Permit Number: DP20-0164
Parcel: 11712103C

Address:
1 S CHURCH AV

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP20-0164
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/21/2020 SBEASLE1 START PLANS SUBMITTED Completed
08/21/2020 SBEASLE1 ENGINEERING REVIEW Passed Passed by Loren Makus, 08/20/20 during OK to Submit.
08/21/2020 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Reqs Change (The TEP FACILITIES MAP mentioned below and a TEP REVIEW document can be viewed online: www.TucsonAz.gov/Pro. See the Documents section.)

August 24th, 2020

SUBJECT: One South Church Hotel, DP20-0164

Tucson Electric Power Company (TEP) has reviewed the development plan submitted
August, 21, 2020 TEP is unable to approve the plan at this time. TEP has facilites on the South and West side of 1 S. Church Ave. that are not depicted in the plans.

Enclosed is a copy of a TEP facility map showing the approximate location of the existing facilities. All costs associated with the relocation of the facilities in conflict will
be billable to the developer.
Please resubmit a revised blueline to the City of Tucson for TEP’s review. Should you have any technical questions, please contact the area Designer, Cruz Vega, at (520)
349-9850 should you have any questions.
Sincerely,
Conor Mahoney, Office Support Assistant
Design/Build
08/21/2020 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved ADOT South Central District has no comments and/or concerns for this project; due to the development location. It will pose no impact upon the state system.

Richard La Pierre
Permits Supervisor, South Central District
1221 South Second Avenue, Tucson, Arizona 85713
520.388.4234 (office)
08/21/2020 SBEASLE1 UTILITIES SOUTHWEST GAS Passed
08/21/2020 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed
08/21/2020 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed
08/25/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
08/26/2020 MGAYOSS1 DESIGN PROFESSIONAL REVIEW Needs Review 8/26/2020 - Review by Maria Gayosso.
Project is located in the Infill Incentive District - Rio Nuevo Area. Applicant has not filed an application RNA or IID for review.
09/03/2020 SBEASLE1 COT NON-DSD ENVIRONMENTAL SERVICES Approved EGSD has no comments regarding One South Church Hotel, DP20-0164, 1st submittal

There appears to be nothing proposed or relative to solid waste collection and disposal requirements.

Thanks,

Andy Vera
City of Tucson - Environmental Services
Accounts Representative Supervisor
(520) 837-3798
09/08/2020 GDAURIA1 COT NON-DSD FIRE Approved
09/16/2020 SBEASLE1 COT NON-DSD PARKS & RECREATION Approved No existing or proposed Tucson Parks and Recreation facilities are affected by this development.

Howard B. Dutt, RLA, Landscape Architect
Tucson Parks and Recreation, (520) 837-8040
09/21/2020 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change ADMINISTRATIVE MANUAL

Identification and Descriptive Data


All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.



The Development Package will contain the following identification in the lower right corner of each sheet:



Any relevant case numbers for reviews or modifications that affect the site.



Provide Case # DP20-0164 on each sheet.



The site is within the following Overlay District:



Infill Incentive District



DOWNTOWN CORE SUBDISTRICT



LANDSCAPING AND SCREENING



A complete or partial exception to the landscaping and screening requirements in Section 7.6 may be granted by the PDSD Director, if shade along sidewalks, pedestrian circulation paths or outdoor patios is provided for pedestrians and customers in accordance Section 5.12.6.A.2. Alternative pedestrian access that creates connectivity between public entrances to the project and abutting sidewalk is allowed if no safety hazard is created. All pedestrian access must conform to the accessibility standards of the City's Building Code.



Ensure that Zoning, Engineering and Design Professional comments are addressed prior to landscape section approval.



Additional comments may apply
09/21/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Reqs Change DP20-0164
September 21, 2020
Zelin Canchola
Transportation and Mobility Engineering

The plan requires chaange. Perk Tucson has provided comments concerning parking and loading zones. Please contact Prk Tucson for requirements.

From Donovan Durband:

I'm concerned about losing the freight loading zone for that block. The remaining office businesses in the tower would need a delivery zone, I'm sure, and so would the hotel.
An option would be to co-locate the valet/ride-hailing zone with both the freight loading zone in its current location and the metered parking in its current location. The metered parking spaces could be designated for valet and passenger loading/unloading after 5pm and on weekends, and the freight loading could be time-limited to mornings, allowing that zone to be used for other deliveries and passenger loading/unloading the remainder of the time (afternoons, evenings, weekends).


