Permit Review Detail
Review Status: Active
Review Details: DEV PKG
Permit Number - DP22-0142
Review Name: DEV PKG
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/12/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 09/12/2022 | ANY | COT NON-DSD | TRAFFIC | Active | DP22-0142 Comments: 1. Gates can be installed on property but cannot create a "back-out" situation. An adequate "turn-around" must be provided if gates are installed at the ingress/ egress to a property. This is a safety concern and a requirement when ingress/ egress is on Collector and Arterial streets. There must be adequate room for turn-around. Vehicles cannot be put in a situation where they have to back out onto an arterial street. This criterion is both for the entrance of this property and the exit as shown on the plan. (Technical Manual, 10-01.6.1.E) David Stiffey DTM Project Coordinator David.Stiffey@tucsonaz.gov |
| 09/12/2022 | SBEASLE1 | ENGINEERING | REVIEW | Reqs Change | (comments from the OK to Submit) 1 - A floodplain use permit is required along Avenida Natachee - COT Flood Hazard Zone indicated along West property area. 2 - Entrance throat depth must be indicated and a vehicle maneuvering lane installed per Tucson Code 25-16.2, and 25-42.b. 3 - All gate dimensions must be provided, all pedestrian gates must meet ADA Standards. 4 - Exit gate requires a vehicle maneuvering area, or relocation and adequate signing to prevent errant vehicles from entering the driveway throat from Broadway and blocking/interfering with traffic. 5 - If exit gate is moved towards the roadway, ensure that sight visibility triangles are unaffected. 6 - All work in right of way require a Right-of-way permit. Joshua Garcia joshua.garcia@tucsonaz.gov --------------------------------------------------------------------- Please start a new Floodplain Use Permit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp. Instructions: 1. Is this for a new or existing activity application? – Please select New Application. 2. Submission Type – Select Floodplain Use Permit. 3. Project Name – Enter a name for your project. 4. Type of Permit – Select Commercial or Residential (Residential is for work on single family residences and duplexes.) 5. Select Street Name from the list. You can type the first two letters or number to get closer to your choice in the list. Then select the rest of the address in the boxes provided. 6. Description of Work – Enter in Floodplain Use Permit for…and then put a description of the work being done or reference the building permit number associated with this floodplain use permit. 7. Complete the Applicant Info. (Note APA# is for applicants with an advance payment account. Leave blank is you do not have an APA account. 8. Complete the Contractor, Owner and Architect/Engineer sections as applicable. 9. *IMPORTANT* Supporting Documentation Upload – Provide a complete cost estimate for the project unless it is for a new build/separate structure. You may also provide additional documents you think will be helpful. 10. Sign the application and submit. Contact Scott Haseman at scott.haseman@tucsonaz.gov, Stephen Blood at Stephen.Blood@tucsonaz.gov, or Loren Makus at Loren.Makus@tucsonaz.gov if you have any questions about the FUP. |
| 09/12/2022 | ANY | ZONING-DECISION LETTER | REVIEW | Active | |
| 09/13/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: 6639 E Broadway Blvd – Site Fence Development Package (1st Review) DP22-0142 TRANSMITTAL DATE: September 13, 2022 DUE DATE: September 27, 2022 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is September 04, 2023. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.1 – Provide the name, mailing and email addresses, and phone number of the primary property owner of the site on the cover sheet. 2. COMMENT: 2-06.4.2.D – Provide the page number and the total number of pages in the package (i.e., sheet xx of xx) on each sheet. 3. COMMENT: 2-06.4.3 – Provide the development package case number, DP22-0142, adjacent to the title block on all sheets. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 4. COMMENT: 2-06.4.7.A.1 – The existing zoning “R-2” listed in General Note 1 is not correct and should be R-3. 5. COMMENT: 2-06.4.7.A.4 – Provide a general note stating “EXISTING & PROPOSED USE MULTI-FAMILY, SUBJECT TO USE SPECIFIC STANDARD 4.9.7.B.6”. 6. COMMENT: 2-06.4.7.A.6.a - As Broadway Blvd is designated as an Arterial Gateway on the COT MS&R Map provide a general note on the cover sheet stating “THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.4 MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R) & UDC ARTICLE 5.5 GATEWAY CORRIFOR ZONE (GCR)” If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 09/22/2022 | JVINCEN1 | COT NON-DSD | FIRE | Approved | |
| 09/27/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 09/29/2022 | JCARLTO1 | LANDSCAPE | REVIEW | Approved |