Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP21-0174
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/18/2021 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 11/02/2021 | SBLOOD1 | ENGINEERING | REVIEW | Approved | 1. A revised drainage report will be needed when the grading plans are submitted for review. 2. For future projects make sure to use the new retention/detention manual that took effect June 1, 2021 which changes any previous/current mapped undesignated basin area and makes it balanced basin for purposes of detention/retention requirements. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
| 11/12/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: The Place at Mason Ranch Apartments Development Package (2nd Review) DP21-0174 TRANSMITTAL DATE: November 10, 2021 DUE DATE: November 15, 2021 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is July 01, 2022. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 1. This comment was not addressed correctly. General Note 5 should include both Articles 5.3 & 5.4. COMMENT: 2-06.4.7.A.6 – Revise General Note 5 to include UDC Article 5.3 Scenic Corridor Zone (SCZ). 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2. Until some type of approval is provided this comment stands. COMMENT: 2-06.4.9.A – As this site is made up of two (2) parcels, 114-51-1960 & 114-51-2060, a lot combination is required. Provide a copy of the approved Pima County Combo Request from with your next submittal. 3. This comment was not addressed correctly. Per UDC Article 7.4.9.b.2.f Each required short-term bicycle parking space must be at least two feet by six feet, that said if each bicycle requires a space 2’x6’ the minimum distance between racks is 4’-0”. Review UDC Article 7.4.9.b.2.f and Figure 7.4.9-C and provide the correct space between the racks. COMMENT: 2-06.4.9.H.5.d – As there are two (2) short-term bicycle racks shown adjacent to each other north of the BLDS #1 detail 3 sheet 5 does not address the distance between racks. Clearly show the required 2’ x 6” area for each bike on the detail. Review UDC Articles 7.4.9.B & .C and ensure that all requirements are met. Until comment 10 above is addressed Zoning cannot verify if the required number of bicycle parking has been provided. 4. COMMENT: 2-06.4.9.O – The front street perimeter yard setbacks are shown from the future property line along Bear Canyon Rd and should be shown from the back of future curb, review UDC Table 6.4.5.C-1. 5. This comment was not addressed. The area east of Bldg #1 access aisle greatly exceeds the minimum access aisle width and it appears that the area north of Bldg #10 allows all four (4) of the vehicle spaces between the access aisles to freely access the sidewalk area provide written approval from the COT Building Official that approves this design. COMMENT: 2-06.4.9.R – There are a couple of areas where it appears that there will be vehicle access allowed to the sidewalk, at the access aisle for the accessible parking east of Bldg #1 and north of Bldg #10, clarify how vehicles will be prevented from encroaching the sidewalk area. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 11/12/2021 | SBEASLE1 | PIMA COUNTY - ADDRESSING | PIMA COUNTY - ADDRESSING | Approved | Email from: <Addressing@pima.gov> To: CDRC Cc: Marty Wed 11/10/2021 10:32 AM The Place at Mason, DP21-0174, 2nd submittal review is Approved by Pima County Addressing. Thank you, Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 |
| 11/15/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Based on the information provided, it is not clear how buildings 1, 2, 5, 7, and 9 will be connecting to the private sewer collection system. Show the point of connection of each building to the private sewer. [Initial comment: Show the point of connection of each building to the private sewer. Reference: Section 107.2.1, IBC 2018.] 2. There are two manholes called out as MH 16. [Initial comment: Clarify the identification of the new manholes. There are three manholes called out as MH 4 and two manholes called out as MH 15. Reference: Section 107.2.1, IBC 2018.] 3. Without knowing the connection points for the building sewers, how can you affirmatively state that no backwater valves are required? [Initial comment: Determine the need for backwater valves per Section 714.1, IPC 2018, as amended by the City of Tucson.] |
| 11/17/2021 | AWARNER1 | LANDSCAPE | REVIEW | Approved | |
| 11/19/2021 | SBEASLE1 | COT NON-DSD | TRAFFIC | Reqs Change | Email from: <David.Stiffey@tucsonaz.gov> Sent: Thursday, November 18, 2021 7:16 AM To: CDRC <CDRC@tucsonaz.gov> Subject: The Place at Mason, DP21-0174, 2nd submittal review 1. New curbing is required along the frontage of the property as per TSM section 10-01.3.2 to adequately control drainage and access. Curbing is to be constructed per P.A.G. standard 209: please note on plans 2. New sidewalks are required along the frontage of the property as per TSM section 10-01.3.3 & 10-01.4.0 and shall be 6 Ft in width. Sidewalks are to be constructed per P.A.G. standard 200: please note on plans 3. New curb access ramps are required wherever sidewalk meets the two new entrances to the property. Curb ramps are to be constructed per P.A.G. standard 207: please note on plans 4. Please note on Sheet 2, the dimensions of the Sight Visibility Triangles 5. Sheet 1, under “Legend.” SVT is noted. Please correct the dimensions. Bear Canyon is an arterial street. Near side is to be 345 Ft. and Far side is to be 125 Ft. 6. Show existing and future Sight Visibility Triangles 7. Show existing and future Right of Way 8. Amend Sheet 3 in the same manner as these previous notes David Stiffey City of Tucson Transportation and Mobility |
| 11/19/2021 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Email from: COTDSDPermits To: Marty Magelli Fri 11/19/2021 9:47 AM Returned for Corrections: DP21-0174 DESCRIPTION: Site - The Place at Mason Ranch Apartments. 2945 N BEAR CANYON RD Fee Balance: $0 (zero) Thank you for the payment SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab to see different sections - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW INCLUDE IN RESUBMITTAL 1) Comment Response Letter (your response to REQUIRES CHANGE comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff Please title your THIRD submittal documents according to this example: 3_Comment Response Letter FILEDROP for your Resubmittal https://docs.tucsonaz.gov/Forms/tucsonpermitapp - Select "Existing Application" - In the "Permit Number" field, enter the number and, if applicable, any notes for our staff Thank you. Sharon Beasley, Building Permit Specialist City of Tucson, Planning and Development Services Email: COTDSDpermits@TucsonAz.gov (disregard the email response that will be sent automatically) |