Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP21-0340
Parcel: 10704002C

Address:
1401 W GLENN ST

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP21-0340
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/29/2022 SBEASLE1 START PLANS SUBMITTED Completed
05/06/2022 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Stockett Tile & Granite
Development Package (2nd Review)
DP21-0340

TRANSMITTAL DATE: May 6, 2022

DUE DATE: May 23, 2022

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is December 12, 2022.

1. This comment was not fully addressed, Provide the Section, township, and range; and label the section corners with the applicable section numbers. COMMENT: 2-06.4.4.C - Section, township, and range; section corners; north arrow; and the scale will be labeled on the location map.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2. This comment was not fully addressed. Per UDC TABLE 4.8-5: PERMITTED USES – INDUSTRIAL ZONES, Industrial Land Use Group With Land Use Class/Type: General Manufacturing in the I-1 Zone is submit to Use Specific Standards 4.9.5.C.2, .6, .7, & .8 and 4.9.13.Q. Provide these standards within the Site Date Table. COMMENT: 2-06.4.7.A.4 – The current and proposed uses listed in the Site Data Table are not uses classified per the UDC. Provide the uses based on the UDC and if applicable provide any Use Specific Standards.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

3. Zoning acknowledges the submitted covenant but this covenant will need to be recorded, provide a copy of the recordation information with the next submittal. COMMENT: 2-06.4.9.A – As this site is made up of two (2) parcels, 107-07-005H & 107-04-002C, a lot combination is required. Provide a copy of the approved Pima County Combo Request from with your next submittal.

4. COMMENT: 2-06.4.9.H.5 – Per UDC Article 7.4.6.F.2.a.(1) an access lane must be setback 1’-0” from an open structure. Show the required 1’-0” setback from the canopies called out under Keynote 13, clearly show the access land width, and clearly demonstrate that the required 2’ setback to the perimeter fence is met, see UDC Article 7.4.6.F.2.b.

5. This comment was not addressed. Demonstrate how vehicles will be prevented from damaging the vegetation along the east side of the access lane that provided access to this site. COMMENT: 2-06.4.9.H.5 – Per UDC Article 7.4.6.H.1 Barriers, such as post barricades or wheel stop curbing, are required in a vehicular use area to prevent vehicles from extending beyond the property lines , to prevent cars from damaging adjacent landscaping, walls, or buildings, overhanging adjacent sidewalk areas, and/or driving onto unimproved portions of the site. Clearly demonstrate that this requirement is met throughout the site.

6. COMMENT: 2-06.4.9.H.5 – Provide an access lane width dimension from the evap coolers shown along the east side of the proposed building to ramp shown along the west side of the existing building. Show the required 2’-0” setback from the evap coolers to the access lane and if there is a rail or some other type of vertical obstruction along the ramp so the required 2’-0” setback to the access lane, see UDC Article 7.4.6.F.2.b

7. This comment was not addressed correct. Vehicle parking is based on the primary use, General Manufacturing. The required number should be 18 spaces. Remove the reference to Office from the calculation and base the calculation on the gross floor area. COMMENT: 2-06.4.9.H.5.a – The required number of vehicle parking spaces is not correct. Per UDC Article 7.4.3.G When the calculation of required motor vehicle and bicycle parking spaces results in a fractional number, a fraction of one-half or more is adjusted to the next higher whole number, and a fraction of less than one-half is adjusted to the next lower whole number.

8. This comment was not addressed correctly. Provide a bicycle parking spaces calculation the provides the number required and provided. The bicycle parking provided does not meet the requirements for the required long-term bicycle parking. As 2 long-term bicycle parking spaces are required provide a detail that demonstrates how the requirements of UDC Article 7.4.9.B.1, B.2 & D are met. If you wish to leave the short-term racks as shown on the plan provide a detail that demonstrates how the requirements of UDC Articles 7.4.9.B.1, B.2 & C, are met. COMMENT: 2-06.4.9.H.5.d – Until comment 6 has been addressed short- & long-term bicycle parking requirements cannot be verified. If short- or long-term bicycle parking is required clearly show the location on the plan and provide a detail.

9. COMMENT: 2-06.4.9.R – Per TSM Section 7-01.3.3.B.1 & 7-01.4.1.B provide a 4’-0” wide pedestrian refuge area along the north side of the proposed building.

If you have any questions about this transmittal, please contact Nicholas Ross at Nocholas.Ross@tucsonaz.gov.

