Permit Review Detail
Review Status: Active
Review Details: DEV PKG
Permit Number - DP22-0235
Review Name: DEV PKG
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/04/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 10/04/2022 | ANY | PLUMBING-COMMERCIAL | REVIEW | Active | |
| 10/04/2022 | SBEASLE1 | ENGINEERING | REVIEW | Approved | Engineering was approved by M. Rieder during the OK to Submit. |
| 10/13/2022 | JCARLTO1 | LANDSCAPE | REVIEW | Passed | |
| 10/20/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
| 10/20/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Fort Lowell Park Improvements Development Package (1st Review) DP22-0235 TRANSMITTAL DATE: October 20, 2022 DUE DATE: October 26, 2022 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is August 14, 2023. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 – Provide the development package case number, DP22-0235, adjacent to the title block on all sheets. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2. COMMENT: 2-06.4.9.R – Clearly demonstrate on the plan that the proposed “NEW ADA COMPLIANT RAMP AND HAND RAILS” meets the requirements of ICC A117.1-2009 Chapter 405. If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 10/26/2022 | ANY | ZONING-DECISION LETTER | REVIEW | Active | |
| 10/26/2022 | FRANK PODGORSKI | HPZ ADVISORY BOARD | HPZ ADVISORY BOARD DATE | Active |