Permit Number: DP22-0072
Parcel: 141185400

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP22-0072
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/08/2022 SBEASLE1 START PLANS SUBMITTED Completed
07/18/2022 SBEASLE1 PIMA COUNTY - ADDRESSING PIMA COUNTY - ADDRESSING Passed email from: Nicholas Jordan <Nicholas.Jordan@pima.gov>
To: CDRC
Sent: Friday, July 15, 2022 11:45 AM

DP22-0072 does not require review by Pima County Addressing.
Thank you

Nicholas Jordan
Site Review Project Manager - Addressing Official

Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-9623
07/25/2022 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Tractor Supply – 9848 E Old Vail Rd
Development Package (2nd Review)
DP22-0072

TRANSMITTAL DATE: July 25, 2022

DUE DATE: July 29, 2022

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is March 24, 2023

CONTENT REQUIREMENTS

1. This comment was not fully addressed. Sheets 25-34 no legal description was provided. COMMENT: 2-06.4.2.B – Provide a brief legal description within the title block on all sheets.

2. COMMENT: 2-06.4.2.D – Provide the page number and the total number of pages in the package (i.e., sheet xx of xx) within the title block on all sheets.

3. This comment was not fully addressed. Sheets 25-34 no case number was provided. COMMENT: 2-06.4.3 – Provide the development package case number, DP22-0072, adjacent to the title block on all sheets.

2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

4. This comment was not fully addressed. Provide the recordation information for the easements. COMMENT: 2-06.4.8.B – Show all easements of record on the plan along with the recordation information. There is a 10’ utility easement along the north property line and a sewer easement that encroaches at the southwest corner of the site.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

5. This comment was not full addressed. Demonstrate that the requirements of TSM Section 7-01.4.2.B are met for the proposed bollards. COMMENT: 2-06.4.9.H.5 – Per UDC Article 7.4.6.H.1 Barriers, such as post barricades or wheel stop curbing, are required in a vehicular use area to prevent vehicles from extending beyond the property lines, to prevent cars from damaging adjacent landscaping, walls, or buildings, overhanging adjacent sidewalk areas, and/or driving onto unimproved portions of the site. That said demonstrate on the plan how vehicles will be prevented from accessing the sidewalk along the striped area located between the accessible parking spaces shown along the north side of the building.

6. This comment was not addressed. Provide the required vehicle parking calculation so that Zoning can provided the required comments that shall be submitted as part of the Variance process. COMMENT: 2-06.4.9.H.5.a – Provide a vehicle parking space calculation the shows the gross floor area used, ratio used, number required & provided along with the number of accessible spaces required & provided to include the number of van accessible spaces required & provided. The gross floor area includes any outdoor areas necessary to provide the service to the public or conduct the activity.

7. This comment was not addressed correctly. Review UDC Article 7.4.6.H.3 and provide the correct wheel stop location dimension for both the detail on sheet 4 & 11. COMMENT: 2-06.4.9.H.5.a – Provide a detail for a standard vehicle parking space. This detail shall include a location dimension for the wheel stops shown on the plan, see UDC Article 7.4.6.H.3.

8. The bicycle parking space calculation does not appear to be correct. Per UDC Article 7.4.3.F.4 the GFA for bicycle parking includes the outdoor areas used for sale of merchandise. Also based on 6 short-term bicycle racks provided on the detail the number of short-term spaces provided should be 12, see UDC Article 7.4.9.B.2.d. COMMENT: 2-06.4.9.H.5.d – Provide a short- & long-term bicycle parking space calculation the provides the number required & provided.

9. This comment was not fully addressed, demonstrate how the requirement of UDC Articles 7.4.9.B.1.e & 7.4.9.D.5 are met. Review the dimensions provided on the bicycle parking detail as some are not correct. COMMENT: 2-06.4.9.H.5.d – Provide a detail for the short- & long-term bicycle parking the demonstrates how the requirements of UDC Article 7.4.9 are met.

10. COMMENT: 2-06.4.7.A.6 – If a variance is applied for and approved provide the Board of Adjustment for Variance case number adjacent to the title block on all sheets and provide a general note stating the case number, date of approval, what was modified and if applicable any conditions of approval.

If you have any questions about this transmittal, please contact Nicholas Ross at Nocholas.Ross@tucsonaz.gov.