To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
05/18/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
05/24/2022 JPEELDA1 FIRE REVIEW Approved
06/01/2022 AWARNER1 LANDSCAPE REVIEW Reqs Change CDRC TRANSMITTAL
TO: Planning and Development Services Department, Plans Coordination
FROM: Anne Warner, RLA
PDSD Landscape/Native Plant Preservation Section

PROJECT: Stockett Tile and Granite
ACTIVITY NO: DP21-0340
Parcel: 107-04-002C
Zoning: I-1
Existing Use: General Manufacturing
Proposed Use: General Manufacturing

TRANSMITTAL DATE: June 1, 2022
DUE DATE: May 23, 2022
COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Landscape Review Section comments were addressed.
This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.
1. Landscape, irrigation and commercial water harvesting plans are required.
7.6.2.B.2 Buildings 10,000 Square Feet or Less
On sites where the gross floor area of the existing building (s) is 10,000 square feet or less, expansions in square footage of land area, floor area , lot coverage , or vehicular use area as follows.
a. If the expansion is less than 50%, the standards of this section apply only to the proposed expansion. Existing development on the site is subject to the zoning standards in effect at the time the existing development received zoning approval.
b. If the expansion is 50% or greater or if expansions as of February 15, 1991, cumulatively result in a 50% or greater expansion in land area, floor area , lot coverage , or vehicular use area , the standards of this section apply to the entire site
2. General Note - UDC 2-10.4.1 Identification and Descriptive Data - All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.

3. General Note - Ensure that Zoning and Engineering comments are addressed prior to landscape section approval.

4. Preparation of the landscape plan shall adhere to UDC 7.6.4. and Administrative Manual 2-10.

5. Please provide all landscape calculations on the landscape plan, including required trees for the parking areas, Admin. Manual 2-10-4.2.A.2.c and landscape borders, UDC Technical Standards 2-10.4.2.f & g.

6. Placing trees along the edge of a parking area or at the ends of parking row does not meet the intent of the UDC. All spaces within 40' of a tree is only one of the requirements, and it is required to meet all. The intent is to provide as much shade on the asphalt as possible, and the requirement is 1 tree per 4 parking spaces; trees are expected to be placed within the parking area itself to mitigate the heat and glare radiated by the built environment, UDC 7.6.1.A.3. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.B.1.a., UDC Technical Standards Manual 5-01-.3.2

7. An irrigation plan and specifications are required per UDC Administration Manual 2-10.4.2.C and Technical Standards Manual Section 4-01.4.2, Irrigation Standards.

8. Please indicate the installation of a private submeter if a separate irrigation meter is not being provided. UDC Technical Standards 4-01.6.1.A.1.

9. Please add a detail to show depressed landscape areas or indicate with notes.

10. Provide a detail to show tree planting with root barrier adjacent to walkways.

11. A Commercial Rainwater Harvesting plan is required. UDC Technical Standards Manual - Section 4-01.0.0. and Section 5-01.0.0 Landscaping and Screening. Demonstrate how water harvesting is being maximized.

12. The grading plan and water harvesting plan do not meet the requirements of the water harvesting ordinance and technical standard. The plan doesn't show the effective use of run-off to supplement irrigation.
a. The catchment areas must provide water to the infiltration areas. Revise the grading to direct runoff to the landscape infiltration areas to the maximum extent possible.
b. Catchment areas in the water harvesting table can only count the areas that are directed to the landscape infiltration areas.
c. Clearly show the areas in each catchment area and the areas of effective infiltration and water harvesting. All landscape areas should be included within infiltration areas.
d. UDC section 7.6.6.C requires the use of all runoff to supplement irrigation. Show how this is attained.
e. Provide a planting inventory or some other mechanism so we can confirm the canopy areas for each water harvesting infiltration area. Ensure all on-site landscape areas are accounted in the canopy area.
f. Show rooftop drainage patterns and show how they are incorporated into the water harvesting calculations.
g. Water harvesting areas should be depressed between 6 and 9 inches. These areas can be counted toward first flush retention requirements.

13. Identify curb inlets/splash pads to landscape areas on water harvesting or landscape plans.

16. Provide a maintenance schedule for the landscape and irrigation for this project. UDC 2-10-4.2.A.4., please be specific.

17. Adherence to the Low Impact Development Standards outlined in Section 5 of the PCRFCD Design Standards for Stormwater Detention and Retention is required and shall work in conjunction with the Commercial Rainwater Harvesting design. https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Rules%20and%20Procedures/Stormwater%20Detention-Retention/dssdr-manual-board-version-201511.pdf

COT edits - https://www.tucsonaz.gov/files/pdsd/codes/Detention_Retention_Manual_Tech_Standards_Amemdments.pdf

18. Grading, hydrology, and landscape plans must be integrated to make maximum use of site storm water runoff for supplemental on-site irrigation purposes. The landscape plan shall indicate use of all runoff, from individual catch basins around single trees to basins accepting flow from an entire vehicular use area or roof area. UDC 7.6.6.C.2. The landscape, water harvesting, and grading plans must match.

17. Retention/detention basins should be designed naturally and organically, whenever practicable. Square and rectangles are not organic shapes.

18. The basin floor requires something other than bare dirt, hydroseed or rock larger than 4" is acceptable.


RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package

YOUR NEXT STEPS: Submit documents to the Filedrop
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
Select "Existing Application"
1) Comment Response Letter (your response to
the reviewer's Requires changes comments)
2) Plan Set (or individual sheets)
3) Any other items requested by review staff

If you have any questions, please contact me at anne.warner@tucsonaz.gov
07/05/2022 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change
07/05/2022 EHAMBLI1 ENGINEERING REVIEW Needs Review