Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S02-017
Parcel: Unknown

Review Status: Completed

Review Details: TENTATIVE PLAT REVIEW

Plan Number - S02-017
Review Name: TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/14/2004 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
01/15/2004 JIM EGAN COT NON-DSD FIRE Approved The Development Plan is approved 01/15/04.
01/30/2004 FRODRIG2 PIMA COUNTY WASTEWATER Approv-Cond PIMA COUNTY
DEVELOPMENT SERVICES DEPARTMENT
DEVELOPMENT REVIEW DIVISION
201 N. Stone Avenue, 2nd Floor
Tucson, Arizona 85701-1207

CARMINE DEBONIS, JR. Phone: (520) 740-6586
Director FAX: (520) 740-6380
February 20, 2004

TO: Heath Elder, Landmark Engineering, Inc.

THRU: Craig Gross, City of Tucson Development Services

FROM: Tim Rowe, P.E., Development Review Engineer (representing
Pima County Wastewater Management and Environmental Quality)
Pima County Development Review Division

SUBJECT: Tierra Vista, Lots 1-383 and Common Areas A and B
Tentative Plat -1st Submittal
S02-017 (a.k.a. S02-017A)



The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management (PCWWM) Department. This review letter may contain comments pertaining to the concerns of either Department. Separate review letters from PDEQ and PCWWM representatives will not be prepared for this project. The following comments are offered for your use:

1. For Your Information: Our record keeping system will not allow us to process this subdivision plat under the case number, S02-017, since we already have a previously approved tentative and final plat under that case number. In our record keeping system, we have used subdivision plat number S02-017A for this project.

2. This project will be tributary to the Southeast Interceptor and the Roger Road Wastewater Treatment Facility. Provide a letter from PCWWM Planning Services, written within the past 90 days, stating that treatment and conveyance system capacity for this project is available. Mr. Robert Decker of PCWWM Planning Services may be contacted regarding this matter at 520-740-6625.

3. Based on our historical records for this property, this project would qualify for Participating sewer connection fee rates. However, a final determination of this status cannot be made until approval of the sewer construction plans and/or preparation of the sewer service agreement.

4. Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal. The required revision(s) may be shown on the Mylars.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.

If you wish to discuss the above comments, please contact me at 740-6563.




Tim Rowe, P.E., Development Review Engineer (Wastewater)
Pima County Development Review Division

TR/tr
Copy: Project
01/30/2004 KAY MARKS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S02-017 TIERRA VISTA/ TENTATIVE PLAT
DATE: January 30, 2004



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:

Include Resubdivision information for Book 56, Page 38 on all Title Blocks.

Spell out all street suffixes.

Change “Desert Walk Street” to Drive, Lane, Road, Trail or Way.

Change “Surise Valley Drive” to Sunrise Valley Drive on pg. 7.

Change “Brittania Drive” to Britannia Drive on pg. 9.













jg
02/03/2004 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Denied SUBJECT: TIERRA VISTA
Lots 1-383
S02-017

Tucson Electric Power Company (TEP) has reviewed the tentative plat dated
December 26, 2003. This Company is unable to approve the plat at this time.
There are existing electrical facilities within the boundaries of the
development. The facilities along with the easement recording information
must be shown on the plat prior to approval.

Enclosed is a copy of a TEP facility map showing the approximate location of
the existing facilities. There is an existing pole southwest of the project
that has a service to a sign. All costs associated with the relocation of
the facilities in conflict will be billable to the developer. Please
contact Ms. Simona Nunez, Design Build Department at 918-8226, regarding the
apparent conflict.

TEP will provide an electrical design on the Approved Tentative Plat within
twenty-two (22) working days after receipt of the plat. Additional plans
necessary for design completion are: building plans including water,
electrical load and landscape. at the customer's request, a design can be
provided prior to the Approved Tentative Plat, however, once a design is
provided, any design changes will be billable to the developer.


Liza Castillo
Land Management
Tucson Electric Power Company
lcastillo@tep.com
Office: (520) 917-8479
Pager: (520) 218-6565
Fax: (520) 917-8400
02/09/2004 DAN CASTRO ZONING REVIEW Approv-Cond The Zoning Review Section approves the tentative plat for this subdivision, subject to the following changes on the executed tentative plat. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised tentative plat to verify that those changes do not affect any zoning requirements.

1. Remove the blank "S03 __" case number in the lower right corner of each sheet of all plans. The subdivision case number originally given to this project has not changed.

