Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP21-0316
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/18/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
03/10/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Comment not resolved. Several sections of the building sewer show a linear distance between cleanouts that is in excess of 100-feet (e.g. 108,101, 164, 116 -feet). The maximum distance between cleanouts is to be no greater than 100-feet of developed length. The developed length of pipe is the vertical distance from the opening of the cleanout to the invert plus the horizontal distance to the "…next drainage fitting providing access for cleaning." Reference: Section 708.1.2, IPC 2018. [Initial comment: Provide cleanouts in the building sewer at intervals not exceeding 100 feet of developed pipe length. Reference Section 708.1.2, IPC 2018.] |
03/11/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM09775 & T21CM09776 2730 E Drexel Rd – P-I/I-1 General Manufacturing (2nd Review) – DP21-0316 TRANSMITTAL: March 11, 2022 This site is located in the P-I/I-1 zones (UDC 4.7.28/4.7.29). General Manufacturing is a permitted use in this zone (Table 4.8-5) subject to Use Specific Standards P-1 4.9.5.C.2, .4, .5, .6, & .8 and 4.9.13.Q / I-1 4.9.5.C.2, .6, .7, & .8 and 4.9.13.Q. Provide a detail comment response letter with the next submittal. 1. Zoning has reviewed the building plans for compliance with DP21-0316 and it appears that the building plans match the DP but until the DP is approved Zoning cannot approve the building plans. 2. Any DP21-0316 sheets provided in the building plan set, with the exception of utility plans, either need to be the stamped approved DP sheets, marked as for reference only or removed from the building set. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
03/21/2022 | SBEASLE1 | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Approved | See the document in the "Documents" section of PRO titled: "TAA letter of approval, 03.16.22" |
03/22/2022 | JPEELDA1 | COT NON-DSD | FIRE | Reqs Change | Show a defined fire department aerial access and notes to state that the parking next to aerial access and the building shall never get an awning/solar structure. Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 Fire Plans Examiner |
03/28/2022 | SBEASLE1 | UTILITIES | TUCSON ELECTRIC POWER | Approved | Approved. See the Documents section of PRO for the following: TEP Facilities Map 03.25.22, TEP facilities overall utility plan 03.25.22, TEP letter of approval 03.25.22. |
04/05/2022 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Email from: COTDSDPermits To: Jennifer K. Tue 4/5/2022 2:46 PM REVIEW NOTICE Returned for Corrections: DP21-0316 DESCRIPTION: Site/Grading/Swppp - Drexel Commerce Center. New industrial park. Shell buildings and associated site work. Fee Balance: $0 (zero) Thank you for the payment. YOUR NEXT STEPS 1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab to see different sections - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW 2. Title your THIRD submittal documents accordingly, example: 3_Comment Response Letter 3. UPLOAD A RESUBMITTAL to Filedrop: 1) Comment Response Letter (your response to REQUIRES CHANGE comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff - FILEDROP: https://docs.tucsonaz.gov/Forms/tucsonpermitapp - "Existing Application" - "Permit Number" field: enter the number (and any notes for our staff) - Select "PLANS" for all documents Thank you. Sharon Beasley, Certified Permit Specialist City of Tucson, Planning and Development Services Email: COTDSDpermits@TucsonAz.gov |
04/05/2022 | SBEASLE1 | ENGINEERING | REVIEW | Reqs Change | See two documents in PRO's "Documents" section: "Engineering review comments from Joseph Godoy, Pima Co, 2nd submittal, 04.05.22" and "Engineering (Drainage) review comments from Joseph Godoy, Pima Co, 2nd submittal, 04.05.22" |
04/05/2022 | DSTIFFE1 | COT NON-DSD | TRAFFIC | Approved | No Comments David Stiffey David.Stiffey@tucsonaz.gov |