Permit Number: DP21-0316
Parcel: 140260390

Address:
2730 E DREXEL RD

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP21-0316
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/18/2022 SBEASLE1 START PLANS SUBMITTED Completed
03/10/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Comment not resolved. Several sections of the building sewer show a linear distance between cleanouts that is in excess of 100-feet (e.g. 108,101, 164, 116 -feet). The maximum distance between cleanouts is to be no greater than 100-feet of developed length. The developed length of pipe is the vertical distance from the opening of the cleanout to the invert plus the horizontal distance to the "…next drainage fitting providing access for cleaning." Reference: Section 708.1.2, IPC 2018. [Initial comment: Provide cleanouts in the building sewer at intervals not exceeding 100 feet of developed pipe length. Reference Section 708.1.2, IPC 2018.]
03/11/2022 STEVE SHIELDS ZONING REVIEW Reqs Change ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
T21CM09775 & T21CM09776
2730 E Drexel Rd – P-I/I-1
General Manufacturing (2nd Review) – DP21-0316

TRANSMITTAL: March 11, 2022
This site is located in the P-I/I-1 zones (UDC 4.7.28/4.7.29). General Manufacturing is a permitted use in this zone (Table 4.8-5) subject to Use Specific Standards P-1 4.9.5.C.2, .4, .5, .6, & .8 and 4.9.13.Q / I-1 4.9.5.C.2, .6, .7, & .8 and 4.9.13.Q.

Provide a detail comment response letter with the next submittal.

1. Zoning has reviewed the building plans for compliance with DP21-0316 and it appears that the building plans match the DP but until the DP is approved Zoning cannot approve the building plans.

2. Any DP21-0316 sheets provided in the building plan set, with the exception of utility plans, either need to be the stamped approved DP sheets, marked as for reference only or removed from the building set.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
03/21/2022 SBEASLE1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Approved See the document in the "Documents" section of PRO titled: "TAA letter of approval, 03.16.22"
03/22/2022 JPEELDA1 COT NON-DSD FIRE Reqs Change Show a defined fire department aerial access and notes to state that the parking next to aerial access and the building shall never get an awning/solar structure.

Questions:
Jennifer Peel-Davis
Jennifer.Peel-Davis@Tucsonaz.gov
520-837-7033
Fire Plans Examiner
03/28/2022 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Approved Approved. See the Documents section of PRO for the following:
TEP Facilities Map 03.25.22,
TEP facilities overall utility plan 03.25.22,
TEP letter of approval 03.25.22.
04/05/2022 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Email from: COTDSDPermits
To: Jennifer K.
Tue 4/5/2022 2:46 PM

REVIEW NOTICE
Returned for Corrections: DP21-0316

DESCRIPTION: Site/Grading/Swppp - Drexel Commerce Center. New industrial park. Shell buildings and associated site work.

Fee Balance: $0 (zero) Thank you for the payment.

YOUR NEXT STEPS
1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab to see different sections
- Reviews section - click on REVIEW DETAILS
- Documents section - click on VIEW

2. Title your THIRD submittal documents accordingly, example: 3_Comment Response Letter

3. UPLOAD A RESUBMITTAL to Filedrop:
1) Comment Response Letter (your response to REQUIRES CHANGE comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

- FILEDROP:
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
- "Existing Application"
- "Permit Number" field: enter the number (and any notes for our staff)
- Select "PLANS" for all documents

Thank you.
Sharon Beasley, Certified Permit Specialist

City of Tucson, Planning and Development Services
Email: COTDSDpermits@TucsonAz.gov
04/05/2022 SBEASLE1 ENGINEERING REVIEW Reqs Change See two documents in PRO's "Documents" section: "Engineering review comments from Joseph Godoy, Pima Co, 2nd submittal, 04.05.22" and "Engineering (Drainage) review comments from Joseph Godoy, Pima Co, 2nd submittal, 04.05.22"
04/05/2022 DSTIFFE1 COT NON-DSD TRAFFIC Approved No Comments

David Stiffey
David.Stiffey@tucsonaz.gov