| 10/15/2018 | NROSS1 | START | PLANS SUBMITTED | Completed | |
| 10/18/2018 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 10/19/2018 | SSHIELD1 | H/C SITE | REVIEW | Passed | |
| 10/19/2018 | DAVID RIVERA | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Section Manager PROJECT: DS18-21 Sueno Hermoso Lots 1-6 DP17-0297 TRANSMITTAL DATE: October 19, 2018 DUE DATE: October 19, 2018 TSMR OK to Submit - Denied TSM Section 10-01.9.0 Fig 25, Section 10-01.2.1.B & 10-01.2.3.A.1 are not relevant to the elimination of required vehicle parking spaces. A Technical Standards Modification Request is used to modify a standard. To eliminate required vehicle parking a Board of Adjustment for Variance would be required. If you have any questions about this transmittal, please call Steve Shields, (520) 837-4956 |
| 10/24/2018 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Denied | |
| 10/25/2018 | KELLY LEE | ZONING-DECISION LETTER | WRITE DECISION LETTER | Reqs Change | Hi Rick: The "ok to submit" was denied by engineering. You may view the comments online on PRO, Activity Number DS18-21 or below. CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Section Manager PROJECT: DS18-21 Sueno Hermoso Lots 1-6 DP17-0297 TRANSMITTAL DATE: October 19, 2018 DUE DATE: October 19, 2018 TSMR OK to Submit - Denied TSM Section 10-01.9.0 Fig 25, Section 10-01.2.1.B & 10-01.2.3.A.1 are not relevant to the elimination of required vehicle parking spaces. A Technical Standards Modification Request is used to modify a standard. To eliminate required vehicle parking a Board of Adjustment for Variance would be required. If you have any questions about this transmittal, please call Steve Shields, (520) 837-4956 Once you have revised the plans with this information: Please upload the application, plan set (one compiled PDF), and reports, as applicable, to https://www.tucsonaz.gov/file-upload-pdsd. Please remember to label each file name must start with a number that represents the review being performed (1 for 1st review, 2 for 2nd review, etc.) Name each document and plan set with a unique name that identifies the file Example 1 (first submittal): 1_application.pdf 1_rezoning_conditions.pdf 1_development_package.tiff 1_soils_report.pdf If the submittal is complete, you will receive a confirmation email of the activity number and assessed fees within 5 working days of the upload date. The confirmation email will be the start date of the 20 working day review. You will need to pay the assessed fees in person prior to the completion of the first (1st) review. Please note, a project using electronic submittal and review may not use paper for a resubmittal or revision. Please let me know if you have any questions. thank you, Kelly Lee |