Permit Number: DP20-0191
Parcel: 11620624A

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP20-0191
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/01/2020 SBEASLE1 START PLANS SUBMITTED Completed
10/01/2020 AHINES2 ENGINEERING REVIEW Approved
10/01/2020 SBEASLE1 UTILITIES SOUTHWEST GAS Passed
10/01/2020 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed
10/01/2020 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed
10/07/2020 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved 10/06/2020
ADOT South Central District has no comments and/or concerns for this project; due to the type of development and its location. It will pose no impact upon the state system.

Richard La Pierre
Permits Supervisor, South Central District
1221 South Second Avenue
Tucson, Arizona 85713
520.388.4234 (office), 520.307.5893 (cell)
10/13/2020 GDAURIA1 COT NON-DSD FIRE Completed
10/13/2020 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Approved (The ATTACHED PDF mentioned below can be viewed online: www.TucsonAz.gov/Pro. See the Documents section.)

October 12, 2020

West Plaza At Menlo Park Mercado District
SUBJECT: DP20-0191

Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted October 1st 2020. TEP facilities are not shown in the plans but do not appear to be in conflict with renovations. TEP facilities must be protected in place.

Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer.

In order to apply for electric service, call the New Construction Department at (520) 918-8300.
Submit a final set of plans including approved site, electrical load, paving off-site improvements
and irrigation plans, if available include a CD with the AutoCAD version of the plans.

If easements are required, they will be secured by separate instrument. Your final plans should be sent to:
Tucson Electric Power Company
Attn: Mr. Jeremy Erlacher
New Business Project Manager
P. O. Box 711 (OH 204)
Tucson, AZ 85702
520-396-2898

Should you have any technical questions, please contact the area Designer Cruz Vega at (520)
349-9850

Sincerely,
Conor Mahoney, Office Support Assistant
Design/Build
10/28/2020 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change ADMINISTRATIVE MANUAL



4.1 Identification and Descriptive Data



The Development Package will contain the following identification in the lower right corner of each sheet:



Any relevant case numbers for reviews or modifications that affect the site.



Provide Case # DP20-0191 on each sheet.



Indicate graphically, where possible, compliance with conditions of PAD-10 document.



If removing any native trees for this development provide the following:



NPPO plan per SECTION 2-11.0.0: NATIVE PLANT PRESERVATION PLAN REQUIREMENTS or Application for Exception

https://www.tucsonaz.gov/files/pdsd/forms/NPPOapp.pdf



Ensure that Zoning and Engineering comments are addressed prior to landscape section approval.





Additional comments may apply
10/28/2020 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Section Manager

PROJECT: West Plaza at Menlo Park Mercado District
Development Package (1st Review)
DP20-0191

TRANSMITTAL DATE: October 28, 2020

DUE DATE: October 29, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is September 30, 2021.

CONTENT REQUIREMENTS

1. 2-06.4.3 – Provide the development package case number, DP20-0191 , adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2. 2-06.4.7.A.6.a – Menlo Park Mercado District is located within the Rio Nuevo Area (RNA) and requires RNA review prior to approval of this DP. Contact Maria Gayosso, Maria.Gayosso@tucsonaz.gov or Nicholas Ross, Nicholas.Rosstucsonaz.gov for requirements. Once the RNA is approved provide the RNA case number adjacent to the title block on all sheets and provide a general note stating the case number, what was approved, date of approval and if applicable and conditions of approval.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
10/28/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved
10/29/2020 SBEASLE1 COT NON-DSD ENVIRONMENTAL SERVICES Approved ES has no objections to this project as it pertains to Solid Waste and Collection standards, TSM section 8.
Thanks,
Andy Vera

City of Tucson -Environmental Services
Accounts Representative Supervisor
(520) 837-3798
11/02/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
11/12/2020 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Completed
11/12/2020 SBEASLE1 COT NON-DSD REAL ESTATE Approved Should any ground or aerial encroachments into City right-of-way come to be included, applicant is requested to contact the Real Estate Division to apply for easements. Any development in public streets that cannot be addressed by a PIA should be directed to Real Estate as well.

Regards,
Michael Hollar, Senior Property Agent
Real Estate Division
Department of Transportation
Main 520-791-4181, Direct 520-837-6784
11/17/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change DATE: November 17, 2020

RETURNED FOR CORRECTIONS NOTICE
Your Next Steps: 1. Payment 2. Resubmittal of your updated/corrected documents

IMPORTANT: On the Filedrop page, select the box: "Site Review/CDRC..." when sending your next submittal.

DESCRIPTION: SITE/GRADING - West Plaza at Menlo Park Mercado District. A portion of common area "B" (plazas).

PERMIT/ACTIVITY: DP20-0191

FEES DUE: $ 2,305.70
Please pay the total fees (or at a minimum, the REVIEW Fees).
A payment is required before your next submittal.

ONLINE PAYMENTS
https://www.tucsonaz.gov/pdsd/fees

IMPORTANT: If information is not available or amount isn't correct, check back later after data is updated.
(Visa, MC, Discover, American Express, or pay from bank account)
1- Click on: Pay Planning & Permit Fees
2- Enter your Permit Nbr, example: dp20-0000
(not case-sensitive but a hyphen-dash- is needed)
3- Business/Individual Name: Leave blank
4- Click the blue tab: Continue
5- Under the Pay column, check the boxes you want to pay
6- Click Continue, then enter your credit card info
7- If any issues, try using the browser Internet Explorer

SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews - click on Review Details
- Documents - click on View to the right of each document

YOUR NEXT STEP:
Submit documents to the Filedrop
https://www.tucsonaz.gov/pdsd-filedrop
1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

- Title the documents for your 2nd submittal starting with the
submittal number, for example: 2_Plan_Set

IMPORTANT: On the Filedrop page, select the box: "Site Review/CDRC..." when sending your next submittal

City of Tucson
Attn: Sharon Beasley, Permit Specialist
Planning and Development Services
email: COTDSDPermits@TucsonAz.gov
11/17/2020 SBEASLE1 COT NON-DSD PARKS & RECREATION Approved 11/17/20
No existing or proposed Tucson Parks and Recreation facilities are affected by this development.

Howard B. Dutt, RLA, Landscape Architect
Tucson Parks and Recreation, (520) 837-8040