Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP20-0196
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/31/2021 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 06/22/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The first-floor elevation of the building was not found on the drawings. The response letter states that a backwater valve is not required but item #30 of the General Notes calls for a backwater valve. [Initial comment: Provide the first-floor elevation of the building. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson.] |
| 06/29/2021 | AWARNER1 | LANDSCAPE | REVIEW | Approved | |
| 07/06/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Zoning Review PROJECT: Development Package (2nd Review) DP20-0196 TRANSMITTAL DATE: July 6, 2021 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is November 27, 2021. 1. Based on Paving plan I-031 the existing right-of-way width for 6th Ave is 79.2’ wide. 2-06.4.8.C - The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks. COMMENT: The wrong right of way width is provided for 6th Ave. 2. Provide a detail for both the short - & long – term bicycle parking that demonstrates that the requirements of UDC Articles 7.4.9.B, .C & .D are met. 2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided. COMMENT: Show the location of both long term and short term bicycle parking facilities on the plans. If you have any questions about this transmittal, please contact me at Nicholas.Ross@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 07/07/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 07/08/2021 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Email from: COTDSDPermits To; Jeff Stanley Thu 7/8/2021 4:12 PM Returned for Corrections Notice, DP20-0196 DESCRIPTION: SITE - Mata Coffee. 501 N 6TH AV FEE BALANCE: $0 (zero) Thank you for the payment. INCLUDE IN YOUR RESUBMITTAL 1) Comment Response Letter (your response to the reviewer's Requires Change comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff Please title your 3rd submittal documents according to this example: 3_Comment Response Letter, 07.01.21 FILEDROP https://docs.tucsonaz.gov/Forms/tucsonpermitapp (Select "Existing Application", then enter your permit number) SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab and you will see different sections - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW Sharon Beasley, Permit Specialist City of Tucson, Planning and Development Services Email for Development Pkgs: COTDSDpermits@TucsonAz.gov (disregard the email response that will be sent automatically) Email for Building Permits: PDSDinquiries@TucsonAz.gov |