Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP20-0185
Parcel: 11106403G

Address:
3329 E GLENN ST

Review Status: Completed

Review Details: TENTATIVE PLAT REVIEW

Permit Number - DP20-0185
Review Name: TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/22/2020 SBEASLE1 START PLANS SUBMITTED Completed
09/22/2020 SBEASLE1 UTILITIES SOUTHWEST GAS Passed
09/22/2020 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed
09/22/2020 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed
09/30/2020 GDAURIA1 COT NON-DSD FIRE Completed
10/07/2020 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved October 6, 2020

SUBJECT: Water Availability for Project: 3329 E. Glenn St., APN: 11106403G
Case #: WA3280, T-13 R-14 S-33, Lots: 9999, Location Code: TUC, Total Area: .36ac, Zoning: R-2

WATER SUPPLY
Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson
Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources
(ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for
demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject
project.

WATER SERVICE
The approval of water meter applications is subject to the current availability of water service at the time an
application is received. The developer shall be required to submit a water master plan identifying, but not limited
to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed
Connection Points to Existing Water System; and 5) Easements/Common Areas.

Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the
developer. If the existing water system is not capable of meeting the requirements of the proposed development,
the developer shall be financially responsible for modifying or enhancing the existing water system to meet those
needs.

This letter shall be null and void two years from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing
construction review comments relative to conflicts with existing water lines and the proposed development.
If you have any questions, please call New Development at 791-4718.

Michael Mourreale, Engineering Manager
Tucson Water New Development
10/19/2020 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change ADMINISTRATIVE MANUAL
4.1 Identification and Descriptive Data
The Development Package will contain the following identification in the lower right corner of each sheet:
Any relevant case numbers for reviews or modifications that affect the site

Provide Case # DP20-0185 on each sheet.

Ensure that Zoning comments are addressed prior to landscape section approval.
Additional comments may apply
10/20/2020 ALEXANDRA HINES COT NON-DSD PARKS & RECREATION Approved No existing or proposed Tucson Parks and Recreation facilities are affected by this tentative plat.

Howard B. Dutt, RLA
Landscape Architect
Tucson Parks and Recreation
(520) 837-8040No existing or proposed Tucson Parks and Recreation facilities are affected by this tentative plat.

Howard B. Dutt, RLA
Landscape Architect
Tucson Parks and Recreation
(520) 837-8040
10/20/2020 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Section Manager

PROJECT: 3329 E Glenn St
Development Package (1st Review)
DP20-0185

TRANSMITTAL DATE: October 20, 2020

DUE DATE: October 20, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is September 21, 2021.

2-06.3.0 FORMAT REQUIREMENTS

1. 2-06.3.12 – An index of sheets in the development package shall be provided on the first sheet.

CONTENT REQUIREMENTS

2. 2-06.4.2.B – Add to the title block that this is a resubdivision of lot 9, Bk 7 Granada Park

3. 2-06.4.2.C – Provide the total number of lots within the title block.

4. 2-06.4.3 – Provide the development package case number, DP20-0185, adjacent to the title block on all sheets.

5. 2-06.4.4.A – Clearly show the subject property approximately centered within the one square mile area;

6. 2-06.4.4.B - Identify all streets that abut the subject property on the location map.

7. 2-06.4.4.C – Label the section corners on the location map.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

8. 2-06.4.7.A.4 – Provide the Use Specific Standards that apply to a Single-family, Detached in the R-2 zone, see UDC TABLE 4.8-2: PERMITTED USES - URBAN RESIDENTIAL ZONES.

2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

9. 2-06.4.8.C – Provide the following information for Glenn St on the plan right-of-way width, type and dimensioned width of paving, curbs, curb cuts, and sidewalks.

10. Per UDC Article 6.6.2.B An accessory building shall be built only on a lot occupied by a principal building or use. That said the “Temp Sheds” shown on the plan will need to be removed prior to approval of this DP.


