Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - OK TO SUBMIT
Permit Number - DP20-0221
Review Name: DEV PKG - OK TO SUBMIT
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/28/2020 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 10/29/2020 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Section Manager PROJECT: 5550 E 5th Street – 8’-0” High Chain Link Fence w/ Slats Development Package (1st Review) DP20-0221 TRANSMITTAL DATE: October 29, 2020 DUE DATE: OK to Submit COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is September 28, 2021. CONTENT REQUIREMENTS 1. 2-06.4.3 – Provide the development package case number, DP20-0221 , adjacent to the title block on all sheets. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2. 2-06.4.9.O – Per UDC Article 6.6.2.I The maximum height of a wall or fence within a perimeter yard shall be six feet; however, the wall or fence may be higher than six feet, but no higher than ten feet, if: At least 75% of the area above six feet in height is left unobstructed and open through the use of architectural elements, such as arches, columns, or wrought iron. Per UDC TABLE 6.3-2.A: DIMENSIONAL STANDARDS FOR THE R-1, R-2, R-3, MH-1, & MH-2 ZONES, R-1 Zone, Non-Residential Use to a Residential Zone the required perimeter yard setback to the south and east property line is 10’ or ¾ the height of the proposed wall, greater of the two. That all said either the proposed fence will need to meet the 10’ perimeter yard setback or the slats will need to be removed from area of the fence above 6’-0”. If you elect to remove the slats above 6’-0” provide an elevation for the proposed fence. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 10/29/2020 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 10/30/2020 | SBEASLE1 | ZONING-DECISION LETTER | WRITE DECISION LETTER | Passed |