Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP22-0200
Review Name: DEV PKG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/27/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
07/29/2022 | SBEASLE1 | PIMA COUNTY - ADDRESSING | PIMA COUNTY - ADDRESSING | Passed | Email from: Nicholas Jordan <Nicholas.Jordan@pima.gov> To: CDRC Tue 7/26/2022 8:52 AM This project does not require review by Pima County Addressing. Thank you Nicholas Jordan Site Review Project Manager - Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |
08/05/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Roadrunner Coffee Alvernon Development Package (1st Review) DP22-0200 TRANSMITTAL DATE: August 4, 2022 DUE DATE: August 10, 2022 COMMENT: Resubmit revised drawings and a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is July 20, 2023. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 – Provide the development package case number, DP22-0200, adjacent to the title block on all sheets. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2. COMMENT: 2-06.4.9.H.5 – Demonstrate how the requirements of UDC Article 7.4.6.F.2.a.(2) are met from the drive-though widow to the drive-through lane. 3. COMMENT: 2-06.4.9.H.5.a – The vehicle parking space calculation is not correct. Per UDC TABLE 7.4.4-1: MINIMUM NUMBER OF MOTOR VEHICLE SPACES REQUIRED, COMMERCIAL SERVICES USE GROUP, Administrative and Professional Office is parked at 1 space per 300 sq. ft. GFA. Also, the mixed-use development reduction does not apply to the food service use, see UDC Article 7.4.4.A. 4. COMMENT: 2-06.4.9.R – Demonstrate on the plat that a minimum 4’-0” wide sidewalk is maintained between the accessible sign show for the eastern accessible parking space and the existing curb to the southeast, TSM Section 7.01.4.3.A. 5. COMMENT: 2-06.4.9.R – Demonstrate how the requirements of TSM Section 7-01.4.1.A are met to Lee St. 6. COMMENT: 2-06.4.9.U – As the proposed development does not match C9-08-15 PDP dated 09/23/08 and following discussions with John Beall a minor change of PDP will be required for this project. Contact John Beall at John.Beall@tucsonaz.gov or Peter McLaughlin at Peter.McLaughlin@tucsonaz.gov for requirements. If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
08/09/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
08/16/2022 | AWARNER1 | LANDSCAPE | REVIEW | Approved | |
08/19/2022 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | 1. Show a complete pedestrian circulation path including out to E Lee St per TSM Section 7-01.4.1.A. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
08/25/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
08/29/2022 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | email from: COTDSDPermits to: lisa bowers 08/29/2022 REVIEW NOTICE Returned for Corrections: DP22-0200 Site/Grading - Roadrunner Coffee Alvernon. New coffee shop with drive-thru window. Fee Balance: $0 (zero) YOUR NEXT STEPS 1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW 2. Title your SECOND submittal documents accordingly, example: 2_Comment Response Letter 3. UPLOAD documents to Filedrop: - Comment Response Letter (your response to REQUIRES CHANGE comments) - Plan Set (all pages, full set, even if no changes were made) - Documents requested by review staff FILEDROP https://docs.tucsonaz.gov/Forms/tucsonpermitapp - "Existing Application" - "Permit Number" field: enter the number (and any notes for our staff) Sharon Beasley, Certified Permit Technician City of Tucson, Planning & Development Services Dept. Email: COTDSDpermits@TucsonAz.gov (for development packages, land splits, Thursday Presubmittal meetings) Email: PDSDinquiries@TucsonAz.gov (for building permits) |