If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
10/20/2020 ALEXANDRA HINES UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power Co., (TEP) has reviewed and approves the Tentative Plat submitted for review on September 22, 2020. Developer is responsible for costs associated with relocation or removal of existing electrical facilities. Additional TEP easements may be required by separate instrument for service to future development.

If there are any questions, please contact me at 520-401-9895.



Thank you,

Mary Burke
Senior Right of Way Agent
Tucson Electric Power Co.
Land Resources – RC 131
3950 E. Irvington Road
Tucson, AZ 85714-2114
Cell - 520-401-9895
mburke@tep.com
10/28/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Revise the site drawing to include the following existing utility information:
a. The location and size of water lines, and fire hydrants.
b. The location and size of sanitary sewers, including the pipe diameter and the invert and rim elevations of all manholes and cleanouts; along with the Pima County Wastewater Management Department (PCWMD) reference number.
Reference: City of Tucson Administrative Manual, Section 2-06.4.8D and Section 107.2.1, IBC 2018.
2. For the purposes of having a water meter, a parcel is required to have a minimum width of 15-feet of frontage on a water main. An easement is not considered to be frontage. Reference: Tucson Water Remote Meter Policy, Number IV-B.08, dated 07/14/2009.
3. Each occupiable building shall have an independent connection to the public sewer (i.e. a joint sewer use agreement is not allowed for new construction). Reference: Section 701.3, IPC 2018.
4. Provide the rim elevation of the next upstream sanitary manhole and the compare it to the first-floor elevation of the proposed houses. Determine the need for backwater valves per Section 714.1, IPC 2018, as amended by the City of Tucson.
10/28/2020 SBEASLE1 PIMA COUNTY ADDRESSING Needs Review This project has a balance due of $230. The applicant was invoiced on 9/17/2020. We will be able to begin review after payment is made.

Thank you
Nicholas Jordan, Addressing Specialist
10/28/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved
11/18/2020 SBLOOD1 ENGINEERING REVIEW Reqs Change 1. The site is within the Floodplain. Please add notes to plans per Administrative Manual section 2-06.4.8.I. A Floodplain Use Permit will be required when building permits are reviewed.

Stephen Blood
stephen.blood@tucsonaz.gov
11/18/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change DATE: November 18, 2020

RETURNED FOR CORRECTIONS NOTICE
Your Next Steps: 1. Payment 2. Resubmittal of your updated/corrected documents

IMPORTANT: On the Filedrop page, select the box: "Site Review/CDRC..." when sending your next submittal.

DESCRIPTION: Tentative Plat - 3329 E. Glenn Street.

PERMIT/ACTIVITY: DP20-0185

FEES DUE: $ 1,481.50
Please pay the total fees (or at a minimum, the REVIEW Fees).
A payment is required before your next submittal.

ONLINE PAYMENTS
https://www.tucsonaz.gov/pdsd/fees

IMPORTANT: If information is not available or amount isn't correct, check back later after data is updated.
(Visa, MC, Discover, American Express, or pay from bank account)
1- Click on: Pay Planning & Permit Fees
2- Enter your Permit Nbr, example: dp20-0000
(not case-sensitive but a hyphen-dash- is needed)
3- Business/Individual Name: Leave blank
4- Click the blue tab: Continue
5- Under the Pay column, check the boxes you want to pay
6- Click Continue, then enter your credit card info
7- If any issues, try using the browser Internet Explorer

SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews - click on Review Details
- Documents - click on View to the right of each document

YOUR NEXT STEP:
Submit documents to the Filedrop
https://www.tucsonaz.gov/pdsd-filedrop
1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

- Title the documents for your 2nd submittal starting with the
submittal number, for example: 2_Plan_Set

IMPORTANT: On the Filedrop page, select the box: "Site Review/CDRC..." when sending your next submittal

City of Tucson
Attn: Sharon Beasley, Permit Specialist
Planning and Development Services
email: COTDSDPermits@TucsonAz.gov