Permit Number: DP21-0323
Parcel: 136070270

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP21-0323
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/02/2022 SBLOOD1 ENGINEERING REVIEW Reqs Change This project is within a mapped flood hazard area and requires a Floodplain Use Permit (FUP.)
Please start a new FUP at our permit application web page: https://docs.tucsonaz.gov/Forms/tucsonpermitapp.
Instructions:
1. Is this for a new or existing activity application? - Please select New Application.

2. Submission Type - Select Floodplain Use Permit.

3. Project Name - Enter a name for your project.

4. Type of Permit - Select Commercial or Residential (Residential is for work on single family residences and duplexes.)

5. Select Street Name from the list. You can type the first two letters or number to get closer to your choice in the list. Then select the rest of the address in the boxes provided.

6. Description of Work - Enter in Floodplain Use Permit for…and then put a description of the work being done or reference the building permit number associated with this floodplain use permit.

7. Complete the Applicant Info. (Note APA# is for applicants with an advance payment account. Leave blank is you do not have an APA account.

8. Complete the Contractor, Owner and Architect/Engineer sections as applicable.

9. Supporting Documentation Upload - Provide a complete cost estimate for the project unless it is for a new build/separate structure. You may also provide additional documents you think will be helpful.

10. Sign the application and submit.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
03/03/2022 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Email from: COTDSDPermits
To: Ryan Stucki
cc: Charlie Sulik
Thu 3/3/2022 10:29 AM

REVIEW NOTICE
Returned for Corrections: DP21-0323

DESCRIPTION: SITE - Well Site E-004A SCADA Upgrade. Tucson Water. 9102 E PALM TREE DR

Fee Balance: $0 (zero) Thank you for the payment.

YOUR NEXT STEPS
1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab to see different sections
- Reviews section - click on REVIEW DETAILS
- Documents section - click on VIEW

2. UPLOAD A RESUBMITTAL and include:
1) Comment Response Letter (your response to REQUIRES CHANGE comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

Please title your SECOND submittal documents according to this example: 2_Comment Response Letter

FILEDROP:
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
- Select "Existing Application"
- In the "Permit Number" field, enter the number and, if applicable, any notes for our staff
- Select "PLANS" for all documents for quicker downloading of your documents on our end

Thank you.
Sharon Beasley, Building Permit Specialist

City of Tucson, Planning and Development Services
Email: COTDSDpermits@TucsonAz.gov
12/06/2021 SBEASLE1 START PLANS SUBMITTED Completed
12/16/2021 JVINCEN1 FIRE REVIEW Approved
12/24/2021 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Well Site E-004A – SCADA Upgrade
Development Package (1st Review)
DP21-0323

TRANSMITTAL DATE: December 24, 2021

DUE DATE: December 28, 2021

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is November 28, 2022.

CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.3 – Provide the development package case number, DP21-0323, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2. COMMENT: 2-06.4.7.A.4 – Revise General Site Note 3 to include “Subject to Zoning Examiner Special Exception Procedure, Section 3.4.3.”

3. COMMENT: 2-06.4.7.A.6.a – Once the required Special Exception is approved provide the case number adjacent to the title block on all sheets. Provide a General Note stating the case number, date of approval and if applicable any conditions of approval.

4. COMMENT: 2-06.4.7.A.6.a – It does not appear that the site meets the requirements of UDC Articles 4.9.11.A.1, .2, .5, & .9.

5. COMMENT: 2-06.4.7.A.6.a –The requirements of UDC Articles 4.9.11.A.8 will need to be reviewed and approved prior to approval of this DP.

If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov.

To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package