Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP21-0061
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/04/2021 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 06/07/2021 | AWARNER1 | LANDSCAPE | REVIEW | Passed | |
| 06/15/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | FROM: Development Services Department Zoning Review PROJECT: Tucson Water Well Site B-046B Development Package (2nd Review) DP21-0061 TRANSMITTAL DATE: June 15, 2021 DUE DATE: June 30, 2021 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is March 10, 2022. 2-06.4.7.A.8 - For development package documents provide: 1. This comment was not addressed correctly. TABLE 6.3-2.B: EXCEPTIONS TO THE R-1, R-2, R-3, MH-1, & MH-2 DIMENSIONAL STANDARDS, R-1 Zone does not address lot coverage related to Utilities Distribution. The 70% required in TABLE 6.3-2.B: EXCEPTIONS TO THE R-1, R-2, R-3, MH-1, & MH-2 DIMENSIONAL STANDARDS applies. COMMENT: 2-06.4.7.A.8.b – Remove General Site Note 11 as it is not applicable and provide a lot coverage calculation on the plan that meets the requirement of UDC Article 6.4.3. Per UDC TABLE 6.3-2.A: DIMENSIONAL STANDARDS FOR THE R-1, R-2, R-3, MH-1, & MH-2 ZONES, R-1 ZONE, the maximum lot coverage is 70%. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2. Until the Special Exception is approved and this comment is addressed by the SE process the DP cannot be approved. COMMENT: 2-06.4.9.O – Clearly indicate on the plans how the requirements of UDC Use Specific Standards are met. It does not appear that Use Specific Standard 4.9.11.A.1 & .2 are met. 3. Until the Special Exception is approved and this comment is addressed by the SE process the DP cannot be approved. COMMENT: 2-06.4.9.O – Clearly indicate on the plans how the requirements of UDC Use Specific Standards are met. It does not appear that Use Specific Standard 4.9.11.A.9 are met If you have any questions about this transmittal, please contact Elisa Hamblin, Elisa.Hamblin@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 06/17/2021 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change |