Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: REVISION - TENTATIVE PLAT REVIEW
Plan Number - S01-010
Review Name: REVISION - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/09/2007 | MARILYN KALTHOFF | START | PLANS SUBMITTED | Completed | |
05/23/2007 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | 1) A vehicular use area must be provided with post barricades or wheel stop curbing designed to prevent parked vehicles from extending beyond the property lines; damaging adjacent landscaping, walls, or buildings and to prevent vehicles from driving onto unimproved portions of the site. per DS 3-05.2.3.C. Revise the plans as necessary to provide barriers at unpaved areas. 2) A street landscape border per LUC 3.7.2.4 is required along Price Street. 3) Revise the plans to allow water harvesting in the hydro-seed areas by depressing the grades if possible. 4) Revise the plans to provide canopy trees in compliance with LUC 3.7.2.3.A.1.a for the parking spaces northeast of the future administration building and east of the maintenance building. |
05/24/2007 | JIM EGAN | COT NON-DSD | FIRE | Denied | The aggregate capacity of the old and new fuel tanks shown East of Sun Tran Bl. cannot exceed 48,000 gallons. The first tank must be set back from the ROW line by 50 feet. Please see IFC Table 2206.2.3. |
05/25/2007 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Approved | DEPARTMENT OF URBAN PLANNING & DESIGN COMMENTS Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT S01-010 COT Suntran Bus Storage: Revision 05/25/07 () Tentative Plat (XXXX) Development Plan (XXXX) Landscape Plan () Revised Plan/Plat () Board of Adjustment () Other CROSS REFERENCE: c12-94-16 NEIGHBORHOOD PLAN: General Plan GATEWAY/SCENIC ROUTE: COMMENTS DUE BY: 06/07/07 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: () No Annexation or Rezoning Conditions, Not an RCP - No Comment (XXXX) Proposal Complies with Annexation or Rezoning Conditions () RCP Proposal Complies with Plan Policies () See Additional Comments Attached () No Additional Comments - Complies With Planning Comments Submitted on: () Resubmittal Required: () Tentative Plat () Development Plan () Landscape Plan () Other REVIEWER: drcorral 791-4505 DATE: 05/23/07 |
06/08/2007 | DAVID RIVERA | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: S01-010 COT Suntran Bus Storage Tentative Plat (Revision) TRANSMITTAL DATE: June 8, 2007 DUE DATE: June 07, 2007 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. This plan has been reviewed for compliance with Development standards 2-03 and 2-09. This plan is for revision of the tentative plan and development plan requirements. Applicable development standard sections have been listed. 1. Section 4.1.7.1, LUC, permits a maximum of one year from the date of application to obtain approval of a tentative plat. If, at the end of that time, the tentative plat has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this tentative plat is May 28, 2008. 2. Please ensure that all text height is 12 point or greater. DS 2-03.2.1.C and DS 2-05.2.1.C 3. List the name of the subdivision, number of lots and list legal description in the title block. DS 2-03.2.1.G and DS 2-05.2.1.G 4. If applicable add a note identifying by case number any zoning variance or modification, such as Board of Adjustment, DDO, PDO, DSMR or COT LUC waiver by the City Manager. List the case number date of approval and list any conditions of the approval. DS 2-03.2.2.B.6 and DS 2-05.2.2.B.6 5. Label the PAAL widths for the two north-south PAALs along the West Side of the parking lot. Also please delineate and dimension the PAALs along the north side of the development. It appears that vehicular use areas are proposed but are not defined. DS 2-05.2.4.D.3 6. Label the width of all pedestrian sidewalks. The minimum width of the required sidewalks is four (4) feet. A five-foot (5) wide pedestrian refuge area which includes a four (4) foot wide sidewalk is required along the entire perimeter of the maintenance building if vehicular use is proposed around the perimeter. If the area is not to be accessed by the general public this requirement can be replaced with a five-foot (5) wide striped pedestrian refuge area only (delineated and striped five-foot (5) wide asphalt). DS 2-05.2.4.K 7. Label all future buildings, which are not part of this construction phase as i.e., "Future Construction" or "Future building footprints". It has to be clear on the plan that these future buildings are to be permitted on a separate permit in the future. DS 2-05.2.4.N 8. Please revise the 14' x 70' loading spaces. Under the assumption that this is to be an area for two of the required loading spaces the area drawn on the plan does not scale to a full 14' x 70' area. Both spaces must have a minimum of 35 feet in length. DS 2-05.2.4.O 9. The ADA parking calculation must be revised as follows. The IBC code section 1106.5 has been revised to the following and affects the number of van accessible spaces required. One van accessible space for every six disabled parking spaces required or fraction of six. In this case the number of disabled parking spaces required is 7 and two of the 7 must be van accessible spaces with eight-foot wide access aisles. DS 2-05.2.4.P 10. The development standards for the bicycle parking have also been revised since the first approval of the previous development plan. All class two bicycle parking must be within 50 feet of the main entrance to the buildings. please provide the location of the main entrance to the building and label the distance from the bicycle parking facility to te the main entrance. Provide a detail for the class two bicycle parking facilities that meet the new development standards 2-09.2.3. There are specific types of approved class two facilities. Please be specific. DS 2-05.2.4.Q 11. Please ensure that the Dumpster enclosure is not with the sight visibility triangle. DS 2-05.2.4.T 12. Indicate the location and type of postal service to be provided for this development. DS 2-05.2.4.V 13. All walls that are above eight feet in height must meet the greatest of the 21 feet or the height of the structure or will require a DDO. It appears that the wall along the East Side of Suntran Blvd. does not meet the 21-foot setback. A DDO will be required, COT waiver, or move the wall to meet the required setback of 21 feet wherever the wall does not meet the required setback. 14. Additional comments may be forthcoming a based on revisions and response to comments. If you have any questions about this transmittal, please call David Rivera, (520) 837-4957. DGR C:\planning\cdrc\tentativeplat\S01010tpr.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan/ tentative plat, and additional requested documents. |
07/19/2007 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | DATE: July 19, 2007 To: Patricia Gehlen CDRC/Zoning Manager FROM: Loren Makus, EIT Engineering Division SUBJECT: COT Suntran Bus Storage - Revision S01-010 (First Revision Review) T13S, R13E, Section 22 RESUBMITTAL REQUIRED: None The Revised Plan has been reviewed by the Engineering Division and we recommend approval at this time. Please note that a Stormwater Pollution Prevention Plan will be required as part of the grading permit submittal and that Floodplain Use Permits will be required for this development. If you have any questions, I can be reached at 520.837.4927 or loren.makus@tucsonaz.gov. Loren Makus, EIT Senior Engineering Associate |
07/25/2007 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES July 25, 2007 John C. McGann G.L.H.N. Architects and Engineers, Inc. 2939 East Broadway Blvd. Tucson, Arizona 85716 Subject: S01-010 Suntran Bus Storage Revised Tentative Plat Dear John: Your submittal of May 9, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 4 Copies Revised Tentative Plat (Landscape, Fire, Zoning, DSD) 3 Copies Revised Landscape Plan (Landscape, Zoning, DSD) Should you have any questions, please call me at 837-4919. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 795-1822 Tp-resubmittal |