat Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies With Plan Policies
() See Additional Comments Attached
() No Additional Comments - Complies With Planning Comments Submitted on:

(X) Resubmittal Required:
(X) Final Block Plat
() Development Plan
() Landscape Plan
() Other

REVIEWER: msp DATE: 10/18/02
Comprehensive Planning Task Force Comments:


1. Please revise Rillito Creek Final Block Plat, Blocks 1 & 2, to include rezoning case C9-01-30, as a general note on page 1 of 2. Rezoning conditions to in the same format and language as approved by Mayor and Council on February 12, 2002, (see attached copy).
10/23/2002 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Approved COMPREHENSIVE PLANNING TASK FORCE COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

S02-041 Rillito Crossing 12/24/02

(X) Final Block Plat
() Development Plan
() Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other

CROSS REFERENCE: C9-01-30 Summit Development

NEIGHBORHOOD PLAN: Northside Area Plan

GATEWAY/SCENIC ROUTE: No

COMMENTS DUE BY: 12/26/02

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No Annexation or Rezoning Conditions, Not an RCP - No Comment
() Proposed Block Plat Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies With Plan Policies
(X) See Additional Comments Attached (*)
(X) No Additional Comments - Complies With Planning Comments







REVIEWER: msp DATE: 12/24/02
Comprehensive Planning Task Force Comments:

(*) Please be advised that since the block plat is not going to effectuate the zoning and it is only meant to dedicates the right-of-way prior to conveyance to the Tucson Unified School District, then CPTFC agrees to release with the understanding that prior to any subdivision(s) or development plan(s) are approved for this block plat site, that rezoning case C9-01-30 will be recorded as general notes, in complete format and language as approved by Mayor and Council.
11/13/2002 FRODRIG2 COT NON-DSD REAL ESTATE Denied Defer to Engineering for the following:

It appears that Rillito Crossing Drive dead ends. Should there be a turn around provided or connection to a through Street before approval of final plat.

Completion of purchase from Pima County for the dedication of the future Alvernon Way extension project and the dedication of right of way over the Alvernon Wash. Show docket and page of said insturments on final plat.

Compliance of all Rezoning Conditions.
12/03/2002 FRODRIG2 PIMA COUNTY WASTEWATER Denied PIMA COUNTY
DEVELOPMENT SERVICES DEPARTMENT
DEVELOPMENT REVIEW DIVISION
201 N. Stone Avenue, 2nd Floor
Tucson, Arizona 85701-1207

CARMINE DEBONIS, JR. Phone: (520) 740-6586
Director FAX: (520) 740-6380
November 29, 2002

TO: Colleen Stoetzel, Rick Engineering

THRU: Craig Gross, City of Tucson Development Services

FROM: Tim Rowe, P.E., Development Review Engineer (Wastewater)
Pima County Development Review Division

SUBJECT: Rillito Crossing, Blocks 1 & 2
Final Block Plat - 1st Submittal
S02-041



We have reviewed the above-referenced project on behalf of the Pima County Wastewater Management Department. The following comments are offered for your use:

1. PCWWM has no objections to the release of the two public sewer easements recorded in
a) DKT 4945, PG.606 and DKT 4685, PG 585
b) and DKT 2731, PG.102
Please begin the release process as soon as possible.

Neither Glen Hitz nor I know if the abandoned sewers in these easements were removed or left in place.

2. PCWWM’s Base Map 24 shows a 54" sewer line (G-78-019) running across the southern portion of Block 2. It should be in an existing public sewer easement. If no public sewer easement for this sewer line currently exists, one will need to be granted by final plat.

Due to its size, any public sewer easement created for this sewer line must be a minimum of 30' wide, or twice the depth of the sewer line plus 10' if the sewer line is buried more than 10' deep.

3. Please do not create any new public sewer easements (other than any necessary easement for G-78-019) by this block plat for the following reasons:
Title 13.20.030.A states, in part:

"Public gravity sanitary sewage conveyance facilities . . . shall be located positioned beneath the paved portions of public roads, streets, avenues, alleys and public rights-of-way, or within dedicated public sewer easements under paved private streets, to the maximum degree viable . . . The location of public sanitary sewerage facilities in easements or in areas with restricted vehicle access may be allowed on a case-by-case basis only if no alternative alignment is deemed viable by the department. In such instances, surface improvements sufficient to accommodate year round vehicular maintenance access and turning radii shall be required."

No tentative plat, or utility plan, showing the proposed streets or the topography of the property has been submitted for this block plat. Therefore, we cannot determine if these easements are necessary (if no alternative alignment of the sewer lines is viable), or if these easements are adequate in size.

We will seek any necessary public sewer easements on the re-subdivision plats.

4. We will require a revised set of bluelines and a response letter to these comments. Additional comments may be forthcoming.

If you wish to discuss the above comments, please contact me at 740-6563.




Tim Rowe, P.E., Development Review Engineer (Wastewater)
Pima County Development Review Division


TR/tr
Copy: Project