Permit Review Detail
Review Status: Completed
Review Details: DEV STDS MODIFICATION REVIEW
Permit Number - DS10-03
Review Name: DEV STDS MODIFICATION REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/02/2010 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 03/02/2010 | DAVE MANN | FIRE | REVIEW | Approved | |
| 03/02/2010 | RONALD BROWN | ZONING HC | REVIEW | Passed | |
| 03/03/2010 | DAVID RIVERA | ZONING | REVIEW | Approv-Cond | Zoning has no adverse comments to the proposed DSMR. Approval by the Engneering Review Section is also required. |
| 03/04/2010 | MATT FLICK | ENGINEERING | REVIEW | Approved | PDSD Engineering has no objection or adverse comment to discharge of the required retention volume into an existing or proposed storm drain adjacent to the site. A permit must be obtained to connect to a public storm drain. No additional detention is required. Water harvesting is required in accordance with applicable codes and standards in effect at time of development permit application. |
| 03/08/2010 | JOHN BEALL | COMMUNITY PLANNING | REVIEW | Approved | PLANNING AND DEVELOPMENT SERVICES COMMENTS COT CDRC, Community Planning Comments DS10-03, 3108 E. Prince RD 1st Submittal Comments due: March 9, 2010 Items reviewed: Development Plan - Tucson Lodge #4 Schematic Site Drainage Related: land use plan(s) - Northside Comments: Staff has reviewed this proposal. Staff has no comments. A resubmittal is not required. John Beall, 3/9/10 F:\Shardir\UPDfiles\Development Review\CASE_REVIEW\DSMR\09-10\DS10-03.doc |
| 03/10/2010 | FRODRIG2 | ENV SVCS | REVIEW | Approved | Due Date Case Number Project Address March 5, 2010 DS10-003 3108 E. Prince RD. Comments: Approved |
| 03/16/2010 | JOSE ORTIZ | TRAFFIC | TRAFFIC | Approv-Cond | Verify with Steve Tineo of the Department of Transportation - Engineering Division whether the proposed stormwater runoff can be discharged directly into the existing storm drain. Provide Steve a copy of the site plan for his review to verify compliance. |
| 03/17/2010 | PATRICIA GEHLEN | ZONING-DECISION LETTER | WRITE DECISION LETTER | Passed | will reopen at time of site plan review. |