Permit Review Detail
Review Status: Active
Review Details: TENTATIVE PLAT REVIEW
Permit Number - DP22-0248
Review Name: TENTATIVE PLAT REVIEW
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/07/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 09/07/2022 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | |
| 09/07/2022 | SBEASLE1 | OTHER AGENCIES | U. S. POST OFFICE | Passed | |
| 09/07/2022 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Active | |
| 09/07/2022 | ANY | ZONING-DECISION LETTER | REVIEW | Active | |
| 09/07/2022 | ANY | UTILITIES | TUCSON ELECTRIC POWER | Active | |
| 09/07/2022 | TOM MARTINEZ | OTHER AGENCIES | AZ DEPT TRANSPORTATION | Active | |
| 09/07/2022 | SBEASLE1 | OTHER AGENCIES | PIMA ASSN OF GOVTS | Passed | |
| 09/07/2022 | ANY | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Active | |
| 09/07/2022 | ANY | PIMA COUNTY - ADDRESSING | PIMA COUNTY - ADDRESSING | Active | |
| 09/20/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Wilmot RV Storage Development Package (1st Review) DP22-0248 TRANSMITTAL DATE: September 20, 2022 DUE DATE: October 03, 2022 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is September 01, 2023. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 – Provide the development package case number, DP22-0248, adjacent to the title block on all sheets. 2. COMMENT: 2-06.4.3 - Provide the rezoning case number, C9-21-05, adjacent to the title block on all sheets 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 3. COMMENT: 2-06.4.7.A.3 – Provide the rezoning conditions for case C9-21-05 on the plan. 4. COMMENT: 2-06.4.7.A.4 – The proposed use, Vehicle Storage, listed under Zoning and Land Use Note 4 is not a use classified per the UDC. It appears that this will be an RV storage facility where a person rents a space to store there RV. If this is the case the use is considered Personal Storage. 2-06.4.8 - Existing Site Conditions The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 5. COMMENT: 2-06.4.8.C – Provide the following information for both Wilmot & Los Reales, dimensioned width of paving, curbs, curb cuts, and sidewalks. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 6. COMMENT: 2-06.4.9.H.4 – The plans show a “64’ FUTURE PUBLIC R/W” but Streets and Roads Note 16 states “NEW PUBLIC STREETS IS 0 MILES”, are you proposing a public street or not. 7. COMMENT: 2-06.4.9.H.5 – The proposed gravel called out throughout the RV storage area does not meet the requirements of UDC Article 7.4.6.I. Provide written approval from the COT PDSD Engineer for this surface. 8. COMMENT: 2-06.4.9.H.5 – For the entrance road off of Los Reales clearly demonstrate how the requirements of UDC Article 7.4.6.H.1 are met. 9. COMMENT: 2-06.4.9.H.5.a – Until comment 4 is addressed vehicle parking requirements cannot be verified. 10. COMMENT: 2-06.4.9.H.5.c - Until comment 4 is addressed loading zone requirements cannot be verified. 11. COMMENT: 2-06.4.9.H.5.d - Until comment 4 is addressed bicycle parking requirements cannot be verified. 12. COMMENT: 2-06.4.9.R – Clearly show that the requirements of TSM Section 7-01.4.1.A are met. 13. COMMENT: 2-06.4.9.W – Per rezoning condition 5 clearly show that the billboard located in the northwest corner of the site and indicated that it will be removed per the condition. If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 09/27/2022 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | 1. On the cover sheet please include the contact information for the firm that prepared the geotechnical report per Admin Manual section 2-06.4.1. 2. Check and revise as needed the cut and fill quantities, 50 cy of cut and 50 cy of fill seem low for 8.42 acres of disturbance. 3. The entrance road off of Los Reales needs barriers per UDC 7.4.6.H.1. 4. Show a complete pedestrian circulation path including from the proposed building out to E Los Reales Rd. 5. Clarify/label what is used to hold the proposed gravel in the RV storage area in place, ie. curbing or barrier. 6. Show and label bollards along the entrance to splash pad 1 to prevent vehicles from entering into basin 1. 7. The grading plan note 4 calls out for roof drain downspouts per architectural drawings. Downspout locations need to be shown on these plans to ensure they are not discharging onto the sidewalks. 8. The drainage report calls out that the required critical basin reduction is 10% but should be 15%. Revise as needed. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
| 09/28/2022 | DSTIFFE1 | COT NON-DSD | TRAFFIC | Reqs Change | DP22-0248 Comments: 1. This project is going to require a PIA. https://www.tucsonaz.gov/tdot/private-improvement-agreement Call 520-791-5100 for further information. David Stiffey DTM Project Coordinator David.Stiffey@tucsonaz.gov |
| 10/03/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 10/03/2022 | JPEELDA1 | COT NON-DSD | FIRE | Approved | |
| 10/04/2022 | SBEASLE1 | COT NON-DSD | PARKS & RECREATION | Approved | email from: Howard Dutt To: CDRC 10/03/2022 No existing or proposed Tucson Parks and Recreation facilities are affected by this development. Howard Dutt, RLA Project Manager/Landscape Architect Parks and Recreation | City of Tucson Howard.Dutt@tucsonaz.gov main 520.631.2030 |
| 10/18/2022 | AWARNER1 | LANDSCAPE | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Planning and Development Services Department, Plans Coordination FROM: Anne Warner, RLA PDSD Landscape/Native Plant Preservation Section PROJECT: Wilmot RV Storage ACTIVITY NO: DP22-0248 Parcel: 140-44-248A Zoning: C-2 Existing Use: previously graded vacant land Proposed Use: Sel-storage TRANSMITTAL DATE: October 20, 2022 DUE DATE: October 3, 2022 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Landscape Review Section comments were addressed. This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting. General Note - UDC 2-10.4.1 Identification and Descriptive Data - All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan. 1. A 10’ street landscape border is required along the entire length of the project site if interior road is a public right of way. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package YOUR NEXT STEPS: Submit documents to the Filedrop https://docs.tucsonaz.gov/Forms/tucsonpermitapp Select "Existing Application" 1) Comment Response Letter (your response to the reviewer's Requires changes comments) 2) Plan Set (or individual sheets) 3) Any other items requested by review staff If you have any questions, please contact me at anne.warner@tucsonaz.gov |