Permit Number: DS04-22
Parcel: 13329011W

Review Status: Completed

Review Details: DEV STDS MODIFICATION REVIEW

Permit Number - DS04-22
Review Name: DEV STDS MODIFICATION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/19/2004 MARILYN KALTHOFF START PLANS SUBMITTED Completed
08/23/2004 JIM EGAN FIRE REVIEW Approved
08/26/2004 DAVID RIVERA ZONING REVIEW Denied CDRC TRANSMITTAL

FROM: David Rivera
Senior Planner
DSD Zoning Review Section
PROJECT: DSMR-04-22
8495 E Broadway Boulevard
Eastpointe High School Parking Garage
Development Standards Modification Request
Transmittal date: August 26, 2004

COMMENTS: Zoning cannot approve the DSMR as requested.

1. The DSMR is intended for a modification request to a development standard requirement. A DSMR may be approved by CDRC (and possibly with conditions) if the proposed modification is found to be acceptable. A DSMR may not be requested to eliminate a development standard requirement.

a. The DSMR request asking CDRC to eliminate the requirement of D.S.3-05.2.2.B.1. In my opinion, the applicant has not demonstrated a modification that can be considered by CDRC. In order to eliminate the pedestrian refuge with a four-foot sidewalk the applicant must apply for a Board of Adjustment variance. Zoning cannot approve this DSMR as requested.

b. A new carport/garage structure is to be constructed along the west side of the property. The pedestrian refuge area has been placed between the structure and the PAAL. Per the DSMR request a sidewalk is to be constructed between the parking spaces and the PAAL and is to connect to the pedestrian circulation. Per development standards D.S. 2-08.4.1.F, sidewalks or pedestrian refuge areas may not be located between a motor vehicle parking space and the PAAL providing access to that parking space. This DSMR cannot be requested based on the placement of this sidewalk.

*** Reviewer's personal comment: It is clear in development standards 2-08.4.1.F that a pedestrian refuge area or a sidewalk may not be placed between a parking space and a PAAL that provides access to that parking space. It is also clear that per development standards 3-05.2.2.B.1 a five-foot wide pedestrian refuge area is required between a PAAL and an enclosed structure. My question is, would the new building, parking garage if it has garage doors be considered an enclosed structure? If so, a five-foot wide pedestrian refuge area is required between the PAAL and the enclosed structure. In some cases maybe even this one both DS 2-08.4.1.F. and DS 3-05.2.2.B.1 contradict each other. (Personally I don't feel that we should require a pedestrian refuge adjacent to a carport or garage.)

If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.
08/26/2004 DALE KELCH TRAFFIC TRAFFIC Approved Traffic Engineering recommends APPROVAL of this DSMR.

D. Dale Kelch, EIT
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)
dale.kelch@tucsonaz.gov
08/27/2004 MKALTHO1 COMMUNITY PLANNING REVIEW Approved DEPARTMENT OF URBAN PLANNING & DESIGN

Regarding

SUBJECT: Development Standard Modification Request (DSMR)

CASE NUMBER: CASE NAME: DATE SENT

DSMR 04-22 Eastpointe H.S. Parking Garage I 08/27/04

( ) Tentative Plat
( ) Development Plan
( ) Landscape Plan
( ) Revised Plan/Plat
( ) Board of Adjustment
(XXXX) Other - Site Plan

CROSS REFERENCE:

NEIGHBORHOOD PLAN: Pantano East

GATEWAY/SCENIC ROUTE:

COMMENTS DUE BY: 8/25/04

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

( ) Proposal Complies with Annexation or Rezoning Conditions
(XXXX) Proposal in Substantial Compliance with Plan Policies
( ) See Additional Comments Attached
( ) No Additional Comments - Complies With Planning Comments Submitted on:
( ) Resubmittal Required:
( ) Tentative Plat
( ) Development Plan
( ) Landscape Plan
( ) Other

REVIEWER: D. Estolano 791-4505 DATE: 8/23/04
08/27/2004 MATT FLICK ENGINEERING REVIEW Approved No objection to the DSMR for DS 3-05.2.2.B.1.
09/02/2004 PGEHLEN1 ENV SVCS REVIEW Approved
09/02/2004 PATRICIA GEHLEN ZONING-DECISION LETTER WRITE DECISION LETTER Approv-Cond COMMUNITY DESIGN REVIEW COMMITTEE
CITY OF TUCSON - DEVELOPMENT SERVICES


September 2, 2004

Kevin Petrick, Architect
KBP Architect, LLC.
11635 E. Tanque Verde Road
Tucson, AZ 85749

Re: DSMR 04-22 - 8495 East Broadway Blvd.

Request: DS 3-05.2.2.B.1 - Modify on-site pedestrian circulation system.



The Development Standard Modification Request (DSMR) listed above has been approved by the Community Design Review Committee (CDRC), subject to the following conditions:

1. Relocate continuous on-site pedestrian circulation system so it is not located behind parking spaces in the proposed parking garage.

If you have any additional questions, please contact me at 791-5608.

Sincerely,


Patricia Gehlen
Zoning Manager
Development Services Department

clg\c:\dsd\0420app.doc

Attachments: 8
XC: file
Records
Larry Simmons, 8495 East Broadway Blvd., Tucson, Az 85710