Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP22-0144
Review Name: DEV PKG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/15/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 06/15/2022 | SBEASLE1 | ENGINEERING | REVIEW | Reqs Change | (The following comments are from the OK to Submit.) 1. Show the correct location in the location map on the cover sheet. 2. Show conditions on Western Winds Drive and the connection to this project. 3. Clearly label solid waste enclosure and ensure service area doesn't interfere with parking locations. Loren Makus loren.makus@tucsonaz.gov |
| 06/27/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Western Winds Development Package (1st Review) DP22-0144 TRANSMITTAL DATE: June 27, 2022 DUE DATE: June 27, 2022 COMMENTS: Resubmit revised drawings and a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is May 29, 2023. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 – Provide the development package case number, DP22-0144, adjacent to the title block on all sheets. 2. COMMENT: 2-06.4.4 – Provide a location map that actually shows the area of the project. Major cross streets for this project are Oracle & Limberlost and the location map shows Speedway & Wilmot. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 3. COMMENT: 2-06.4.9.H.5.a – As you are reworking and existing parking area provide a fully dimensioned parking area to include: parking space depth, width and location of proposed wheel stop. 4. COMMENT: 2-06.4.9.R – Based on aerial photos the striped areas show located between the PAALs that provide access to the accessible spaces show up sometime after 2012. Per TSM Section 7-01.4.1.F Sidewalks or pedestrian refuge areas cannot be located between any motor vehicle parking space and the PAAL providing access to that space. Provide approved permit documents that show the location of the striped area between the PAAL and the parking spaces. If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 07/08/2022 | AWARNER1 | LANDSCAPE | REVIEW | Approved | |
| 07/14/2022 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 07/15/2022 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | email from: COTDSDPermits To: Kuhl Brown Fri 7/15/2022 10:10 AM REVIEW NOTICE Returned for Corrections: DP22-0144 Site/Grading - Western Winds. 4131 N WESTERN WINDS DR Fee Balance: $0 (zero) Thank you for the payment. YOUR NEXT STEPS 1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW 2. Title your SECOND submittal documents accordingly, example: 2_Comment Response Letter 3. UPLOAD A RESUBMITTAL to Filedrop: - Comment Response Letter (your response to REQUIRES CHANGE comments) - Plan Set (all pages, full set, even if no changes were made) - Any other documents requested by review staff FILEDROP https://docs.tucsonaz.gov/Forms/tucsonpermitapp - "Existing Application" - "Permit Number" field: enter the number (and any notes for our staff) - Select "PLANS" for all documents Sharon Beasley, Certified Permit Technician City of Tucson, Planning & Development Services Dept. Email: COTDSDpermits@TucsonAz.gov (for development packages, land splits, Thursday Presubmittal meetings) Email: PDSDinquiries@TucsonAz.gov (for building permits) |