03/16/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The rim elevation of the next upstream sanitary manhole (MH-E, 2611.23') is higher than the first floor elevation of Building B (2610.75'). Provide a note on the plans requiring the installation of a backwater valve when future plumbing activities take place. Reference: Section 714.1, IPC 2018, as amended by the City of Tucson. |
03/18/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TAC2 – New Shell Building Development Package (1st Review - Revision #1) DP20-0173 TRANSMITTAL DATE: March 18, 2022 DUE DATE: March 22, 2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is September 14, 2021. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 – Remove the DP21-0322 reference on sheets 55-95 and provide the correct DP20-0173 on the plans. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2. COMMENT: 2-06.4.9.A – As it appears that a lot line reconfiguration is proposed the reconfiguration process must be completed prior to approval of this DP. The reconfiguration can be used to combine all existing parcels. Contact Elisa Hamblin for direction on how to complete this process. 3. COMMENT: 2-06.4.9.A – Sheet 2 Site Plan Keynotes #4 you state “EXISTING PARKING LOT TO BE REMOVED AND RELOCATED TO EXISTING PROPERTY TO THE SOUTH- UNDER SEPARATE PERMIT”. A separate development package meeting the requirements of AM 2-06 will need to be submitted and approved for the relocation of the vehicle parking prior to approval of this plan. 4. COMMENT: 2-06.4.9.H.5 – Provide width dimensions for all proposed PAALs, access lanes, parking spaces, sidewalks, etc., for Phase B similar to what was shown on sheets 4 – 9 Phase A. 5. COMMENT: 2-06.4.9.R – Provided width dimensions for all proposed sidewalks in Phase B. 6. COMMENT: 2-06.4.9.R – Provide the required pedestrian circulation path between the two buildings, see TSM Section 7-01.3.3B. This path shall be an accessible path, see TSM Section 7-01.3.2. 7. COMMENT: DP21-0332 will need to be withdrawn. To withdraw this DP send a letter requesting that the DP be withdrawn to CDRC@tucsonaz.gov. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
03/23/2022 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Provide a sheet showing all fire related items and or make sure that there are clear notes showing the aerial access to both buildings also with a note stating that parking/solar structures shall never be installed/erected in these areas. Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 Fire Plans Examiner |
04/12/2022 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. Revise the crosswalk north of Building B so it does not cross behind the accessible parking space. 2. Indicate all landscape areas including tree islands will be depressed 6 to 9 inches. This needs to be shown in applicable details. 3. Provide updated cut and fill quantities for the project. For reviewer convenience provide quantities for both phases as well as for the overall project. Loren Makus loren.makus@tucsonaz.gov |
04/26/2022 | AWARNER1 | LANDSCAPE | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Planning and Development Services Department, Plans Coordination FROM: Anne Warner, RLA PDSD Landscape/Native Plant Preservation Section PROJECT: Tucson Airport Center ACTIVITY NO: DP20-0173 Address: 2830 E Medina Zoning: Existing Use: undisturbed Sonoran Desert Proposed Use: TRANSMITTAL DATE: April 26, 2022 DUE DATE: March 22, 2022 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Landscape Review Section comments were addressed. This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting. 1. UDC 2-10.4.1 Identification and Descriptive Data - All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan. 2. Ensure that Zoning and Engineering comments are addressed prior to landscape section approval. 3. Please distinguish between the mitigation/salvage plants and the other required plants on the legend, symbol or any other method that would communicate the information. Also, in future submittals, please sort the plant inventory by species rather than tag number (assists in review). 4. Remove the off site parking area tree calculation if not included in this submittal. 5. Please provide all landscape calculations on the landscape plan, including required trees for the parking areas, Admin. Manual 2-10-4.2.A.2.c and landscape borders, UDC Technical Standards 2-10.4.2.f & g. 6. Please label the existing and future rights of way for E Medina Rd, UDC 7.6.4.C.2.a. 7. Please locate trees so that they are maximizing shade over asphalt, some could be placed closer to the curb or offset in the median to provide more shade. 8. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.B.1.a., UDC Technical Standards Manual 5-01-.3.2. There is a row of parking along the west and east sides without shade (L1.1). 9. Identify the point of drainage off roof areas, amount of flow, and disposition of flow. 10. Decomposed granite is prohibited at basin floors, unless 4” or greater in size 11. Please note that smaller caliper trees can used for TOS and may be counted towards larger caliper tree quantities. 12. Information only – UDC 7.7.5 On- monitoring of all aspects of site clearing, grading, plant protection, preservation, salvage, and mitigation must be provided during project construction at the expense of the developer for all residential development that is over five acres and for all commercial and industrial development that is over one acre . The monitoring must be performed by an individual who is qualified in arid lands native plant resource identification and protection as specified in UDC Section 7.7.4.D, Professional Expertise. The monitor must provide periodic progress reports to the developer outlining the status of work accomplished and any problems encountered. A copy of these reports must be submitted to the PDSD for the project file. 13. Information only - UDC 7.7.6 The monitor is responsible for an assessment of the condition of the site’s plants one year after the final inspection has been performed on the site. The monitor shall visit the site and prepare a report on plant status, including general plant condition, the identification of plants under stress and the appropriate method to relieve the stress, and recommendations for replacement of plants that are dead or dying. Dead or dying plants must be replaced with the same size plant at a one-to-one ratio of like genus and species. Copies of the report must be submitted to the site owner/developer and to PDSD. The owner must respond to the plant needs as outlined in the status report within six months of report submittal or within a shorter period if required to improve the health of stressed plants and prevent plant loss. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package YOUR NEXT STEPS: Submit documents to the Filedrop https://docs.tucsonaz.gov/Forms/tucsonpermitapp Select "Existing Application" 1) Comment Response Letter (your response to the reviewer's Requires changes comments) 2) Plan Set (or individual sheets) 3) Any other items requested by review staff If you have any questions, please contact me at anne.warner@tucsonaz.gov |
04/27/2022 | SBEASLE1 | ZONING-DECISION LETTER | WRITE DECISION LETTER | Reqs Change | Email from: COTDSDPermits To: Jennifer K. Wed 4/27/2022 1:56 PM REVISION REVIEW NOTICE Returned for corrections, DP20-0173 DESCRIPTION: SITE/GRADING/SWPPP - Tucson Airport Center (TAC 2), new shell building, phases one and two. 6818 S COUNTRY CLUB RD REVISION FEES DUE: $ 2,033.13 See the "Balance" column in the image at end of this email "8618 Building Plan Review" fees were added by Engineering for the grading/Swppp review The $511.50 revision fee payment was received. Thank you. See the 2nd image at end of this email ONLINE PAYMENTS https://www.tucsonaz.gov/pdsd/fees If amount doesn't match "Revision Fees Due", check back in a few hours after it is updated. 1- Click on: Pay Planning & Permit Fees 2- Enter your Permit Nbr, example: dp20-0000 (not case-sensitive but a hyphen-dash- is needed) 3- Business/Individual Name: Leave blank 4- Click the blue tab: Continue 5-Under the Pay column, check the boxes you want to pay 6- Click Continue, then enter your credit card info VIEW the review comments and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews - click on Review Details - Documents - click on View to the right of each document YOUR NEXT STEPS: Submit documents to the Filedrop https://docs.tucsonaz.gov/Forms/tucsonpermitapp Select "Existing Application" 1) Comment Response Letter (your response to the reviewer's Requires changes comments) 2) Plan Set (or individual sheets) 3) Any other items/documents requested by review staff Thank you. Sharon Beasley, Certified Permit Technician City of Tucson, Planning and Development Services Email: COTDSDpermits@TucsonAz.gov |