Permit Review Detail
Review Status: Completed
Review Details: TENTATIVE PLAT REVIEW
Permit Number - DP21-0326
Review Name: TENTATIVE PLAT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/23/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 04/11/2022 | DSTIFFE1 | COT NON-DSD | TRAFFIC | Approved | No Comments- Approved |
| 04/14/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Tentative Plat Package for 4253 E Flower Street Development Package (2nd Review) DP21-0326 TRANSMITTAL DATE: April 14, 2022 DUE DATE: April 21, 2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is November 28, 2022. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A.8 - For development package documents provide: 1. This comment was not addressed. Elisa’s email does not state that the lot coverage is for the entire site. There is nothing in the UDC that allows for site coverage for a tentative plat that is using the development standards listed under UDC Table 6.3-2.A. If you cannot meet lot coverage for each proposed lot either a Board of Adjustment for Variance is required or you can develop this as an FLD. COMMENT: 2-06.4.7.A.8.b – As you are proposing individual parcels demonstrate that each parcel does not exceed the allowed lot coverage. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2. This comment was not addressed. Per UDC Table 6.3-2.A Nonres Use to Res Zone the required perimeter yard setback is 10’ or ¾(H), greater of the two. Show perimeter yard setback dimensions to all proposed and existing property lines. COMMENT: 2-06.4.9.O – As you are proposing numerous parcels demonstrate the all buildings, existing and proposed meet perimeter yard setbacks to the propose parcel lines. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 04/19/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 04/27/2022 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | 1. See previous comment 1 - Still don't see the mailing and email addresses and phone number of the firm who prepared the report. It all should be provided on the cover sheet as per Admin Manual section 2-06.4.1 Admin Manual section 2-06.4.1 The name, mailing and email addresses, and phone number of the primary property owner of the site, the developer of the project, registrant(s), and other person(s), firm(s), or organization(s) that prepared the development package documents shall be provided on the right half of the cover sheet. The applicable registration or license number shall be provided if prepared by or with the assistance of a registered professional, such as a surveyor, architect, landscape architect, or engineer. All sealing shall be consistent with Arizona Board of Technical Registration guidelines. 2. Provide complete discussion, calculations and exhibits to establish accomplishment of first flush requirements. 3. For calculations supporting first-flush retention provide a table accounting for the entire project area and applicable volumes. See the examples on pages 12 and 13 of the manual. 4. Provide an exhibit showing all developed watersheds and associated retention areas. Impervious, disturbed, and non-contributing areas must be shown with measurements. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
| 05/09/2022 | AWARNER1 | LANDSCAPE | REVIEW | Approved | |
| 06/16/2022 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Email from: COTDSDPermits to: lisa bowers Thu 6/16/2022 11:16 AM REVIEW NOTICE Returned for Corrections: DP21-0326 Project Description: Tentative Plat - 4253 East Flower Street. Fee Balance: $0 (zero) Thank you for the payment. YOUR NEXT STEPS 1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW 2. Title your THIRD submittal documents accordingly, example: 3_Comment Response Letter 3. UPLOAD A RESUBMITTAL to Filedrop: - Comment Response Letter (your response to REQUIRES CHANGE comments) - Plan Set (all pages, full set, even if no changes were made) - Any other documents requested by review staff - FILEDROP https://docs.tucsonaz.gov/Forms/tucsonpermitapp - "Existing Application" - "Permit Number" field: enter the number (and any notes for our staff) - Select "PLANS" for all documents Sharon Beasley, Certified Building Technician City of Tucson, Planning & Development Services Dept. Email: COTDSDpermits@TucsonAz.gov (for development packages, land splits, Thursday Presubmittal meetings) Email: PDSDinquiries@TucsonAz.gov (for building permits) |
| 06/16/2022 | SBEASLE1 | PIMA COUNTY - ADDRESSING | PIMA COUNTY - ADDRESSING | Needs Review |