Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP21-0252
Review Name: DEV PKG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/12/2021 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 11/12/2021 | SBEASLE1 | ENGINEERING | REVIEW | Approved | Engineering was approved by Loren Makus during the first OK to Submit. |
| 11/18/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: 8316 E Broadway Blvd – Covered Parking W/Solar Development Package (1st Review) DP21-0252 TRANSMITTAL DATE: May 11, 2021 DUE DATE: May 11, 2021 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is November 08, 2022. 2-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS 1. COMMENT: 2-06.2.4 – The development package is designed to allow for concurrent review of any site related reviews. That said, remove all building code references from the DP and remove sheet E3B as the electrical will not be reviewed under this DP. 2-06.3.0 FORMAT REQUIREMENTS 2. COMMENT: 2-06.3.2 – All mapped data shall be drawn at an engineering scale having no more than 50 feet to the inch. 3. COMMENT: 2-06.3.12 – The Index of Drawings does not match what was submitted. CONTENT REQUIREMENTS 4. COMMENT: 2-06.4.2.D - The page number and the total number of pages in the package (i.e., sheet xx of xx) shall be provided within the title block. 5. 6. COMMENT: 2-06.4.3 – Provide the development package case number, DP21-0 , adjacent to the title block on all sheets. 7. COMMENT: 2-06.4.4 – The required project-location map to be located on the first sheet of the development package in the upper right corner, shall cover approximately one square mile, be drawn at a minimum scale of three-inch equals one mile. 8. COMMENT: 2-06.4.4.C – The section, township, and range; section corners shall be labeled on the location map. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 9. COMMENT: 2-06.4.7.A.1 – As a general note list the existing zoning of the site. 10. COMMENT: 2-06.4.7.A.2 - As a general note list the gross area of the site/subdivision by square footage and acreage. 11. COMMENT: 2-06.4.7.A.4 - As a general note identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 12. COMMENT: 2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries 13. COMMENT: 2-06.4.9.Q – Provide the square footage and the height of each commercial and the specific use proposed within the footprint of the building(s), this includes the proposed covered parking structure. 14. COMMENT: Remove the aerial photo from the plan. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 12/29/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 12/31/2021 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Email from: COTDSDPermits To: J. Potkonjak Fri 12/31/2021 3:48 PM REVIEW NOTICE Returned for Corrections: DP21-0252 DESCRIPTION: SITE: Rincon Wells Fargo. Solar photovoltaic carport canopy in back parking lot. 8315 E BROADWAY BL FEE BALANCE: $ 346.50 Please pay at a minimum, the REVIEW category fees. A payment is required before your next submittal. ONLINE PAYMENT If amount doesn't match "Fees Due", check back in a few hours https://www.tucsonaz.gov/pdsd/fees 1- Click on: Pay Planning & Permit Fees 2- Enter Permit Nbr, example: dp20-0000 (not case-sensitive but a hyphen-dash- is needed) 3- Business/Individual Name: Leave this field blank 4- "Continue" 5- In the Pay column - check the boxes 6- "Continue" YOUR NEXT STEPS 1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab to see different sections - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW 2. UPLOAD A RESUBMITTAL and include: 1) Comment Response Letter (your response to REQUIRES CHANGE comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff Please title your SECOND submittal documents according to this example: 2_Comment Response Letter FILEDROP for your Resubmittal https://docs.tucsonaz.gov/Forms/tucsonpermitapp - Select "Existing Application" - In the "Permit Number" field, enter the number and, if applicable, any notes for our staff Thank you. Sharon Beasley, Building Permit Specialist City of Tucson, Planning and Development Services Email: COTDSDpermits@TucsonAz.gov (disregard the email response that will be sent automatically) |