Permit Review Detail
Review Status: Completed
Review Details: DEV STDS MODIFICATION REVIEW
Permit Number - DS18-03
Review Name: DEV STDS MODIFICATION REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/02/2018 | QJONES1 | START | PLANS SUBMITTED | Completed | |
02/09/2018 | AHINES2 | ENV SVCS | REVIEW | Approv-Cond | Environmental & General Services has completed our review of the Technical Standard Modification Request (TSMR) for the Rio Viejo Apartments site. The applicant is proposing to place approximately one-half (the lower one-half) of the metal waste containers below the existing ground surface. This will reduce the height of the screening (concrete masonry wall) needed around the containers. Environmental & General Services approves the TSMR for the Rio Viejo Apartments site. Our comment is that the design should insure that the containers are accessible for servicing by the refuse vehicles with the partial below ground placement of the containers. Drainage of the below ground container area is provided by the floor drains. Please contact me if there are any questions concerning this review. Tom Ryan, P. E. City of Tucson - Environmental & General Services Department Thomas.Ryan@tucsonaz.gov |
02/21/2018 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
02/23/2018 | KELLY LEE | ZONING-DECISION LETTER | WRITE DECISION LETTER | Approved | TSMR approved on 02/23/2018. Add the case number, DS18-03, in the lower right hand corner next to the title block on each sheet of the development package. Add a general note that includes the case number, type of request, date of approval, modifications granted, and conditions imposed to the development package. Conditions include: 1.The design should insure that the containers are accessible for servicing by the refuse vehicles with the partial below ground placement of the containers. 2.Drainage of the below ground container area is provided by the floor drains. |