Review Date Reviewer's Name Type of Review Description Status Comments
05/20/2015 PGEHLEN1 START PLANS SUBMITTED Completed
05/22/2015 RONALD BROWN H/C SITE REVIEW Reqs Change Add a note to the drawing and describe how the intent of the Inclusive Home Design Ordinance #10463 is acheived.
05/22/2015 ZELIN CANCHOLA TRAFFIC TRAFFIC Reqs Change DS15-16
Park Modern

Relief from Curb Radii connection from private develoment to public righs of way is granted however a standard drive apron instead of a modified 5 foot radius is preferred .

If you have any questions, I can be reached at 520 837 6659 or zelin.canchola@tucsonaz.gov
05/26/2015 DAVID RIVERA ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office
FROM: David Rivera
Principal Planner

PROJECT: DS15-016
3016 N Tyndall Avenue
TSMR Request - FLD Development "Park Modern"

TRANSMITTAL DATE: May 26, 2015

DUE DATE: May 28, 2015

COMMENTS: See Zoning comments below

01. UDC Section 7-01.3.3.B: Conditionally approved with a pedestrian connection to the closest dumpster location from lots 10 - 14.

02. UDC Section 10-01.2.3 Table 1: Conditionally approved, contingent if approved by Environment Services and Fire Departments.

03. UDC Section 10-01.3.2.C Figure 6: Conditionally approved, contingent if approved by COT Transportation Department.

04. UDC Section 8-01.5-2 (Figure B) & 8-01.5.3.B: Conditionally approved, contingent if approved by Environment Services.

05. UDC Section 10-01.3.2.A .B.1: Approved

05. UDC Section 10-01.2.7.A: Approved

06. Ensure that the TSMR case number is listed in the lower right corner of all plans sheets and that the case number, date of approval, Code Section numbers and any conditions of approval are listed under the general notes section.

If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.
05/27/2015 JASON GREEN ENGINEERING REVIEW Approved DATE: May 27, 2015
SUBJECT: TSMR Request- Engineering Review
TO: Patricia Gehlen, CDRC Manager
LOCATION: 3016 N Tyndall Ave
REVIEWERS: Jason Green, CFM
ACTIVITY: DS15-16

SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the proposed Technical Standard Modification Request (TSMR). Engineering Division recommends approval of the TSMR at this time.

TSMR PLAN:

1. Provide a General Note on the Development Plan Package (DP15-0055) referencing the TSMR Case #, date of approval and any conditions (if applicable).

For any questions or to schedule meetings call me at 837-4929.

Jason Green, CFM
Senior Engineer Associate
Engineering Division
Planning & Development Services Department
05/28/2015 KEN BROUILLETTE FIRE REVIEW Approved
05/29/2015 PATRICIA GEHLEN ZONING-DECISION LETTER WRITE DECISION LETTER Reqs Change Revise plans and resubmit TSMR
05/29/2015 PGEHLEN1 ENV SVCS REVIEW Reqs Change The TSMR has been reviewed on behalf of Environmental Services. The Plan requires change prior to approval.
1. The turning movements of the service vehicle have been added to the plan, however they are shown incorrectly. The width of the truck path through the turning movements is 14 ft. , not the 10 ft. shown.
2. Though it is acknowledged the existing wall on the adjoining property is up to 7.5 ft. from the property line, it doesn’t appear there is a restriction that would prevent the owner of that property from placing the wall on the property line in the future. Show the 3 ft. clearance from the property line.
The above two comments relate to TSM 8-01.5.3E which was mentioned in the original comments but not specifically in this TSMR request. It appears that minor modifications to the plans can accommodate these requirements. Environmental Services is not willing to grant modifications to this standard, and the required turning movements and clearances need to be provided.