Permit Number: DS18-07
Parcel: 11204201A

Review Status: Completed

Review Details: DEV STDS MODIFICATION REVIEW

Permit Number - DS18-07
Review Name: DEV STDS MODIFICATION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/26/2018 LPEREZ2 START PLANS SUBMITTED Completed
03/01/2018 SSHIELD1 H/C SITE REVIEW Reqs Change See Zoning comments
03/01/2018 STEVE SHIELDS ZONING REVIEW Reqs Change As no development package was submitted for review prior to submittal of the PDMR Zoning has contacted the architect and directed needed changes to the plan along with reviewing the procedure for the submittal of the PDMR. The architect will be revising the development package and then resubmit the PDMR.

As our permit counter accepted the PDMR without the OK to Submit from our Zoning and Engineering staff there will be no additional fees required for the resub of the PDMR.
03/02/2018 ZELIN CANCHOLA TRAFFIC TRAFFIC Reqs Change DS18-07
2618 E Ft Lowell
PDMR
Reviewer - Zelin Canchola, TDOT

The extension of driveway seems to be in conflict with parking space. Reduce width to 24 feet.

Use PAG standard driveway specifications for work within the right of way. show on plan. A driveway apron is acceptable.

Connect to existing sidewalk with concrete sifewalk.

A City of Tucson excavation permit will be required at time of construction within the right of way.

If you have any questions, I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov
03/02/2018 LOREN MAKUS ENGINEERING REVIEW Passed
03/05/2018 ALEXANDRA HINES ZONING-DECISION LETTER WRITE DECISION LETTER Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:
1) Two rolled sets of the plans
2) All approved documents submitted previously
3) A disk containing all items submitted
4) All items requested by review staff
5) All items needed to approve these plans