Permit Number: DP21-0100
Parcel: 12603010A

Address:
701 N SWAN RD

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP21-0100
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/23/2021 SBEASLE1 START PLANS SUBMITTED Completed
05/11/2021 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Advanced Resource Solutions – Covered parking with solar
Development Package (1st Review)
DP21-0100

TRANSMITTAL DATE: May 11, 2021

DUE DATE: May 17, 2021

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is April 22, 2021.

2-06.3.0 FORMAT REQUIREMENTS

1. COMMENT: 2-06.3.1 – Each sheet shall measure 24 inches by 36 inches and include a minimum one inch margin on left side and one-half inch margin on all other sides to facilitate efficient record keeping. A larger sheet format may be used with the approval of the Planning and Development Services Department (PDSD).

2. COMMENT: 2-06.3.2 – All mapped data shall be drawn at an engineering scale having no more than 50 feet to the inch.

3. COMMENT: 2-06.3.7 - A small, project-location map shall be provided in the upper right corner of the cover sheet. This map shall cover approximately one square mile, be drawn at a minimum scale of three inch equals one mile, and provide the following information;
Show the subject property approximately centered within the one square mile area. Identify major streets within the square mile area and all streets that abut the subject property. Section, township, and range, north arrow, and the scale will be labeled.

4. COMMENT: 2-06.3.12 - An index of sheets in the development package shall be provided on the first sheet. The provided index listed more than the 3 sheets provided.


CONTENT REQUIREMENTS

5. COMMENT: 2-06.4.2.D - The page number and the total number of pages in the package (i.e., sheet xx of xx).

6. COMMENT: 2-06.4.3 – Provide the development package case number, DP21-0100, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

7. COMMENT: 2-06.4.7.A.1 - List as a general note: "Existing zoning is O-3."

8. COMMENT: 2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

9. COMMENT: 2-06.4.9.O - Per UDC TABLE 6.3-3.A: DIMENSIONAL STANDARDS FOR THE O-1, O-2, & O-3 ZONES, O-3 Zone, Non-Res Use to Res Zone the required perimeter yard setback to the west property line is 10’-0”, based on an allowed 2’-0” roof overhang encroachment the proposed setback is 7’-0”. There are a couple of ways to reduce the required perimeter yard setback. A setback waiver can be accomplished by providing the following text on the development package and having the adjacent owner to the south sign and date:
My Name is____________________ and I am the owner of the property located at_______________________. I have reviewed the site plan and I have no objection to structure being located or constructed________ feet from the property line as depicted on the site plan.

Signature: _____________________________

Date: _________________________________
If the neighbor signoff cannot be obtained a Design Development Option (DDO) will need to be submitted and approved prior to approval of this development package. DDO application and requirements can be found at: https://www.tucsonaz.gov/files/pdsd/forms/DDO_for_Setback_and_Height_UDC_8.11.20.pdf. A DDO is a separate submittal from the building plan and shall be submitted at: https://www.tucsonaz.gov/pdsd-filedrop, using the Submission Type “Zoning Administration”. If you have questions about the DDO application or process please contact Mark Castro at Mark.Castro@tucsonaz.gov.
If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
05/14/2021 JVINCEN1 FIRE REVIEW Approved
06/02/2021 AWARNER1 LANDSCAPE REVIEW Passed
06/02/2021 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Email sent from: COTDSDPermits
To: Joe Alitiem
Wed 6/2/2021 1:57 PM

Returned for Corrections Notice
PERMIT/ACTIVITY: DP21-0100

DESCRIPTION: SITE - Advanced Resource Solutions , solar pv system on parking shade structure. 703 N SWAN RD

FEE BALANCE: $0 (zero) Thank you for the payment.

INCLUDE IN YOUR RESUBMITTAL
1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

Please title your 2nd submittal documents according to this example: 2_Comment Response Letter, 01.01.21

FILEDROP
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
(Select "Existing Application", then enter the permit number)

SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews - click on REVIEW DETAILS
- Documents - click on VIEW


Sharon Beasley, Permit Specialist

City of Tucson, Planning and Development Services
Email for Development Pkgs: COTDSDpermits@TucsonAz.gov
(disregard the email response that will be sent automatically)
Email for Building Permits: PDSDinquiries@TucsonAz.gov