To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
08/02/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
08/15/2022 JPEELDA1 FIRE REVIEW Approved
08/15/2022 AWARNER1 LANDSCAPE REVIEW Reqs Change CDRC TRANSMITTAL
TO: Planning and Development Services Department, Plans Coordination
FROM: Anne Warner, RLA
PDSD Landscape/Native Plant Preservation Section

PROJECT: Tractor Supply Co
ACTIVITY NO: DP22-0072 v2
Address: 9848 E OLD VAIL RD
Zoning: I-1
Existing Use: undisturbed Sonoran desert
Proposed Use: Commercial use

TRANSMITTAL DATE: August 24, 2022
DUE DATE: July 29, 2022
COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Landscape Review Section comments were addressed.
This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.
1. This comment was not adequately addressed - Please remove the RFS from the NPP inventory and protect in place, otherwise provide documentation from David Marhefka that allows removal.
2. Provide a detail to show tree planting with root barrier adjacent to walkways.
3. Engineer Comment – Curb inlets have been identified, but they don’t work the grading plan. Please revise grading plan to maximize water harvesting. Engineer Comment – the water harvesting basin does not account for 2” of d.g. Basin depth should be a minimum of 8”.Adherence to the Low Impact Development Standards outlined in Section 5 of the PCRFCD Design Standards for Stormwater Detention and Retention is required and shall work in conjunction with the Commercial Rainwater Harvesting design. https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Rules%20and%20Procedures/Stormwater%20Detention-Retention/dssdr-manual-board-version-201511.pdf

COT edits - https://www.tucsonaz.gov/files/pdsd/codes/Detention_Retention_Manual_Tech_Standards_Amemdments.pdf

6. Engineer Comment Maximizing water harvesting has not been achieved with this grading plan. Most water is directed to the detention basin, which doesn’t meet the Water Harvesting requirements - Grading, hydrology, and landscape plans must be integrated to make maximum use of site storm water runoff for supplemental on-site irrigation purposes. The water harvesting and grading plans shall indicate use of all runoff, from individual catch basins around single trees to basins accepting flow from an entire vehicular use area or roof area. UDC 7.6.6.C.2. The landscape, water harvesting, and grading plans must match.
6. Please identify the project monitor prior to any grading activities, UDC 7.7.5. On-monitoring of all aspects of site clearing, grading, plant protection, preservation, salvage, and mitigation must be provided during project construction at the expense of the developer for all residential development that is over five acres and for all commercial and industrial development that is over one acre . The monitoring must be performed by an individual who is qualified in arid lands native plant resource identification and protection as specified in UDC Section 7.7.4.D, Professional Expertise. The monitor must provide periodic progress reports to the developer outlining the status of work accomplished and any problems encountered. A copy of these reports must be submitted to the PDSD for the project file.
RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package

YOUR NEXT STEPS: Submit documents to the Filedrop
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
Select "Existing Application"
1) Comment Response Letter (your response to
the reviewer's Requires changes comments)
2) Plan Set (or individual sheets)
3) Any other items requested by review staff

If you have any questions, please contact me at anne.warner@tucsonaz.gov
08/24/2022 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. Revise the plans and all documents to show all landscape areas depressed between 6 and 9 inches. This should be reflected in all plans and documents. The surface of the depressed areas will be counted to the top of any ground cover.
2. As previously commented, show how water harvesting will be maximized. UDC 7.6.6.2 requires the use of all runoff to the maximum extent possible. Slopes shown on the grading plan are not consistent and don't show maximum water harvesting.
3. Revise the solid waste container enclosure to provide bollards at the sides of the enclosure as well as the rear in accordance with the technical standard.

Loren Makus
loren.makus@tucsonaz.gov
08/25/2022 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Email from: COTDSDPermits
to: Tri Miller
cc: Anthony Boone
08/25/2022

REVIEW NOTICE

Returned for Corrections: DP22-0072
Site/Grading/Swppp - Tractor Supply Company. (Job number 5158b) 9848 E OLD VAIL Road

FEE BALANCE: $ 165.00
(extra 2 hours review time by Fire Dept)
ONLINE PAYMENTS
** If the online amount doesn't match "Fee Balance" above, check again in a few hours **
https://www.tucsonaz.gov/pdsd/fees
1- Click on: Pay Planning & Permit Fees
2- Enter Permit Nbr, example: dp20-0000
(not case-sensitive but a hyphen-dash- is needed)
3- Business/Individual Name: Leave this blank
4- "Continue"
5- In the Pay column - check the boxes

YOUR NEXT STEPS
1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews section - click on REVIEW DETAILS
- Documents section - click on VIEW

2. Title your THIRD submittal documents accordingly, example: 3_Comment Response Letter

3. UPLOAD documents to Filedrop:
- Comment Response Letter (your response to REQUIRES CHANGE comments)
- Plan Set (all pages, full set, even if no changes were made)
- Any other documents requested by review staff

FILEDROP
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
- "Existing Application"
- "Permit Number" field: enter the number (and any notes for our staff)


Sharon Beasley, Certified Permit Technician

City of Tucson, Planning & Development Services Dept.
Email: COTDSDpermits@TucsonAz.gov
(for development packages, land splits, Thursday Presubmittal meetings)
Email: PDSDinquiries@TucsonAz.gov
(for building permits)