Permit Number: DP21-0180
Parcel: 12606200A

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP21-0180
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/05/2021 SBEASLE1 START PLANS SUBMITTED Completed
08/05/2021 SBEASLE1 ENGINEERING REVIEW Approved Approved during OK to Submit by Loren Makus, 08/05/21.
08/30/2021 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: 750 N Alvernon Way – Boiler Enclosure
Development Package (1st Review)
DP21-0180

TRANSMITTAL DATE: August 30, 2021

DUE DATE: September 02, 2021

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is July 29, 2022.

CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.2.D - The page number and the total number of pages in the package (i.e., sheet xx of xx) shall be provided within the title block.

2. COMMENT: 2-06.4.3 – Provide the development package case number, DP21-0180, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A.8 - For development package documents provide:

3. COMMENT: 2-06.4.7.A.8.c – Provide a building area expansion calculation on the plan.

2-06.4.7 - General Notes

The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

4. COMMENT: 2-06.4.7.A.4 – Per UDC Table 4.8-3: PERMITTED USES - OFFICE ZONES, O-3 Zone, Commercial Services Land Use Group With Land Use Class/Type: Medical Service: Outpatient (excluding blood donor centers), provide the Use Specific Standards that apply to this use.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

5. COMMENT: 2-06.4.9.F - All existing zoning classifications, including across any adjacent right-of-way, shall be indicated on the drawing with zoning boundaries clearly defined

6. COMMENT: 2-06.4.9.H.5.a – As this site is part of a larger site the requirements of AM 2-06.4.7.A.8.d apply to the vehicle parking space calculation. Also, the vehicle parking space calculation should include the ratio used.

7. COMMENT: 2-06.4.9.R – Per TSM Section 7-01.4.1.B A sidewalk is required adjacent and parallel to any access lane or PAAL on the side where buildings are located. Demonstrate how this requirement is met.
If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov.

To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
08/31/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
09/13/2021 JPEELDA1 FIRE REVIEW Approved
09/15/2021 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Email from: COTDSDPermits
To: lisa bowers
Wed 9/15/2021 10:08 AM

Returned for Corrections: DP21-0180
DESCRIPTION: Site - Banner University Medical Center, Outpatient Surgery Center. Boiler replacement.

Fee Balance: $0 (zero) Thank you for the payment.

SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab and you will see different sections
- Reviews section - click on REVIEW DETAILS
- Documents section - click on VIEW

INCLUDE IN RESUBMITTAL
1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

Please title your 2nd submittal documents according to this example: 2_Comment Response Letter, 09.01.21

FILEDROP for Resubmittal
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
- Select "Existing Application"
- In the "Permit Number" field, enter the number and, if applicable, any notes for our staff


Thank you.
Sharon Beasley, Permit Specialist

City of Tucson, Planning and Development Services
Email for Development Pkgs: COTDSDpermits@TucsonAz.gov
(disregard the email response that will be sent automatically)