Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP22-0230
Review Name: DEV PKG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/29/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 08/29/2022 | SBEASLE1 | ENGINEERING | REVIEW | Approved | Approved by J. Garcia during the OK to Submit. |
| 08/31/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the installation of the proposed reduced pressure principle backflow prevention assembly so the relief valve cannot become submerged (i.e. locate relief valve above grade). Reference: Sections 303.2 and 608.14.2, IPC 2018. 2. Provide a full-open valve for the water service at the building entrance. Reference: Section 606.1(2), IPC 2018. |
| 09/01/2022 | SAMUEL ROGERS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Samuel Rogers - Planner PDSD Zoning Review Section PROJECT: TMC Life Gain Park Development Package (1st Review) DP22-0230 TRANSMITTAL DATE: August 30, 2022 DUE DATE: September 06, 2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is August 11, 2023. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) Section CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 - Provide the development package case number, DP22-0230, adjacent to the title block on each sheet. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. Zoning and Land Use Notes 2. COMMENT: 2-06.4.7.A.6.a - If applicable, list additional applications and overlays, by case number (if applicable), in lower right corner of each sheet. As a general note provide the type of application processed or overlays applicable, a statement that the project meets the criteria/conditions of the additional application or overlay, the case number, date of approval, what was approved, and the conditions of approval, if any. 2-06.4.8 - Existing Site Conditions The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 3. COMMENT: 2-06.4.8.A - Provide site boundary/subdivision perimeter information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot, or other functional reference system. 4. COMMENT: 2-06.4.8.B - Show any applicable easements on the plan. 5. COMMENT: 2-06.4.8.C - The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 6. COMMENT: 2-06.4.9.H.5.d - Provide a bicycle parking calculation on sheet 4. 7. COMMENT: 2-06.4.9.O - Provide a summary table of setbacks for the proposed structures. 8. COMMENT: 2-06.4.9.Q - Show the Gross Floor Area (GFA) in the footprint of all new structures. 9. COMMENT: 2-06.4.9.S - Provide the width of the pedestrian walkways on the site plan. If you have any questions about this transmittal, Contact Samuel Rogers at (520) 837-6932 or by email Samuel.Rogers@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 09/14/2022 | AWARNER1 | LANDSCAPE | REVIEW | Approved | |
| 09/21/2022 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Building size required to determine if fire sprinklers are required Plans shall show distance to the closest fire hydrant If hydrant is not within 400' of the furthest part of the building fire sprinklers shall be installed Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 Fire Plans Examiner Tucson Fire Department |
| 09/28/2022 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | email from: COTDSDPermits to: natalee w. 09/28/2022 REVIEW NOTICE Returned for Corrections: DP22-0230 Site/Grading/Swppp - Tucson Medical Center, Life Gain Park. FEE BALANCE: $ 511.50 ONLINE PAYMENTS ** If the online amount doesn't match "Fee Balance" above, check again in a few hours ** https://www.tucsonaz.gov/pdsd/fees 1- Click on: Pay Planning & Permit Fees 2- Enter Permit Nbr, example: dp20-0000 (not case-sensitive but a hyphen-dash- is needed) 3- Business/Individual Name: Leave this blank 4- "Continue" 5- In the Pay column - check the boxes YOUR NEXT STEPS 1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on the blue tab - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW 2. Title your SECOND submittal documents accordingly, example: 2_Comment Response Letter 3. UPLOAD documents to Filedrop: - Comment Response Letter (your response to REQUIRES CHANGE comments) - Plan Set (all pages, full set, even if no changes were made) - Documents requested by review staff FILEDROP https://docs.tucsonaz.gov/Forms/tucsonpermitapp - "Existing Application" - "Permit Number" field: enter the number (and any notes for our staff) Sharon Beasley, Certified Permit Specialist City of Tucson, Planning & Development Services Dept. Email: COTDSDpermits@TucsonAz.gov (for development packages, land splits, Thursday Presubmittal meetings) Email: PDSDinquiries@TucsonAz.gov (for building permits) |