Permit Number: DP21-0056
Parcel: 123022530

Address:
1730 N TUCSON BL

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP21-0056
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/04/2021 SBEASLE1 START PLANS SUBMITTED Completed
03/04/2021 SBEASLE1 ENGINEERING REVIEW Approved Approved by Loren Makus on 03/01/21 during the OK to Submit.
03/11/2021 JVINCEN1 FIRE REVIEW Approved
03/31/2021 ANDREW CONNOR LANDSCAPE REVIEW Approved
04/05/2021 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change DATE: April 5, 2021
Returned for Corrections - See Zoning review comments

PERMIT/ACTIVITY: DP21-0056
DESCRIPTION: SITE - Lipman solar carports (two). 1730 N TUCSON BL

FEES DUE: $ 429.00
Please pay the total fees (or at a minimum, the REVIEW Fees). A payment is required before your next submittal.
ONLINE PAYMENT
https://www.tucsonaz.gov/pdsd/fees
If amount isn't correct, check back in a few hours after data is updated.
(Visa, MC, Discover, American Express, or pay from bank account)
1- Click on: Pay Planning & Permit Fees
2- Enter your Permit Nbr, example: dp20-0000
(not case-sensitive but a hyphen-dash- is needed)
3- Business/Individual Name: Leave blank
4- Click the blue tab: Continue
5- Under the Pay column, check the boxes
6- Click Continue

RESUBMITTAL
Submit the following documents to:
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
(Select "Existing Application", then the permit number)

1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

- Title your 2nd submittal documents starting with the submittal number,
for example: 2_Comment Response Letter, 01.01.21

SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews - click on Review Details
- Documents - click on View to the right of each document

Thank you.

City of Tucson
Attn: Sharon Beasley, Permit Specialist
Planning and Development Services
email: COTDSDPermits@TucsonAz.gov
(Disregard the automatic reply you will receive: "This email account is not...")
04/05/2021 STEVE SHIELDS ZONING REVIEW Reqs Change FROM: Development Services Department Zoning Review

PROJECT: 1730 N Tucson Blvd – Canopy Structures w/Solar
Development Package (1st Review)
DP20-0056

TRANSMITTAL DATE: April 5, 2021

DUE DATE: March 30, 2021

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is March 03, 2022.

2-06.3.0 FORMAT REQUIREMENTS

1. COMMENT: 2-06.3.2 – All mapped data shall be drawn at an engineering scale having no more than 50 feet to the inch. This plan is drawn at an architectural scale 1/8” = 1’-0”.

CONTENT REQUIREMENTS

2. 2-06.4.2.D – Provide the page number and the total number of pages in the package (i.e., sheet xx of xx) within the title block.

3. COMMENT: 2-06.4.3 – Provide the development package case number, DP21-0056, adjacent to the title block on all sheets.

4. COMMENT: 2-06.4.3 – Provide the TRE case numberTRE-2020-092, adjacent to the title block on all sheets.
5.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

6. COMMENT: 2-06.4.7.A.1 – The existing zoning shown under Note 1 is not correct and should be listed as O-3.

7. COMMENT: 2-06.4.7.A.4 – Note 2 should list the existing and proposed use as “Administrative and Professional Office, subject to Use Specific Standard 4.9.13.K”.

2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

8. COMMENT: 2-06.4.8.A - Provide site boundary/subdivision perimeter information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot. The distances shown on the plan are not correct. The north and south distance should be 127.13’ and should not include the 15’ dedicated to the City. The east and west should be 58”.

9. COMMENT: 2-06.4.8.C - The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, dimensioned width of paving, curbs, curb cuts, and sidewalks.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

10. COMMENT: 2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined.

11. COMMENT: 2-06.4.9.J - As street dedication is not required or proposed and the project site is adjacent to a Major Street or Route, draw the Major Street right-of-way (ROW) lines for Tucson Blvd. Future ROW information can be found at: https://www.tucsonaz.gov/files/pdsd/plans/MSR.pdf. Per UDC Article 6.4.5.C.2 and Figure 6.4.5.C-1 the required street perimeter yard setback is 21 or the height of the proposed exterior building wall measured to the back of future curb. As future curb was not provided or the height of the structures, setbacks cannot be verified. It appears that the proposed structure shown west of the existing building is located within the COT right-of-way. Zoning acknowledges that a TRE has been granted by DMT but a variance for street perimeter yard setback is required.

12. COMMENT: 2-06.4.9.Q – Provide the square footage and the height of the proposed canopy structures within the footprint.

If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package