Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP21-0247
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/19/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
06/14/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Comment not addressed on SP-1 or SP-3. [Initial comment: Provide the rim elevation of manhole 6677-OUTADOT and the first floor elevation of the building. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson. Reference: City of Tucson Administrative Manual, Section 2-06.4.8D and Section 107.2.1, IBC 2018.] |
06/16/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Tucson Gas Station – 1306 W Grant Rd – I-1 Development Package (3rd Review) DP21-0247 TRANSMITTAL DATE: June 16, 2022 DUE DATE: June 14, 2022 COMMENTS: Please resubmit revised drawings with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is September 13, 2021. Additional comments due to changes to the plan and additional sheets being provided. 2-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS 1. COMMENT: 2-06.2.4 – Remove sheet SP3 from the DP plan set as it is building plan related and will not be reviewed. CONTENT REQUIREMENTS 2. COMMENT: 2-06.4.2.D – As additional sheets have been added to the DP set provide an updated page number and the total number of pages in the package (i.e., sheet xx of xx) on all submitted sheets. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 3. COMMENT: 2-06.4.9.H.5.a – The vehicle parking space calculation on sheet CP! Is not correct. The plan shows 2 accessible parking spaces and the calculation shows 1. The plan shows a total of 6 space provided and the calculation shows 5. 4. COMMENT: 2-06.4.9.H.5.a – Detail 1 sheet SP2 the wheel stop location dimension is not correct, review UDC Article 7.4.6.H.3 and provide the correct dimension. Sheet C)2 shows the correct dimension. This detail also is not to scale and the dimensions provided are not correct. 5. COMMENT: 2-06.4.9.H.5.d – The bicycle parking calculation has been removed from the plan. Provide a bicycle parking space calculation that provides the number required and provided. Based on the 2 racks called out under Keynote 21 sheet SP1 the number provided should be 4, UDC Article 7.4.9.B.2.d “a single rack is designed and located to accommodate two bicycles”. 6. COMMENT: 2-06.4.9.H.5.d – Demonstrate on the plan/detail how the requirement of UDC Article 7.4.9.B.1.e is met. If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
07/29/2022 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. Revise the solid waste enclosure to meet the requirements of Technical Standard 8-01. Loren Makus loren.makus@tucsonaz.gov |
08/01/2022 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | email from: COTDSDPermits To: Alexis Gallegos Mon 8/1/2022 3:40 PM REVIEW NOTICE Returned for Corrections: DP21-0247 SITE - Tucson Gas Station, Store Retrofit. 1306 W GRANT RD Fee Balance: $0 (zero) YOUR NEXT STEPS 1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW 2. Title your FOURTH submittal documents accordingly, example: 4_Comment Response Letter 3. UPLOAD A RESUBMITTAL to Filedrop: - Comment Response Letter (your response to REQUIRES CHANGE comments) - Plan Set (all pages, full set, even if no changes were made) - Any other documents requested by review staff FILEDROP https://docs.tucsonaz.gov/Forms/tucsonpermitapp - "Existing Application" - "Permit Number" field: enter the number (and any notes for our staff) - Select "PLANS" for all documents Sharon Beasley, Certified Permit Technician City of Tucson, Planning & Development Services Dept. Email: COTDSDpermits@TucsonAz.gov (for development packages, land splits, Thursday Presubmittal meetings) Email: PDSDinquiries@TucsonAz.gov (for building permits) |