Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP20-0189
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/06/2021 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approv-Cond | The Landscape Section cannot fully approved proposed plans until rezoning is complete. Indicate graphically, where possible, compliance with conditions of Re-Zoning. Ensure that Zoning and Engineering comments are addressed prior to landscape section approval. Additional comment may apply |
01/06/2021 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
01/11/2021 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Approved | 01/11/21 Pima County Addressing approves Ajo Marketplace, DP20-0189, 2nd submittal. Addresses for the proposed lots in related activity S20-031 will be issued once the Final Plat is approved. Thank you. Nicholas Jordan, Addressing Specialist Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |
01/11/2021 | SBEASLE1 | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Approved | (The entire email - portion shown below - a 2nd submittal document, can be viewed online: www.TucsonAz.gov/Pro. See the Documents section.) From: Holmquist, Paul (FAA) To: Theresa Hadley Subject: RE: Form 7460 - Ajo Marketplace Date: Tuesday, December 1, 2020 4:06:18 PM Attachments: image001.png CFR 14 Part 77 Subpart B—Notice Requirements §77.9 Construction or alteration requiring notice. (e) You do not need to file notice for construction or alteration of: (1) Any object that will be shielded by existing structures of a permanent and substantial nature or by natural terrain or topographic features of equal or greater height, and will be located in the congested area of a city, town, or settlement where the shielded structure will not adversely affect safety in air navigation; The project description of proposed buildings not to exceed 40 foot AGL (approximately 2556 AMSL) at 2100 East Ajo Way, Tucson, AZ 85713 will not require FAA study under Part 77 as it meets the conditions described above for construction not requiring notice. Paul Holmquist 206-231-2990 Specialist, FAA Obstruction Evaluation Group AJV-A5 Western Service Area (WSA) Federal Aviation Administration FAA Northwest Mountain Region 2200 S 216th Street Des Moines, WA 98198 |
01/19/2021 | SBLOOD1 | ENGINEERING | REVIEW | Approved | |
01/20/2021 | ALEXANDRA HINES | ZONING | REVIEW | Approved | |
01/20/2021 | ALEXANDRA HINES | ZONING-DECISION LETTER | REVIEW | Reqs Change | DATE: January 20, 2021 TO: John Beall Entitlements Section Manager FROM: Alexandra HinesLead Planner SUBJECT: Rezoning for (C9-20-07) Dorsett - Ajo Way based on Development Package of (DP20-0189) Ajo Marketplace The above referenced development package has been conditionally-approved by the City Development Review Committee (CDRC) to prepare the rezoning ordinance for Mayor & Council adoption. The ordinance may be scheduled for Mayor & Council adoption at any time. Conditions of the rezoning per the decision of the Mayor & Council are hereby met on the Development Package. No permits or development approvals [which includes excavation, grubbing, grading, paving] may be granted that are in furtherance of the rezoning request until the 30 days have lapsed and the conditions of rezoning have been met per UDC 3.5.3.J.6. The applicant is responsible for notifying Alexandra Hines, Lead Planner, at alexandra.hines@tucsonaz.gov when the 30 days near. At that time, staff will review the ordinance adopted by Mayor & Council and the applicant will receive an approval notification to obtain the permit for the development package. Attachment: Development Package xc: Project Record by Activity Number cc: Blake Junak, Cypress Civil Lisa Bowers, Tucson Expediting & Development |
12/04/2020 | SBEASLE1 | START | PLANS SUBMITTED | Completed |