Permit Review Detail
Review Status: Completed
Review Details: DEV STDS MODIFICATION REVIEW
Permit Number - DS17-25
Review Name: DEV STDS MODIFICATION REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/05/2017 | KROBLES1 | START | PLANS SUBMITTED | Completed | |
| 12/05/2017 | SSHIELD1 | H/C SITE | REVIEW | Approv-Cond | See Zoning comments |
| 12/05/2017 | DAVID RIVERA | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Principal Planner PROJECT: DS17-25 Pro-Tires DP21-0021 TRANSMITTAL DATE: December 5, 2017 DUE DATE: December 8, 2017 COMMENTS: 01. TSMR - 7-01.4.1.B - The TSMR to allow the sidewalk to be relocated to the east side of the access lane is approved but as the sidewalk running along the west property line form the sidewalk along Speedway Blvd. to the building, has been eliminated, the proposed striped area shown running south from the crosswalk that runs from the southeast corner of the building to the proposed sidewalk, is required to be a sidewalk physically separated from the PAAL that meets all requirements of TSM 7-01 and ICC A117.1, Section 403.3. A revision is required to development package DP15-0021. If you have any questions about this transmittal, please call Steve Shields, (520) 837-4956 |
| 12/08/2017 | KELLY LEE | ZONING-DECISION LETTER | WRITE DECISION LETTER | Approved | TSMR approved on 12/08/2017. Add the case number, DS17-25, in the lower right hand corner next to the title block on each sheet of the development package. Add a general note that includes the case number, type of request, date of approval, modifications granted, and conditions imposed, if any, to the development package. |