Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP21-0354
Review Name: DEV PKG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/05/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 01/05/2022 | SBEASLE1 | ENGINEERING | REVIEW | Approved | Engineering was approved by Loren Makus during the OK to Submit. |
| 01/21/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Beverly Reservoir – Solar Canopies Development Package (1st Review) DP21-0354 TRANSMITTAL DATE: January 21, 2022 DUE DATE: January 25, 2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is December 27, 2022. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 – Provide the development package case number, DP21-0354, adjacent to the title block on all sheets. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 2. COMMENT: 2-06.4.7.A.4 – The use of the property shown under ZONING AND LAND USE INFORMATION is not correct and should be list as a UTILITY DISTRIBUTION SYSTEM SUBJECT TO USE SPECIFIC STANDARDS 4.9.11.A.1, .2, .5, .8, .9, .11 AS PERMITED AS A Zoning Examiner Special Exception Procedure, Section 3.4.3. 3. COMMENT: 2-06.4.7.A.6.a – Any modification to this distribution site is required to go through the Special Exception (SE) Procedure, Section 3.4.3. The procedure must be approved prior to approval of the DP. The SE application can be found at: https://www.tucsonaz.gov/files/pdsd/forms/ZESE_Application.pdf, and the contact for this process Peter McLaughlin – Peter.McLaughlin@tucsonaz.gov. Once this process is approved provide the SE case number adjacent to the title block on all sheets and provide a general note stating the case number, date of approval, what was approved and if applicable any conditions of approval. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 4. COMMENT: 2-06.4.9.O – Per UDC Article 6.6.3.B Detached accessory buildings are not permitted in the buildable area extending the full width of the lot between the principal building and the front street lot line. The proposed shade structures shown along Beverly may not be located west of the reservoir. A Board of Adjustment for Variance is required. 5. COMMENT: 2-06.4.9.O – It does not appear that proposed canopy C meets perimeter yard setbacks to the east property line. As no section was provided for canopy C Zoning use the section provided for canopy B with a height of 22’-8” which requires a perimeter yard setback of 17’-0”. At a minimum a neighbor’s setback waiver is required. 6. COMMENT: 2-06.4.9.Q - Per UDC Article 6.6.3.C Accessory structures shall not exceed 12 feet in height, unless attached to a principal structure. A Board of Adjustment for Variance is required. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 02/24/2022 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 03/14/2022 | AWARNER1 | LANDSCAPE | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Planning and Development Services Department, Plans Coordination FROM: Anne Warner, RLA PDSD Landscape/Native Plant Preservation Section PROJECT: Tucson Water Beverly Reservoir ACTIVITY NO: DP21-0254 Address: 1237/1255 S. Beverly Ave Zoning: R-1 Existing Use: Tucson Water Reservoir Proposed Use: no change TRANSMITTAL DATE: March 14, 2022 DUE DATE: January 25, 2022 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Landscape Review Section comments were addressed. This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting. 1. Existing plants need to be drawn to scale. If trees are to be removed, it is recommended that they be replaced to continue to provide some visual relief to the neighborhood. 2. Ensure that Zoning and Engineering comments are addressed prior to landscape section approval. 3. The Unified Development Code (UDC) requires all new development or an expansion of less than 25% of an existing development submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4. and Administrative Manual 2-10. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package YOUR NEXT STEPS: Submit documents to the Filedrop https://docs.tucsonaz.gov/Forms/tucsonpermitapp Select "Existing Application" 1) Comment Response Letter (your response to the reviewer's Requires changes comments) 2) Plan Set (or individual sheets) 3) Any other items requested by review staff If you have any questions, please contact me at anne.warner@tucsonaz.gov |
| 03/14/2022 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Email from: COTDSDPermits To: Garrett Murphy cc: Mandi Leatherland Mon 3/14/2022 3:15 PM Returned for Corrections: DP21-0354 DESCRIPTION: Site: City of Tucson, Beverly Reservoir. 485.8 kW DC photovoltaic solar canopy installation. 1255 S BEVERLY AV Fee Balance: $0 (zero) Thank you for the payment. YOUR NEXT STEPS 1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab to see different sections - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW 2. UPLOAD A RESUBMITTAL and include: 1) Comment Response Letter (your response to REQUIRES CHANGE comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff Please title your SECOND submittal documents according to this example: 2_Comment Response Letter FILEDROP: https://docs.tucsonaz.gov/Forms/tucsonpermitapp - Select "Existing Application" - In the "Permit Number" field, enter the number and, if applicable, any notes for our staff - Select "PLANS" for all documents for quicker downloading of your documents on our end Thank you. Sharon Beasley, Building Permit Specialist City of Tucson, Planning and Development Services Email: COTDSDpermits@TucsonAz.gov |