Permit Number: DP21-0002
Parcel: 114511800

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP21-0002
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/26/2021 SBEASLE1 START PLANS SUBMITTED Completed
08/17/2021 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields

PROJECT: Casita Village on Catalina
Development Package (3rd Review)
DP21-0002

TRANSMITTAL DATE: August 17, 2021

DUE DATE: August 23, 2021

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is January 7, 2022.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

1. This comment was not addressed correctly. Per UDC Table 4.8-2, Residential Land Use Group With Land Use Class/Type: Multifamily Development, USE SPECIFIC STANDARDS R-2 zone the applicable Use Specific Standards are 4.9.7.B.6, .9, & .10. Provide the Use Specific Standards for multifamily listed in UDC Table 4.8-2. COMMENT: 2-06.4.7.A.4 – General Site Note 21 the existing use is listed as “GENERAL COMMERCIAL SERVICES” but should be listed as RESIDENTIAL. Also, the proposed use should also list the applicable Use Specific Standards as listed in UDC Table 4.8-2, PERMITTED USES - URBAN RESIDENTIAL, Residential Land Use Group With Land Use Class/Type: Multifamily Development for the R-2 zone. You also list a proposed use of “RETAIL/GENERAL MERCHANDISE” as a proposed use. “RETAIL/GENERAL MERCHANDISE” is not an allowed use in the R-2 Zone.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2. This comment was not address, provide the number of short-term bicycle parking spaces provided. COMMENT: 2-06.4.9.H.5.d – Provide the number of short – and long – term bicycle spaces provided within the calculation.

3. As are inspectors do not carry copies of the Unified Development Code the short-term bicycle parking details must address all requirements a refence to UDC 7.4.9 does not work. Clearly address 7.4.9.B.1.d, .e, 7.4.9.B.2.a, .b, .f . Also per UDC Article 7.4.9.B.2.d A single rack is designed and located to accommodate two bicycles. Review UDC Article 7.4.9.b and Figure 7.4.9-C and revise your detail to meet the UDC standards. Provided detail 3 sheet 73 does not address UDC Articles 7.4.9.B.1.d, .e, 7.4.9.B.2.a, .b, .f . COMMENT: 2-06.4.9.H.5.d – Provide a short – term bicycle parking detail that demonstrates how the requirements of UDC Articles 7.4.9.B.1, .2 & 7.4.9.C are met.

If you have any questions about this transmittal, please Elisa Hamblin, (520) 837-4966 or Elisa.Hamblin @tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
08/19/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
08/20/2021 SBEASLE1 PIMA COUNTY - ADDRESSING PIMA COUNTY - ADDRESSING Reqs Change Email from: <Addressing@pima.gov>
To: CDRC
Thu 8/19/2021 2:55 PM

Casitas, DP21-0002, 3rd Submittal, is Conditionally Approved by Pima County Addressing subject to correcting the legal description in the title as shown below:


Robin Freiman, Addressing Official

Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
09/09/2021 SBLOOD1 ENGINEERING REVIEW Approved
09/09/2021 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Email from: COTDSDPermits
To: B. Carroll
Cc: B. Box
Thu 9/9/2021 4:16 PM

Returned for Corrections: DP21-0002
DESCRIPTION: Site/Grading/Floodplain - Casitas on Catalina. 9125 E CATALINA HY

Fee Balance: $0 (zero) Thank you for the payment.

SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab and you will see different sections
- Reviews section - click on REVIEW DETAILS
- Documents section - click on VIEW

INCLUDE IN RESUBMITTAL
1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

Please title your 4th submittal documents according to this example: 4_Comment Response Letter, 09.01.21

FILEDROP for Resubmittal
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
- Select "Existing Application"
- In the "Permit Number" field, enter the number and, if applicable, any notes for our staff


Thank you.
Sharon Beasley, Permit Specialist

City of Tucson, Planning and Development Services
Email for Development Pkgs: COTDSDpermits@TucsonAz.gov
(disregard the email response that will be sent automatically)