Permit Review Detail
Review Status: Completed
Review Details: DEV STDS MODIFICATION REVIEW
Permit Number - DS07-27
Review Name: DEV STDS MODIFICATION REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/18/2007 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
07/20/2007 | JIM EGAN | FIRE | REVIEW | Approved | |
07/24/2007 | DAVID RIVERA | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL FROM: David Rivera Principal Planner DSD Zoning Review Section PROJECT: DSMR-07-27 7798 E. Speedway Blvd. Shopping Center Development Development Standard Modification Request to DS 2-08.4.1.A Transmittal date: July 20, 2007 COMMENTS: Approved with conditions 1. Zoning supports the request to allow no placement of a temporary pedestrian access to the site due to ongoing construction in the area where the sidewalk has been requested to be placed by the COT Field Inspector based an approved site plan. a. It is recognized that there is no existing sidewalk that provides access from Speedway to the development at this time. b. The proposed temporary location for the pedestrian access as shown on the approved site plan would reduce the width of the northwest two-way PAAL from the required 24 feet to 19 feet. c. Access from the existing "Los Betos" restaurant to the sidewalk system along the north side of the building across the PAAL and can be provided via the new access ramp and a painted crosswalk. An option to possibly address any ADA concerns would be to add a concrete sidewalk from the Speedway sidewalk to development via the front of the drive-through lane at the Los Betos restaurant, along the front of the restaurant and connect to the new ramp across the PAAL area as mentioned in comment .c. See attached redline for explanation. Redline to Patricia Gehlen for her review before sending CDRC letter to applicant. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. |
07/25/2007 | JOSE ORTIZ | TRAFFIC | TRAFFIC | Approved | Traffic Engineering has no objection to the proposed DSMR |
07/25/2007 | MATT FLICK | ENGINEERING | REVIEW | Approv-Cond | Engineering concurs with the Zoning Review comments. |
07/27/2007 | CDRC1 | COMMUNITY PLANNING | REVIEW | Approv-Cond | DEPARTMENT OF URBAN PLANNING & DESIGN COMMENTS Regarding SUBJECT: Development Standard Modification Request (DSMR) CASE NUMBER: CASE NAME: DATE SENT DS07-27 7760-7798 E. Speedway Blvd. 07/26/07 ( ) Tentative Plat ( ) Development Plan ( ) Landscape Plan ( ) Revised Plan/Plat ( ) Board of Adjustment (XXXX) Other - Site Plan CROSS REFERENCE: NEIGHBORHOOD PLAN: Pantano East Area Plan GATEWAY/SCENIC ROUTE: COMMENTS DUE BY: 0725/07 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: ( ) No Annexation or Rezoning Conditions, Not an RCP - No Comment ( ) Proposal Complies with Annexation or Rezoning Conditions ( ) RCP Proposal Complies with Plan Policies (XXXX) See Additional Comments Attached ( ) No Additional Comments - Complies With Planning Comments Submitted on: ( ) Resubmittal Required: ( ) Tentative Plat ( ) Development Plan ( ) Landscape Plan ( ) Other REVIEWER: drcorral 791-4505 DATE: 7/26/07 This DSMR request requires compliance with applicable policies of the General Plan, those of the Pantano East Area Plan, and the Design Guidelines Manual guidance. The Pantano East Area Plan's Transportation Planning Policy 3.B, states that sidewalks be provided in all private and public developments, as specified in the adopted sidewalk policy. The General Plan's Element 4, Community Character and Design, Policy 4.1.3 states that a circulation system be designed to strengthen bicycle and pedestrian connectivity to all areas of the neighborhood, including recreation areas and parks, adjacent uses, transit facilities, and activity centers. The applicant's request for postponement of pedestrian access to Speedway while construction is taking place can be supported by the plans, if applicant maintains safe pedestrian access along Speedway. |
07/27/2007 | ANDY VERA | ENV SVCS | REVIEW | Completed | ES has no objections to this DSMR. |
07/30/2007 | PATRICIA GEHLEN | ZONING-DECISION LETTER | WRITE DECISION LETTER | Approv-Cond | COMMUNITY DESIGN REVIEW COMMITTEE CITY OF TUCSON - DEVELOPMENT SERVICES July 30, 2007 Burak Bekat Incite Architects 7330 North Oracle Suite 200 Tucson, Arizona 85704 Re: DSMR 07- 27- 7760-7798 East Speedway Boulevard (T06CM03790) Request: DS 2-08.4.1.A - While the northwestern pad of this shopping center is being redeveloped, no pedestrian access will be provided from Speedway Boulevard (which is an existing condition). The Development Standard Modification Request (DSMR) listed above has been APPROVED by the CRDC committee with the following conditions: 1) This is temporary situation and prior to issuance of the final CofO for redevelopment of the northwestern most pad, a sidewalk that connects Speedway Boulevard to this shopping center is required.. PLEASE NOTE THAT A GENERAL NOTE MUST BE ADDED TO THE SITE PLAN WHICH STATES THE DSMR CASE NUMBER, DATE OF APPROVAL, MODIFICATIONS GRANTED, AND CONDITIONS IMPOSED. IN ADDITION, THE CASE NUMBER MUST BE ADDED TO EACH SHEET OF THE SITE PLAN, LANDSCAPE PLAN, AND NPPO PLAN, IN THE LOWER RIGHT CORNER NEAR THE TITLE BLOCK. If you have any additional questions, please contact me at 837-4919. Sincerely, Patricia Gehlen Zoning/CDRC Manager Development Services Department Attachments: 1 XC: file Records Fax (520) 877-3182 |