Donovan Durband, M.S., CAPP
Administrator, Park Tucson
City of Tucson Department of Transportation & Mobility
Donovan.Durband@tucsonaz.gov
www.ParkTucson.com

Zelin Canchola
zelin.canchola@tucsonaz.gov
09/22/2020 JOE LINVILLE COT NON-DSD LANDSCAPE Needs Review Needs TDOT review.
09/25/2020 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Site Section Manager

PROJECT: 1 South Church Hotel
Development Package (1st Review)
DP20-0164

TRANSMITTAL DATE: September 25, 2020

DUE DATE: September 21, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

The review comments include the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az

This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is August 20, 2021.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section

2-06.1.0 GENERAL

2-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS

2-06.3.0 FORMAT REQUIREMENTS

2-06.4.0 CONTENT REQUIREMENTS

2-06.5.0 FLEXIBLE LOT DEVELOPMENT (FLD) - ADDITIONAL REQUIREMENTS

2-06.1.0 GENERAL

2-06.1.1 PURPOSE
This standard has been prepared for the purpose of informing applicants of the submittal and review requirements for development package documents to assure proper and adequate information is presented in a consistent manner, thereby providing the basis for an efficient and timely review. The development package documents are prepared in support of applications for building permits and related reviews.

The information that is requested establishes the basis upon which the project will be approved and could affect what is required of the property in the future, should there be a proposal for expansion or for a different use of the property.

This standard does not waive any applicable city regulations or codes.

2-06.1.2 APPICABILITY
This standard shall be used for all site plans and tentative plats submitted to PDSD for review.

2-06.2.1 APPLICATION SUBMITTAL REQUIREMENTS
Development Package applications are available from PDSD. Completed applications and accompanying materials shall be submitted to PDSD. Incomplete or inaccurate applications will not be accepted, nor will any application in which the pre-application conference or neighborhood meeting requirements have not been met. The types of documents and the specific number of copies required of each of the documents are on the PDSD website or may be obtained from PDSD. Resubmittals of development packages require a comment response letter that details how all previous comments have been addressed. Provide the same number of copies of the comment response letter as plans provided.
The following documents and information shall be submitted upon application:

2-06.2.1 Application Form
A completed application signed by the property owner or authorized designee;

2-06.2.2 Development Package
A development package must be prepared to the format and content requirements described herein;

2-06.2.3 Related Reviews
In addition to the plan process, a project may require review for other types of plans and documents. The applications for those processes are submitted to the appropriate department for review and approval. These related reviews can be applied for so that review can occur concurrently with the development package application. However, it must be understood that, should the related application be approved subject to conditions or denied, this may affect the;

2-06.2.4 Concurrent Reviews
The development package is designed to allow for concurrent review of any site related reviews. Concurrent review means that all plans and documents needed for the review are submitted as one package. Examples of site related reviews include but are not limited to: site plans, landscape plans, NPPO plans, water harvesting plans, grading plans, SWPPP plans, floodplain use permits, and overlay reviews. Separate applications are often required for the different site related reviews even if the plans are submitted concurrently; and,

2-06.2.5 Fees
Fees in accordance with Section 4-01.0.0, Development Review Fee Schedule.

2-06.4.0 CONTENT REQUIREMENTS

1. 2-06.4.3 - Provide the Development Package case number, DP20-0164, adjacent to the title block on all sheets.

2. 2-06.4.4 - The project-location map to be located on the first sheet of the development package in the upper right corner, shall cover approximately one square mile, be drawn at a minimum scale of three inch equals one mile

3. 2-06.4.4.C - Section, township, and range; section corners; north arrow; and the scale will be labeled on the location map.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

4. 2-06.4.7.A.4 - The proposed "HOTEL" use should be listed as "TRAVELERS ACCOMMODATION, LODGING".

5. 2-06.4.7.A.6.a - As this site is located within the down town core and the Rio Nuevo Area (RNA) and you are proposing an exterior patio RNA & Historic review may be required. Contact Maria Gayosso, Maria.Gayosso@tucsonaz.gov for requirements and process.

6. 2-06.4.7.A.6.b - If RNA or Historic review is required provide the case number adjacent to the title block on all sheets.

2-06.4.7.A.8 - For development package documents provide:

7. 2-06.4.7.A.8.a - Provide the floor area for the proposed patio on the plan.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

8. 2-06.4.9.Q - Provide the square footage of the proposed patio within the footprint on the plan.

9. 2-06.4.9.W - All signage will require a separate review and permit.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
09/25/2020 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Site Section Manager

PROJECT: 1 South Church Hotel
Development Package (1st Review)
DP20-0164

TRANSMITTAL DATE: September 25, 2020

DUE DATE: September 21, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

The review comments include the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az

This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is August 20, 2021.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section

2-06.1.0 GENERAL

2-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS

2-06.3.0 FORMAT REQUIREMENTS

2-06.4.0 CONTENT REQUIREMENTS

2-06.5.0 FLEXIBLE LOT DEVELOPMENT (FLD) - ADDITIONAL REQUIREMENTS

2-06.1.0 GENERAL

2-06.1.1 PURPOSE
This standard has been prepared for the purpose of informing applicants of the submittal and review requirements for development package documents to assure proper and adequate information is presented in a consistent manner, thereby providing the basis for an efficient and timely review. The development package documents are prepared in support of applications for building permits and related reviews.

The information that is requested establishes the basis upon which the project will be approved and could affect what is required of the property in the future, should there be a proposal for expansion or for a different use of the property.

This standard does not waive any applicable city regulations or codes.

2-06.1.2 APPICABILITY
This standard shall be used for all site plans and tentative plats submitted to PDSD for review.

