Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DS18-09
Parcel: 124051670

Address:
1133 E 7TH ST

Review Status: Completed

Review Details: DEV STDS MODIFICATION REVIEW

Permit Number - DS18-09
Review Name: DEV STDS MODIFICATION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/31/2018 KELLY LEE START PLANS SUBMITTED Completed
05/31/2018 MARTIN BROWN FIRE REVIEW Reqs Change Buildings deeper than 150' on a lot require fire department access. Please review sections 503.2.1, 503.2.5, 503.3 of the 2012 International Fire Code for guidance.
05/31/2018 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change DS18-09

1) TSMR request 2; Relief from UDC standard 7.4.6.D. Provide on plans the turning radii for a standard AASHTO passenger vehicle showing that said vehicle can enter and exit the proposed garage. When providing turning radii assume that one vehicle is already parked in the garage.

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
06/01/2018 KLEE1 ENV SVCS REVIEW Approved Kelly,




The Environmental & General Services Department (EGSD) has completed our review of the Technical Standard Modification Request for the Graymont subdivision proposal. The applicant is requesting approval for individual refuse and recycling plastic containers for each residential unit rather than providing a centralized on-site waste collection system. There are eight residential units proposed for this development. Although not stated in the TSMR, we assume this request is due to the lack of space within the proposed development to provide the necessary access and maneuverability for refuse vehicles servicing metal containers housed in concrete block enclosures.




Due to the space restrictions on this site, EGSD approves the use of refuse and recycling plastic containers for each residential unit in the Graymont development rather than providing a centralized waste collection system.




Please contact me if there are any questions concerning this review.




Tom Ryan, P. E.

City of Tucson - Environmental & General Services Department
06/04/2018 STEVE SHIELDS ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Site Section Manager

PROJECT: DS18-09
1129 E. 7th Street
DP18-0050

TRANSMITTAL DATE: June 4, 2018

DUE DATE: June 6, 2018

COMMENTS:

01. TSMR - 7-01.4.3.A - Approved

02. TSMR - 8-01.5.1.A - Approved

03. PDMR - 7.4.6.D - Approved

If you have any questions about this transmittal, please call Steve Shields, (520) 837-4956
06/04/2018 SSHIELD1 H/C SITE REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Site Section Manager

PROJECT: DS18-09
1129 E. 7th Street
DP18-0050

TRANSMITTAL DATE: June 4, 2018

DUE DATE: June 6, 2018

COMMENTS:

01. TSMR - 7-01.4.3.A - Approved

02. TSMR - 8-01.5.1.A - Approved

03. PDMR - 7.4.6.D - Approved

If you have any questions about this transmittal, please call Steve Shields, (520) 837-4956
06/08/2018 ALEXANDRA HINES ZONING-DECISION LETTER WRITE DECISION LETTER Reqs Change Resubmit to address reviewer's comments.