Plan Number: RZ19-002
Parcel: Unknown

Review Status: Completed

Review Details: REZONING - PAD PREZONE

Plan Number - RZ19-002
Review Name: REZONING - PAD PREZONE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/15/2019 ELISA HAMBLIN ZONING REVIEW Reqs Change To: Rezoning Division
Re: Pre-PCD Review

Date: May 15, 2019

Valencia and Houghton Area Planned Community Development
Mixed use Master Plan Development
RZ19-002

Thank you for the opportunity to review the Valencia and Houghton Planned Community Development (PCD). The Zoning Review Section has primarily reviewed this proposed PCD for conformance with the sections of the Unified Development Code (UDC) which address the intent and submittal requirements for the PCD, which includes Section 3.5.6 and Administrative Manual 2-05.0.0. Additionally, comments here focus on the ease of administration of the proposed PCD should it be adopted and utilized for development review.

Regarding UDC Section 3.5.6.
The proposed PDC is found to not address the purpose of the PCD as described in Section 3.5.6.A. Specifically, the lack of development standards or design guidelines does not create a "unified planned development" or present "alternative zoning districts". Postponing work until developers successfully bid on a development area does not ensure the entire PCD will be developed in a unified manner. Additionally, the proposed PCD calls for delay of planning and building of infrastructure to serve the area. This does not meet the intent of 3.5.6.A.5.

Regarding Administrative Manual 2-05.0.0.
The proposed PDC is found to not meet the content requirements as described in Section 2-05.4.2. A Master Site Plan is required and must include specific information on the Land Use Plan. Sufficient detail has not been provided in regards to 2-05.4.2.A.1.c. and d. Within the Land Use Plan, Development Standards must also be established. Sufficient detail has not been provided in regards to 2-05.4.2.A.3.a. and b. Design Guidelines are also required per 2-05.4.2.A.4. Additionally, the proposed PCD does not adequately address Phase and Implementation Plans and described in 2-05.4.2.C. and D.

General Comments
The approach of this PCD is to postpone much of the detailed planning until developers have been selected for specific development areas. The lack of certainty in this approach will create challenging situations for the administration and enforcement of the intent of the PCD. As there are no minimum density requirements provided in the proposed PCD, the development of each area could potentially be re-negotiated with each developer. Although this provides flexibility for the ASLD, it likely will result in low-density residential being planned for on a majority of the PCD. This approach is problematic when considering the intent of a PCD per the City's UDC.

Should you have questions, contact me at elisa.hamblin@tucsonaz.gov or (520)837-4966.

Elisa Hamblin, AICP
Principal Planner
City of Tucson, Planning and Development Services Department
06/14/2019 ANDREW CONNOR LANDSCAPE REVIEW Completed New development will need to meet requirements specified in UDC 7.6. LANDSCAPING AND SCREENING unless specified differently in PAD document.
07/03/2019 MWYNEKE1 DOT (ALL) REVIEW Reqs Change
07/03/2019 MWYNEKE1 ENGINEERING REVIEW Reqs Change
07/03/2019 MWYNEKE1 URBAN PLANNING REVIEW Reqs Change
07/03/2019 MWYNEKE1 FIRE REVIEW Completed
07/03/2019 MWYNEKE1 ENV SVCS REVIEW Completed
07/03/2019 MWYNEKE1 POLICE REVIEW Completed
07/03/2019 MWYNEKE1 PARK AND RECREATION REVIEW Needs Review
07/03/2019 MWYNEKE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed
07/03/2019 ED ABRIGO PIMA COUNTY ASSESSOR Completed
07/03/2019 MWYNEKE1 ADA REVIEW Completed
07/03/2019 MWYNEKE1 HC SITE REVIEW Completed
07/03/2019 MWYNEKE1 UTILITY CLEARANCES COT STREETS DIVISION Completed
07/03/2019 MWYNEKE1 CONSERVATION & SUSTAINABLE DEVELOPMENT OCSD Completed
07/03/2019 MWYNEKE1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
07/03/2019 MICHAEL WYNEKEN ZONING-DECISION LETTER REVIEW Completed
07/03/2019 MWYNEKE1 UTILITY CLEARANCES PC WASTEWATER MGMT Reqs Change
07/03/2019 MWYNEKE1 PIMA COUNTY WASTEWATER Needs Review
07/03/2019 MWYNEKE1 UTILITY CLEARANCES QUEST COMMUNICATION Completed
07/03/2019 CHRIS POIRIER PIMA COUNTY ADDRESSING Completed Good afternoon,

Pima County Addressing does not have comments on RZ19-002 Valencia and Houghton .


Thank you

Nicholas Jordan
Addressing Specialist
Pima County Development Services Department
201 N Stone AV
Tucson, AZ 85701
(520) 724-9623
07/03/2019 MWYNEKE1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
07/03/2019 MWYNEKE1 PIMA COUNTY PIMA ASSN OF GOVTS Completed
07/03/2019 MWYNEKE1 UTILITY CLEARANCES COX COMMUNICATION Completed
07/03/2019 MWYNEKE1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
07/03/2019 MWYNEKE1 UTILITY CLEARANCES EL PASO NATURAL GAS Completed
07/03/2019 MWYNEKE1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed