Permit Review Detail
Review Status: Completed
Review Details: TENTATIVE PLAT REVIEW
Permit Number - DP21-0258
Review Name: TENTATIVE PLAT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/14/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Tentative Plat at the NEC of Bilby & Jeanette Development Package (2nd Review) DP21-0258 TRANSMITTAL DATE: January 14, 2022 DUE DATE: January 20, 2022 This comment was not addressed. COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is September 23, 2021. 1. 2-06.4.1 - The name, mailing and email addresses, and phone number of the primary property owner of the site, the developer of the project, registrant(s), and other person(s), firm(s), or organization(s) that prepared the development package documents shall be provided on the right half of the cover sheet. The applicable registration or license number shall be provided if prepared by or with the assistance of a registered professional, such as a surveyor, architect, landscape architect, or engineer. All sealing shall be consistent with Arizona Board of Technical Registration guidelines. 2. 2-06.4.2.C - The number of proposed lots and common areas are to be noted. If the subdivision is a Flexible Lot Development (FLD), a condominium, or a similar type of residential subdivision utilizing special provisions of the UDC, it shall be so noted; 3. 2-06.4.4 - The project-location map to be located on the first sheet of the development package in the upper right corner, shall cover approximately one square mile, be drawn at a minimum scale of three inch equals one mile, and provide the following information. 4. 2-06.4.4.A - Show the subject property approximately centered within the one square mile area; 5. 2-06.4.4.B - Identify major streets and regional watercourses within the square mile area and all streets that abut the subject property; and, 6. 2-06.4.4.C - Section, township, and range; section corners; north arrow; and the scale will be labeled. 7. 2-06.4.7.A.2 - List the gross area of the site/subdivision by square footage and acreage 8. 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 9. 2-06.4.7.A.6.a - List additional applications and overlays, by case number (if applicable), in lower right corner of each sheet. As a general note provide the type of application processed or overlays applicable, a statement that the project meets the criteria/conditions of the additional application or overlay, the case number, date of approval, what was approved, and the conditions of approval, if any. As Bilby Rd is designated as a Collector on the COT MS&R map provide a general note stating “THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.4 MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R)” 10. 2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. If the property is being rezoned, use those boundaries and classifications. The basis for this requirement is that some zoning requirements on a project are based on the zoning classification of adjacent property. Also, in some instances, each zone has to be taken into consideration on property that is split by two or more zoning classifications, as each may have different requirements. Provide the zoning for the parcels south of Bilby and west of Jeanette on the plan. 11. 2-06.4.9.J - If street dedication is not required or proposed and the project site is adjacent to a Major Street or Route, draw the Major Street right-of-way lines for those streets. (Add the MS&R future sidewalk, right-of-way lines, sight visibility triangles, etc.) 12. 2-06.4.9.O - All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown. The street perimeter yard setbacks shown are not correct. The street perimeter yard setbacks for Lots 1-5 are 20’ or 1-1/2 the proposed wall (H), measured from the street property line, whichever is greater. For Lot 6 the street perimeter yard is 21’ or the height of the proposed exterior building wall, greater of the two, for Bilby this setback is measured from the back of future curb, for Jeanette it is measured from the outside edge of the nearest adjacent travel lane. 13. 2-06.4.9.O - All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown. The interior perimeter yard setbacks shown as “6.00’” should include or 2/3 the height of the proposed exterior building wall, greater of the two. 14. 2-06.4.9.V - For gang mailboxes indicate location to assure there are no conflicts with other requirements, such as pedestrian accessibility, utilities, and landscaping. 15. Remove the final plat “DEDIATION”, “APPROVAL” & “ASSURANCES” blocks from the tentative plat. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 01/20/2022 | SBEASLE1 | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Reqs Change | See the letter in the "Documents" section of PRO: "Tucson Airport review comments, second submittal" |
| 03/02/2022 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Email from: COTDSDPermits To: Abel cc: Jeffrey Stanley Wed 3/2/2022 3:43 PM REVIEW NOTICE Returned for Corrections: DP21-0258 DESCRIPTION: Tentative Plat - The Tree Estates, Lots 1 thru 6. 1131 E BILBY RD Fee Balance: $0 (zero) Thank you for the payment. YOUR NEXT STEPS 1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab to see different sections - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW 2. UPLOAD A RESUBMITTAL and include: 1) Comment Response Letter (your response to REQUIRES CHANGE comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff Please title your THIRD submittal documents according to this example: 3_Comment Response Letter FILEDROP: https://docs.tucsonaz.gov/Forms/tucsonpermitapp - Select "Existing Application" - In the "Permit Number" field, enter the number and, if applicable, any notes for our staff - Select "PLANS" for all documents for quicker downloading of your documents on our end Thank you. Sharon Beasley, Building Permit Specialist City of Tucson, Planning and Development Services Email: COTDSDpermits@TucsonAz.gov |
| 03/02/2022 | SBEASLE1 | ENGINEERING | REVIEW | Needs Review | |
| 12/23/2021 | SBEASLE1 | PIMA COUNTY - ADDRESSING | PIMA COUNTY - ADDRESSING | Approved | Email from: <Addressing@pima.gov> To: CDRC Thu 12/23/2021 3:56 PM The Tree Estates, 2nd Submittal Review: DP21-0258 is Approved by Pima County Addressing Thank you, Robin Freiman, Addressing Official |
| 12/23/2021 | SBEASLE1 | START | PLANS SUBMITTED | Completed |