If you have any questions about this transmittal, please call Dan Castro at (520) 791-5608.
02/11/2004 DALE KELCH COT NON-DSD TRAFFIC Denied Traffic Engineering REJECTS this T.P.:

1. Add a general note to read "All non-signalized intersection street names must have E-W block number addresses for E-W roadways and N-S block number addresses for N-S roadways."

The consultant may fax me that portion of the sheet that has the correction on it for my review. This department will not require a full set for additional review unless there is substantial design modification.


D. Dale Kelch, EIT
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)
dkelch1@ci.tucson.az.us
02/11/2004 ELIZABETH EBERBACH ENGINEERING REVIEW Approv-Cond SUBJECT: Engineering review of the Tierra Vista Phase 2 Tentative Plat
ACTIVITY #: S02-017

SUMMARY: The Tentative Plat with the proposed revised phasing, Landscape Development Plan, Drainage Report with addendum cover letter, Schedule A, and letter explaining phasing were received by Engineering on January 15, 2004. A soils report, which was not included in this submittal, will be required at grading review stage. Development Services Department Engineering Division has done a review of the received items and recommends conditional approval for the Tentative Plat. The Drainage Report was reviewed for Tentative Plat purposes only.

TENTATIVE PLAT CONDITIONS OF APPROVAL:
1) City of Tucson Development Standards (DS) Section No.10-02.2.4.K: The following shall be addressed in the Grading Plan review stage for this phase of Tierra Vista:
a) DS Sec.10-02.2.4.K: Provide soils report. Include recommendations for minimum distances and slopes for drainage away from foundations, as well as results from infiltration testing.
b) DS Sec.10-02.3.5.1: All basins for Tierra Vista shall be completed within Phase 2, as stated in the drainage addendum (to the Drainage Report) dated December 30, 2003. Percolation tests are required for any basin that utilizes infiltration as a means of basin drainage. Additional percolation testing may be required at post-construction inspection.
c) IBC Chapter 36, Section 9: Grading Plan shall be submitted for review for a Grading Permit, and shall include the following grading information:
i) including a revised Drainage Report addressing temporary phase grading,
ii) showing compliance with General Note 15,
iii) describing grading and drainage improvements beyond the Phase 2 boundary line, including interceptor swales and / or other temporary drainage measures,
iv) sizing for scuppers will be reviewed at grading plan review stage.
d) Drainage outlet structures and appurtenant erosion controls in connection to Phase 2 inlet drainage structures shall be constructed for Phase 2.
For further clarification, call me at 791-5550, extension 2204.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services Department
02/12/2004 JOE LINVILLE LANDSCAPE REVIEW Denied Revise the landscape and native plant preservation plans to correspond with the phase under review. DS 2-05.2.4.C
Include revised plant preservation calculations and revised grading limits.
02/13/2004 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Denied COMPREHENSIVE PLANNING TASK FORCE COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

S02-017 Tierra Vista 02/12/04

(X) Tentative Plat
() Development Plan
(X) Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other

CROSS REFERENCE: C9-01-31

NEIGHBORHOOD PLAN: General Plan

GATEWAY/SCENIC ROUTE: Yes

COMMENTS DUE BY: February 10, 2004

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No Annexation or Rezoning Conditions, Not an RCP - No Comment
() Proposal Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies With Plan Policies
(X) See Additional Comments Attached
() No Additional Comments - Complies With Planning Comments Submitted on:
(X) Resubmittal Required:
(X) Tentative Plat
() Development Plan
(X Landscape Plan
() Other

REVIEWER: msp 791-4505 DATE: February 10, 2004

Tierra Vista
S02-017
February 10, 2004

Tentative Plat S02-017 (Phase I., II., & III.) is subject to rezoning C9-01-31, KB Home – Alvernon. Please revise tentative plat and landscape plan to comply with conditions of Rezoning, Case No. C9-01-31. Please address the following:

Please revise tentative plat and landscape plan to reflect the correct numbering system to be used on all the lots. Landscape plan, sheet L-8 identifies the lots adjacent to and south of “Common Area B” within Phase II, as lots 359 through 361 and the tentative plat, sheet 5 of 9 identifies same lots as 1 through 3.

Please revise landscape plan, sheet L-8 to identify the common area located adjacent to and north of lots 359-361 (lot numbers subject to change, see previous note # 1), as “Common Area B.”