Permit Number: DS10-03
Parcel: 11103058B

Review Status: Completed

Review Details: DEV STDS MODIFICATION REVIEW

Permit Number - DS10-03
Review Name: DEV STDS MODIFICATION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/02/2010 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
03/02/2010 DAVE MANN FIRE REVIEW Approved
03/02/2010 RONALD BROWN ZONING HC REVIEW Passed
03/03/2010 DAVID RIVERA ZONING REVIEW Approv-Cond Zoning has no adverse comments to the proposed DSMR. Approval by the Engneering Review Section is also required.
03/04/2010 MATT FLICK ENGINEERING REVIEW Approved PDSD Engineering has no objection or adverse comment to discharge of the required retention volume into an existing or proposed storm drain adjacent to the site. A permit must be obtained to connect to a public storm drain.

No additional detention is required.

Water harvesting is required in accordance with applicable codes and standards in effect at time of development permit application.
03/08/2010 JOHN BEALL COMMUNITY PLANNING REVIEW Approved PLANNING AND DEVELOPMENT SERVICES COMMENTS
COT CDRC, Community Planning Comments

DS10-03, 3108 E. Prince RD
1st Submittal
Comments due: March 9, 2010
Items reviewed: Development Plan - Tucson Lodge #4 Schematic Site Drainage

Related: land use plan(s) - Northside

Comments: Staff has reviewed this proposal. Staff has no comments. A resubmittal is not required.

John Beall, 3/9/10


F:\Shardir\UPDfiles\Development Review\CASE_REVIEW\DSMR\09-10\DS10-03.doc
03/10/2010 FRODRIG2 ENV SVCS REVIEW Approved Due Date Case Number Project Address
March 5, 2010 DS10-003 3108 E. Prince RD.
Comments: Approved
03/16/2010 JOSE ORTIZ TRAFFIC TRAFFIC Approv-Cond Verify with Steve Tineo of the Department of Transportation - Engineering Division whether the proposed stormwater runoff can be discharged directly into the existing storm drain.
Provide Steve a copy of the site plan for his review to verify compliance.
03/17/2010 PATRICIA GEHLEN ZONING-DECISION LETTER WRITE DECISION LETTER Passed will reopen at time of site plan review.