Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP20-0226
Parcel: 141019270

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP20-0226
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/01/2021 SBEASLE1 START PLANS SUBMITTED Completed
03/02/2021 MROSS2 FIRE REVIEW Approved
03/02/2021 ANDREW CONNOR LANDSCAPE REVIEW Approved
03/03/2021 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

FROM: Development Services Department Zoning Review

PROJECT: Development Package (2nd Review)
DP20-0226

TRANSMITTAL DATE: March 3, 2021

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

The review comments include the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az

This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is August 16, 2021.

2-06.4.0 CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.9.E – This development package should reflect the parcel lines as shown on land split S20-072. Remove the parcel line shown running through the PAAL along the north side of the building.

2. COMMENT: 2-06.4.9.H.5.a – The vehicle parking space calculation shows that 13 spaces will be provided offsite, the plan only shows 12, 7 spaces in the northern parking area and 5 in the southern, clearly show the 13 required.

3. COMMENT: 2-06.4.9.H.5.a – Following a discussion with the Zoning Administrator the proposed use, “MEDICAL SERVICES (OUTPATIENT) called out under the Vehicle Parking Data would not be considered “Major Medical Use Group” and would qualify for the 25% reduction allowed in PAD-12 Section E-4.a.1. his would eliminate the offsite parking and a requirement for a parking agreement. If you elect to leave the parking calculation as shown on the plan the parking agreement needs to be revised to be between the two property owners not with the City and it will need to be recorded.

4. COMMENT: 2-06.4.9.L – For any vehicle/pedestrian access located off site on private property some type of access easement or agreement is required. That said some type of easement/access agreement is required for the access lane shown north of the parcel line called out under “NEW BLOCK 17 LOTLINE/RECONFIG. PER S20-072”

If you have any questions about this transmittal, please contact Elisa Hamblin, Elisa.Hamblin@tucsonaz.gov
RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
03/03/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change The building sewer for the proposed building will be connected directly to manhole 2574-01 which has a rim elevation of 2590.96. Since the FFE for the building is 2892.00, a backwater valve shall not be installed. [Initial comment: Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson. Reference: City of Tucson Administrative Manual, Section 2-06.4.8D and Section 107.2.1, IBC 2018.]
03/15/2021 ARUIZ1 ZONING-DECISION LETTER REVIEW Needs Review
03/15/2021 SBLOOD1 ENGINEERING REVIEW Approved