2-06.2.1 APPLICATION SUBMITTAL REQUIREMENTS
Development Package applications are available from PDSD. Completed applications and accompanying materials shall be submitted to PDSD. Incomplete or inaccurate applications will not be accepted, nor will any application in which the pre-application conference or neighborhood meeting requirements have not been met. The types of documents and the specific number of copies required of each of the documents are on the PDSD website or may be obtained from PDSD. Resubmittals of development packages require a comment response letter that details how all previous comments have been addressed. Provide the same number of copies of the comment response letter as plans provided.
The following documents and information shall be submitted upon application:

2-06.2.1 Application Form
A completed application signed by the property owner or authorized designee;

2-06.2.2 Development Package
A development package must be prepared to the format and content requirements described herein;

2-06.2.3 Related Reviews
In addition to the plan process, a project may require review for other types of plans and documents. The applications for those processes are submitted to the appropriate department for review and approval. These related reviews can be applied for so that review can occur concurrently with the development package application. However, it must be understood that, should the related application be approved subject to conditions or denied, this may affect the;

2-06.2.4 Concurrent Reviews
The development package is designed to allow for concurrent review of any site related reviews. Concurrent review means that all plans and documents needed for the review are submitted as one package. Examples of site related reviews include but are not limited to: site plans, landscape plans, NPPO plans, water harvesting plans, grading plans, SWPPP plans, floodplain use permits, and overlay reviews. Separate applications are often required for the different site related reviews even if the plans are submitted concurrently; and,

2-06.2.5 Fees
Fees in accordance with Section 4-01.0.0, Development Review Fee Schedule.

2-06.4.0 CONTENT REQUIREMENTS

1. 2-06.4.3 - Provide the Development Package case number, DP20-0164, adjacent to the title block on all sheets.

2. 2-06.4.4 - The project-location map to be located on the first sheet of the development package in the upper right corner, shall cover approximately one square mile, be drawn at a minimum scale of three inch equals one mile

3. 2-06.4.4.C - Section, township, and range; section corners; north arrow; and the scale will be labeled on the location map.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

4. 2-06.4.7.A.4 - The proposed "HOTEL" use should be listed as "TRAVELERS ACCOMMODATION, LODGING".

5. 2-06.4.7.A.6.a - As this site is located within the down town core and the Rio Nuevo Area (RNA) and you are proposing an exterior patio RNA & Historic review may be required. Contact Maria Gayosso, Maria.Gayosso@tucsonaz.gov for requirements and process.

6. 2-06.4.7.A.6.b - If RNA or Historic review is required provide the case number adjacent to the title block on all sheets.

2-06.4.7.A.8 - For development package documents provide:

7. 2-06.4.7.A.8.a - Provide the floor area for the proposed patio on the plan.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

8. 2-06.4.9.Q - Provide the square footage of the proposed patio within the footprint on the plan.

9. 2-06.4.9.W - All signage will require a separate review and permit.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
10/02/2020 SBEASLE1 COT NON-DSD REAL ESTATE Approved 10/01/20
Should any ground or aerial encroachments into City right-of-way come to be included, applicant is requested to contact the Real Estate Division to apply for easements. Any development in public streets that cannot be addressed by a PIA should be directed to Real Estate as well.

Regards,
Michael Hollar, Senior Property Agent
Real Estate Division
Department of Transportation
Main 520-791-4181, Direct 520-837-6784
Michael.Hollar@tucsonaz.gov
10/02/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change DATE: Oct. 2, 2020

RETURNED FOR CORRECTIONS NOTICE
Your Next Steps: 1. Payment 2. Resubmittal of your updated/corrected documents

IMPORTANT: On the Filedrop page, select the box: "Site Review/CDRC..." when sending your next submittal.

DESCRIPTION: SITE / IID - One South Church Hotel. Exterior improvements.

PERMIT/ACTIVITY: DP20-0164

FEES DUE: $ 1,206.50
Please pay the total fees (or at a minimum, the REVIEW Fees). A payment is required before your next submittal.

ONLINE PAYMENTS **Allow 1-2 days for correct amount to show**
https://www.tucsonaz.gov/pdsd/fees
(Visa, MC, Discover, American Express or pay from checking account)
1- Click on: Pay Planning & Permit Fees
2- Enter your Permit Nbr, example: dp20-0000
(not case-sensitive but a hyphen-dash- is needed)
3- Business/Individual Name: Leave blank
4- Click the blue tab: Continue
5- Under the Pay column, check the boxes you want to pay
6- Click Continue, then enter your credit card info
7- If any issues, try using the browser Internet Explorer

SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews - click on Review Details
- Documents - click on View to the right of each document

YOUR NEXT STEP:
Submit documents to the Filedrop
https://www.tucsonaz.gov/file-upload-pdsd
1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

- Name the 2nd submittal documents starting with the
submittal number, for example: 2_Plan_Set

IMPORTANT: On the Filedrop page, select the box: "Site Review/CDRC..." when sending your next submittal.

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
email: COTDSDPermits@TucsonAz.gov